Investing№ 172NYSE: AEM
Agnico Eagle
Agnico Eagle mines gold in Canada, Australia, Finland and Mexico and holds 55.4 million ounces of reserves; its free cash flow was US$4.2B in the twelve months to September 2026, and at US$151.30 the price is 123% above my base value.
Updated Fiscal year ends 31 December51 min readPedrum Shokouhi
Thin moat
Research, not investment advice. Figures as of .
Key numbers
- RevenueUS$15.0B (calculated)TTM to September 2026; US$11.9B in 2025 [2][3]
- Free cash flowUS$4.2B (calculated)TTM, after about US$1.3B of 2025 tax paid in 2026; US$4.4B in 2025 [4][3]
- All-in sustaining costUS$1,529 (reported)Nine months of 2026, by-product; Q3 US$1,648; 2026 guide US$1,400 to US$1,550 [5]
- Gold realizedUS$4,264 (reported)Third quarter, per ounce; US$4,537 for nine months [3]
- Net cashUS$3.4B (reported)30 September; US$3.6B of cash and US$0.2B of notes [3]
- Gold reserves55.4 Moz (reported)31 December 2025, at US$1,600 an ounce [6]
(reported)Reported in a filing (calculated)Calculated from reported figures (estimate)My estimate
The answer
- Agnico Eagle mines gold, and almost nothing else, in Canada, Australia, Finland and Mexico: it produced 3.45 million ounces in 2025, holds 55.4 million ounces of reserves counted at US$1,600 gold, and in the twelve months to September 2026 turned US$15.0B of revenue into US$4.2B of free cash flow, with 85% of nine-month sales from Canada (calculated).7632
- I value it at $68 a share, in a range of $27 to $191, on gold at US$3,515 an ounce in 2027 rising 2% a year; that is the 20 November futures settle, within about US$25 of spot, and 34% under the January record; each US$1,000 on gold is worth about US$46 a share, and I can’t forecast gold, so I show the whole line and not one number (estimate).89103
- At $151.30 the price is 123% above my base value and inside my range; the shares are 40% under their March high and still need gold near US$5,350 for good at my 8.5% required return, above the January record close, or a return near 5.1% with gold where it is and every project built, and my margin-of-safety price is $55; this page shares one idea with Newmont and Franco-Nevada, the gold price, so they are not independent bets (estimate).1811
Six questions, one line each
- Why
- Gold has risen faster than the cost of digging it: in 2016 an ounce sold for US$1,249 against an all-in sustaining cost of US$824, a margin of US$425; in 2025 it sold for US$3,454 against US$1,339, a margin of US$2,115 (calculated).127 →
- The moat
- A commodity gives no pricing power; what Agnico has is where the ounces are: 85% of nine-month sales came from Canada, no gold forward sales, US$3.4B of net cash and an A- credit rating from Fitch since April (calculated).3 →
- The advantage
- The edge is that it is a pure gold miner whose cost is below Newmont’s on a co-product basis, with a pipeline it says could add 20% to 30% to output in a decade; the weak spot is that costs keep rising, up 62% in nine years, and 2026 is on the upper end of guidance (calculated).547 →
- Management
- Ammar Al-Joundi has been chief executive since February 2022; 37.5% of the payout on his performance share units depends on the company’s price-to-asset-value multiple against peers, so part of his pay depends on the premium itself, and the company paid an average US$188 a share for stock in 2026, 176% above my base value (calculated).133 →
- Margin of safety
- My margin-of-safety price is $55, which is 19% under my base, where the base case would earn about 11.5% a year; my bear value is $27 (estimate) →
The business
Agnico Eagle digs gold out of the ground and sells it. In 2025 gold was US$11.72B of the US$11.91B of sales, or 98.4%; silver, zinc and copper were the rest.2 It has produced precious metals since 1972, is based in Toronto, and has paid a dividend every year since 1983.3 It sells its gold at the market price: it has a stated policy of no forward gold sales, so shareholders get the full effect of the price in both directions.7 The shares trade in New York and, as AEM, on the TSX; I price them in US dollars on the New York listing, and the company reports in US dollars under international accounting rules.3
It runs ten mines. In Quebec there are LaRonde, Canadian Malartic and Goldex; in Ontario Detour Lake and Macassa; in Nunavut Meliadine and Meadowbank; Fosterville in Victoria, Australia; Kittila in Finland; and Pinos Altos in Mexico.3 Detour Lake is the largest, at 23% of nine-month sales. The four countries split as Canada 85.4%, Finland 6.8%, Australia 4.8% and Mexico 2.9% of nine-month sales (calculated).3
Payable production in 2025 was 3,447,367 ounces, above the middle of the company’s guidance. Total cash costs were US$979 an ounce, all-in sustaining costs US$1,339, and the average realized gold price US$3,454.7 Revenue was US$11.91B, net income US$4.46B or US$8.86 a share diluted, and free cash flow US$4.40B, a record (reported).24 In the first nine months of 2026 the company produced 2,494,937 ounces and sold gold at US$4,537; sales were US$11.49B, net income US$4.65B and free cash flow US$2.92B.3 The third quarter alone produced 814,012 ounces at US$1,648 AISC.5
Where the money comes from
Sales, gold produced, cost per ounce and the end of each mine’s disclosed life, first nine months of 2026, US$ millions and US$ an ounce.
| Mine | Place and method | Sales | Share | Gold, thousand oz | Cash cost | Cash cost plus sustaining capital | Life to |
|---|---|---|---|---|---|---|---|
| Detour Lake (reported) | Ontario, Canada; open pit | US$2,616M | 22.8% (calculated) | 567 | US$887 | US$1,262 (calculated) | 2052 |
| Canadian Malartic (reported) | Quebec, Canada; open pit, Odyssey underground | US$1,838M | 16.0% (calculated) | 413 | US$1,196 | US$1,353 (calculated) | 2042 |
| Meadowbank (reported) | Nunavut, Canada; open pit, underground | US$1,500M | 13.1% (calculated) | 330 | US$1,152 | US$1,436 (calculated) | 2030 |
| Meliadine (reported) | Nunavut, Canada; underground | US$1,265M | 11.0% (calculated) | 287 | US$1,080 | US$1,318 (calculated) | 2036 |
| LaRonde (reported) | Quebec, Canada; underground | US$1,180M | 10.3% (calculated) | 240 | US$987 | US$1,241 (calculated) | 2034 (LZ5 2036) |
| Macassa (reported) | Ontario, Canada; underground | US$961M | 8.4% (calculated) | 216 | US$1,152 | US$1,369 (calculated) | 2032 |
| Kittila (reported) | Finland; underground | US$785M | 6.8% (calculated) | 170 | US$1,195 | US$1,497 (calculated) | 2037 |
| Fosterville (reported) | Victoria, Australia; underground | US$555M | 4.8% (calculated) | 124 | US$1,141 | US$1,727 (calculated) | 2037 |
| Goldex (reported) | Quebec, Canada; underground | US$450M | 3.9% (calculated) | 89 | US$965 | US$1,290 (calculated) | 2032 |
| Pinos Altos (reported) | Chihuahua, Mexico; underground | US$331M | 2.9% (calculated) | 59 | US$2,080 | US$2,737 (calculated) | 2028 |
| Total, nine months of 2026 (reported) | Corporate and other sales of US$6M not shown | US$11,486M | 100% | 2,495 | US$1,092 | US$1,529, company AISC |
Three terms I use
Payable production is the gold in what the mine produced that the company will be paid for. Total cash cost per ounce is the day-to-day cost of mining, milling and selling it, after taking off the small by-product credit from silver, zinc and copper. All-in sustaining cost, or AISC, adds what it takes to keep the mines at their present rate: sustaining capital, head-office costs, lease payments and the accrual for closing mines later. It leaves out growth projects, interest and income tax.3 In 2026 the company changed how it counts one payment, the net-profits payment to Nunavut Tunngavik at Meadowbank (US$185M to US$195M this year): it is now left out of cash cost and AISC. On the new basis 2025 was US$1,313 and not US$1,339, and the figures for 2026 are on the new basis.73 Co-product AISC does not deduct by-product credits. Agnico’s was US$1,613 for the nine months against US$1,529 by-product, a gap of just US$84 an ounce, because it mines almost only gold.3
What the company says it will do
The 2026 guidance is 3.3 to 3.5 million ounces, total cash cost of US$1,020 to US$1,120 and AISC of US$1,400 to US$1,550 an ounce, on a gold price of US$4,500, a Canadian dollar at 1.36 to the US dollar and diesel at US$0.78 a litre. Capital spending is US$2.6B to US$2.8B, plus US$290M to US$330M of capitalized exploration.5 Since July the company says production will be near the bottom of the range and costs near the top.5 The three-year outlook given in February was 3.3 to 3.5 million ounces a year for 2026, 2027 and 2028 and AISC rising with inflation of 3% to 5%.4 The pipeline is where the company expects growth. Five projects, the Canadian Malartic expansion, a Detour Lake underground mine, Upper Beaver, Hope Bay and San Nicolás, could together add 1.3 to 1.5 million ounces a year from 2030, which after depletion elsewhere is a net gain of 0.7 to 1.0 million ounces, or 20% to 30% more gold in a decade; the company says Canadian Malartic and Detour Lake could each reach about one million ounces a year.4 Those are internal studies that include inferred resources.
Events of 2025 and 2026
In January 2025 Agnico bought the shares of O3 Mining, which owns the Marban deposit next to Canadian Malartic, for C$1.67 a share in cash; Marban declared its first reserves, 1.58 million ounces, at the end of 2025.76 During 2025 it repaid US$950M of debt and sold its Orla Mining shares for US$405M; its cash flow statement shows US$683M spent on repurchasing shares, US$600M of it under the buyback programme.724 In 2026 it did four large things. It approved Hope Bay in Nunavut in May: US$2.4B of initial capital for 400,000 to 435,000 ounces a year over 11 years, at an expected cash cost of US$958 and AISC of US$1,214 on a US$4,500 gold price, and an after-tax return of 26% on that price; Hope Bay was about 13% built by September.145 It bought the rest of the Central Lapland belt in Finland in April and June: Rupert Resources, whose Ikkari project has 3.5 million ounces of probable reserves, Aurion Resources, and B2Gold’s 70% of the FinGold venture for US$325M in cash. The deal was paid for with US$578M of cash and 8.2 million Agnico shares worth US$1.43B when issued.153 On 1 July part of the north wall of the Barnat pit at Canadian Malartic moved; mining stopped until 27 September and the company expects 60,000 to 80,000 fewer ounces in the second half of 2026 and up to 150,000 fewer in each of 2027 and 2028.316 And in April Fitch upgraded the credit rating to A- with a stable outlook; in October the credit line was raised from US$2B to US$3B and extended to 2031.3
The moat
Gold is gold. Two mines pour the same bar and sell it for the same price, so Agnico’s protection is thin. What follows is what I can show.
Where the ounces are
This is the main thing the market pays for. 85% of nine-month sales came from mines in Canada, 7% from Finland, 5% from Australia and 3% from Mexico (calculated).3 Those are places where mining law is old, courts work and a mine can be financed. The company expects effective tax rates of 35% to 40% in Canada and Mexico, 30% in Australia and 20% in Finland in 2026: it pays a lot, under written rules.4 Three mines are in Quebec, two in Ontario, two in Nunavut, with Hope Bay joining them, and one each in Australia, Finland and Mexico. The Canadian Malartic mill is expected to have about 40,000 tonnes a day of spare capacity once the open pit ends in 2029, which the company wants to fill from nearby deposits.4
Reserves, and the price they are counted at
At 31 December 2025 Agnico had 55.4 million ounces of gold in proven and probable reserves, a record, in 1,330 million tonnes at 1.30 grams a tonne, up from 54.3 million a year earlier. It mined 3.0 million ounces and replaced them, plus the first Marban reserves.6 There were also 47.1 million ounces of measured and indicated resources, up 9.6%, and 41.8 million ounces of inferred resources, up 15.5%.6 Reserves are mostly counted at a gold price of US$1,600 an ounce, and resources at US$2,000; the company says a gold price 10% higher would lift reserves 9.0%, and 10% lower would cut them 8.7%.6 Gold sold at an average of US$4,537 in the first nine months of 2026, and has not closed below US$3,600 in any session this year until 20 November, so the ore the company can mine at a profit is larger than the table shows. That cuts in its favour. It cuts the other way too: counting at US$1,600 shows how much of the book is deep, thin ore. Detour Lake alone is 18.6 million ounces at 0.72 grams a tonne, a third of all reserves.6
Gold reserves
Proven and probable reserves at 31 December 2025, 100% owned except San Nicolás (50%), in the company’s reserve price of US$1,600 an ounce for most mines.
| Operation | Million ounces | Grade, g/t | Status |
|---|---|---|---|
| Detour Lake (reported) | 18.6 | 0.72 | Operating |
| Canadian Malartic complex (reported) | 9.1 | 1.66 | Operating; East Gouldie 5.7; Marban 1.6 is a project |
| Meliadine (reported) | 3.6 | 5.10 | Operating |
| Hope Bay (reported) | 3.4 | 6.53 | Approved May 2026; under construction |
| Kittila (reported) | 3.3 | 4.17 | Operating |
| Hammond Reef (reported) | 3.3 | 0.84 | Project, not approved |
| LaRonde complex (reported) | 2.8 | 3.72 | Operating; LZ5 0.9 |
| Upper Beaver (reported) | 2.8 | 3.71 | Shaft under construction |
| Macassa (reported) | 2.2 | 7.77 | Operating |
| Fosterville (reported) | 1.7 | 4.99 | Operating |
| Meadowbank (reported) | 1.5 | 2.55 | Operating to 2030 |
| Wasamac (reported) | 1.4 | 2.90 | Project, not approved |
| Goldex and Akasaba West (reported) | 0.9 | 1.60 | Operating |
| San Nicolás (50%) and Pinos Altos (reported) | 0.9 | Project; Pinos Altos operating to 2028 | |
| Total (reported) | 55.4 | 1.30 | Ikkari adds 3.5 in 2026, not in the table |
Look at the table’s weak parts. A quarter of the reserves, 13.1 million ounces, are in six projects that are not mines yet: Hope Bay is approved and being built, Marban is to feed the Canadian Malartic mill, Upper Beaver has begun shaft sinking, and Hammond Reef, Wasamac and San Nicolás have no decision.6 The mines that produce today have lives that end in 2028 (Pinos Altos), 2030 (Meadowbank), 2032 (Goldex and Macassa), 2034 to 2037 for LaRonde, Meliadine, Kittila and Fosterville, 2042 for Canadian Malartic and 2052 for Detour Lake.7 I model these lives and show below how much they matter.
Clean gold, no hedges and cash
A pure gold miner is easier to understand than a copper and gold one: the by-product credit was US$84 an ounce for the nine months.3 Agnico does not sell gold forward, so a fall in the price shows up at once. It does hedge costs: at 30 September it held currency contracts on US$10.0B of 2026 to 2028 spending, with a net fair value of about minus US$94M, and no diesel contracts.3 It had US$3.61B of cash, US$0.20B of debt and net cash of US$3.42B, against net debt of US$0.22B at the end of 2024; Fitch rates it A-.37 That cash lets it keep building through a falling gold price, and it is also what makes it risky: the same cash pays for Hope Bay, the buybacks and the Finland deal.
Where the protection stops
It stops at the price of gold and at costs. Nothing in this section protects Agnico from a fall in gold or a rise in cost. AISC went from US$824 in 2016 to US$1,339 in 2025, and in the first nine months of 2026 it was US$1,529 on a basis that is slightly more favourable.1273 Total cash cost rose from US$924 to US$1,092 a year earlier, up 18%, because of higher labour costs, royalties that rise with the gold price, higher diesel and lower production, in the company’s words.5 The company expects input costs to rise again: consumables, which are 30% of operating cost, were rising about 6%, drill bits 50% on tungsten export controls, and diesel for the Nunavut mines was bought 45% above budget.5 Canadian jurisdiction lowers the chance that a mine is taken. It does nothing for costs.
The competitive advantage
The last section asked whether Agnico can keep what it earns. This one asks whether it earns more than the next miner. I compared it with the two miners I have already valued here, Newmont, the largest gold miner, and Southern Copper, a large producer in Peru and Mexico, and I note that Barrick is the other large gold name and will have its own page. The figures for the other pages are from my pages at their dates, a few weeks earlier than this one, when gold was about 16% higher.
Agnico Eagle and its closest comparisons
The first column is Agnico Eagle’s own reported figures; the others are from my pages on those companies, at the dates shown.
| Agnico Eagle | Newmont | Southern Copper | |
|---|---|---|---|
| What it mines (reported) | Gold, 98% of sales, in Canada, Finland, Australia and Mexico | Gold, with copper and silver, in 12 countries | Copper, with molybdenum and silver, in Peru and Mexico |
| Output, 2026 (reported) | 3.3 to 3.5 million ounces, low end | 5.26 million attributable ounces, guide | Copper; Grupo Mexico owns 88.9% |
| All-in sustaining cost, nine months (reported) | US$1,529 by-product; US$1,613 co-product | US$1,365 by-product; US$1,869 co-product | Not comparable: copper |
| Net cash (reported) | US$3.4B | US$3.2B before US$1.95B owed to Barrick | About zero at the end of 2026, my estimate |
| Hedging of gold (reported) | None; no forward sales | None | Not applicable |
| Price against my base value, on each page’s date (calculated) | 123% above, at the 20 November close | 42% above, at the 4 November close | 181% above, at its early-November close |
What the numbers say
On cost, Agnico is not clearly better than Newmont; it depends on how you count. Newmont’s by-product AISC was US$1,365 in the nine months and Agnico’s US$1,529, so Newmont looks US$164 cheaper. But Newmont’s number takes off US$504 an ounce of copper, silver, lead and zinc credits, and Agnico’s takes off US$84. Without the credits, Agnico’s US$1,613 is US$256 below Newmont’s US$1,869. I think the co-product line is the fairer comparison, and on it Agnico is cheaper by about 14%, though the two companies define their measures a little differently.3
On quality of ounces, Agnico’s are in four countries and mostly in one. Newmont’s are spread more widely, with larger parts in Ghana, Papua New Guinea, Peru and Mexico, where I wrote that the rules change. Agnico’s Canadian mines face tax, Indigenous agreements, permitting and weather, which are real but handled by courts and written law. I think that is a large part of why the market pays more for these ounces, though I cannot prove the cause; they are not cheaper to dig. Southern Copper is the counterexample: its mines are in Peru and Mexico, which many would call riskier, and on my page its price was 181% above my base value, more than Agnico’s. So jurisdiction cannot be the whole premium. Grupo Mexico holds 88.9% of Southern Copper, so a smaller part of it is for sale, and I cannot say how much of any premium that explains.
Capital intensity
Gold mining eats capital. In 2025 Agnico spent US$2.39B including capitalized exploration for 3.45 million ounces, about US$690 an ounce, and its 2026 guide of US$2.9B to US$3.2B is about US$890 an ounce (calculated).4 In nine months of 2026 US$0.74B was sustaining and US$1.55B development.3 New capacity costs far more: Hope Bay’s US$2.4B for about 408,000 ounces a year is about US$5,900 for each annual ounce (calculated), and I use US$6,000 for the pipeline.14 That is why free cash flow in my base dips in 2029 before it rises.
On what the price pays for, take the same gold price. On 4 November gold futures settled at US$4,073, the gold price I used for Newmont. On the same deck my Agnico base value is $93. Agnico’s close that day was US$183.45, so on a like-for-like basis it was 97% above my base, against 42% for Newmont. Both have fallen since, and I have not re-priced Newmont. In my terms the market asked about 1.4 times as much per dollar of base value for Agnico as for Newmont.
What the price pays for, per ounce
At $151.30 the market value is US$76.6B on 506.0 million shares. Debt and leases of US$0.3B less US$3.6B of cash give an enterprise value of about US$73.3B (calculated).3 That is US$1,323 for each ounce of reserves (55.4 million), US$1,244 counting Ikkari, and US$22,200 for each ounce of yearly production, or 38% of the gold price for each ounce still in the ground (calculated). On 4 November my Newmont page had a market value of US$122.8B, about US$1,010 an ounce of reserves, or 25% of that day’s gold price. The Central Lapland deal cost about US$2.0B in cash and shares for Ikkari’s 3.5 million reserve ounces and a large land package, about US$575 an ounce if all of it is assigned to Ikkari, or 44% of what the market pays for the ounces Agnico already has (calculated).153
The next best use of the same dollar
The ten-year Treasury pays 4.92% with no risk to the money.11 My base cash flows return about 0% a year on $151.30, my bull case 10.8% and my bear case loses money, all measured against the 8.5% I require (estimate). The closest alternative on this site is Franco-Nevada, which gets paid on the same gold without digging it and carries no debt. All the gold pages on this site share one idea, the gold price: if gold falls, Agnico, Newmont, Franco-Nevada and Barrick fall together, so owning several is not diversification. A higher gold price is the same bet on all of them. The difference is cost: a miner’s costs rise with gold and a royalty’s do not.
Management
Ammar Al-Joundi, 61, has been president and chief executive since 23 February 2022, a director since 2022, and was president from 2015. He worked at Barrick before returning to Agnico: he was chief financial officer of Barrick from 2012 to 2015.13 Sean Boyd, 67, who joined in 1985 and was chief executive from 1998 to 2022, then executive chair, is now chair of the board.13 Jamie Porter has been the chief financial officer since May 2023, Natasha Vaz and Dominique Girard run operations, and Jean Robitaille is chief strategy and technology officer.13 The board has 11 directors, of whom Mr. Al-Joundi and Mr. Boyd are not independent; the lead director is Jamie Sokalsky.13
How they are paid, and what that pays them to do
Mr. Al-Joundi’s pay for 2025 was US$17.64M, up 72% from US$10.28M a year earlier. Of that, a salary of US$1.00M, an annual bonus of US$2.20M, a pension value of US$0.48M and US$13.89M, or 79%, in restricted and performance share units.13 The company says that 98.4% of the increase comes from the rise in the share price, which went up 113% in total return in 2025, since the grants are a fixed number of units and not a fixed dollar value.13 Pay rises when the shares do and falls when they do; the shares are 40% below their March high.
The annual bonus has 14 measures: 25% on safety, environment and people; 25% on production (10%), total cash cost (7.5%) and AISC (7.5%); 25% on financial measures, including operating cash flow per share, return on invested capital, dividends per share and total return against peers (10%); and 25% on the pipeline, including projects on time and on budget (10%) and reserves and resources per share (5% each). The 2025 score was 81.5%.13 The performance share units, 60% of the equity awards, pay between zero and 200% on relative total shareholder return (37.5%), the company’s multiple of price to net asset value against peers (37.5%), production (12.5%) and AISC (12.5%); the 2023 grants vested at 103% of target.13
What does that pay them to do? Hit production and cost targets, replace reserves, and keep the share price above the other gold miners. Reserves per share and resources per share count the share base, which is a good habit. There is no weight on free cash flow per share or on returns above a cost of capital apart from a 5% weight on return on invested capital. And 37.5% of the units pay on how high the market values the company’s assets compared with peers. That is a reward for the premium itself, not only for what produces it. That does not make the company’s actions wrong, but management is not an outside judge of the price.
How much of their own money is in
On 6 March 2026 Mr. Al-Joundi held 48,030 shares, 64,000 restricted units and 96,000 performance units; the company counts his shares and restricted units, valued at US$24.05M, against a requirement of 125,000 shares or units.13 Mr. Boyd held 53,543 shares and 10,000 units, worth US$13.6M.13 Every director meets the company’s guideline, with holdings worth 4.9 to 17.8 times a year of director pay.13 These are real sums for the people, and small against a company worth US$77B; the pattern is that of a professional manager more than an owner-operator.
What they did with capital over a full cycle
In the ten years to 2025 Agnico generated US$8.6B of free cash flow, paid US$3.4B in dividends and bought back US$1.2B of stock (calculated).17 Weighted diluted shares went from 226M to 503M, up 123%, nearly all in 2022 when the company merged with Kirkland Lake.17 Output per thousand shares went from 7.4 ounces in 2016 to 6.9 ounces in 2025, down 7%, while reserves per thousand shares went from 88 to 111 ounces, up 25% (calculated).17127 Free cash flow per share rose from US$1.16 to US$8.74, or 7.5 times, while gold rose 2.8 times (calculated). Reserve growth per share is the better result, and the one the bonus pays for.
Where the cash went
US$ millions, calendar years
- Free cash flow US$8.6B in ten years
- Dividends paid US$3.4B
- Buybacks US$1.2B
The capital allocation record
What the company did with the money, and my reading.
| Decision | What happened | My reading |
|---|---|---|
| Merger with Kirkland Lake, 2022 | All shares: 209.3M new shares; weighted diluted shares 245M in 2021 and 439M in 20222017 | Output rose 50% in 2022 and weighted shares 79%, so gold per thousand shares fell from 8.5 oz to 7.1 (calculated).212017 |
| Canadian Malartic, 2023 | Bought the 50% it did not own, with other Canadian assets, in a joint deal with Pan American for Yamana19 | The best deal here: full control of a mine in a camp where it already worked, and the source of Odyssey and East Gouldie |
| Dividend | US$0.36 a share in 2016, US$1.60 from 2022 to 2025, US$1.80 a year rate in 2026173 | About 17% of 2025 free cash flow (US$728M of US$4,399M) (calculated); not cut in ten years |
| Debt repayment, 2025 | Repaid US$950M of notes; net debt of US$217M became net cash of US$2.67B in a year7 | Good: no debt to refinance if gold falls |
| Buybacks, 2025 and 2026 | US$683M of cash in 2025; US$818M in nine months of 2026, 4.26 million shares at US$187.94 on average; up to US$2.0B authorized to May 202723 | Good only below value. At US$188 the shares cost 2.8 times my base value, so each dollar bought about 36 cents of it (calculated). Shares still rose from 500.8M to 506.0M in 2026 |
| Central Lapland, Finland, 2026 | US$578M of cash and 8.2M shares (US$1.43B); US$2.0B in all, plus a contingent right of up to C$3.00 per Rupert share153 | About US$575 an ounce of reserves, against the market’s US$1,300 for Agnico’s own; I credit it at cost and give it no production |
| Hope Bay, May 2026 | US$2.4B for about 408,000 ounces a year; 26% after-tax return at US$4,500 gold; 13% built145 | Approved in May on a US$4,500 gold price. At my base price the return is lower; I include it in full because the money is committed |
On the whole the record is good and has got better. The Kirkland Lake merger made the company twice as big and gave it Detour Lake, Macassa and Fosterville; gold per share fell a little, and the share price rose. The Canadian Malartic purchase and the debt repayment look right. The tests that remain are two. One is the buyback: if my base value of $68 is right, the shares bought at an average of US$188 in 2026 cost nearly three times what they were worth, and the company did that while doing a US$2.0B acquisition and starting a US$2.4B mine. If gold stays above US$5,000 the buyer was right. The company is making a bet on gold with its own shareholders’ cash, and the bet is not small. The other is Hope Bay and the pipeline: the studies were done at US$4,500 gold, and gold is now 22% lower.
Financials
The income statement is easy to read and the cash flow statement tells more. Four things need explaining first.
- Revenue follows the gold price and the ounces: the price went from US$1,249 to US$3,454 and output from 1.66 to 3.45 million ounces, so revenue rose 5.6 times.1272
- Net income is clean most years. The only loss was US$327M in 2018; 2023 included a US$667M after-tax impairment at Macassa and Pinos Altos; 2025 included a US$229M reversal of an earlier write-down.17192
- The cost series changes definition in 2026, when the company changed how it counts the Nunavut payment; the cost row is as reported each year.
- Taxes arrive late. Income and mining taxes were US$2.24B in 2025, but only US$1.18B was paid that year; about US$1.3B of the 2025 liability was paid in the first quarter of 2026, so 2026 free cash flow carries two years of tax.24
Ten years and the last twelve months
Calendar years, US$ millions unless marked; international accounting rules as reported in each year’s annual report.
| 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | TTM | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Revenue (reported) | US$2,138M | US$2,243M | US$2,191M | US$2,495M | US$3,138M | US$3,870M | US$5,741M | US$6,627M | US$8,286M | US$11,908M | US$15,050M |
| Net income (reported) | US$159M | US$241M | −US$327M | US$473M | US$512M | US$562M | US$670M | US$1,941M | US$1,896M | US$4,461M | US$6,172M |
| Diluted EPS (reported) | US$0.70 | US$1.04 | −US$1.40 | US$1.99 | US$2.10 | US$2.30 | US$1.53 | US$3.95 | US$3.78 | US$8.86 | US$12.27 |
| Operating cash flow (reported) | US$779M | US$768M | US$606M | US$882M | US$1,192M | US$1,345M | US$2,097M | US$2,602M | US$3,961M | US$6,817M | US$7,357M |
| Additions to property, plant and mine development (reported) | US$516M | US$874M | US$1,089M | US$883M | US$759M | US$897M | US$1,538M | US$1,654M | US$1,818M | US$2,418M | US$3,127M |
| Free cash flow (calculated) | US$263M | −US$107M | −US$483M | −US$1M | US$433M | US$448M | US$558M | US$947M | US$2,143M | US$4,399M | US$4,229M |
| Dividends paid in cash (reported) | US$71M | US$76M | US$84M | US$105M | US$190M | US$275M | US$608M | US$639M | US$672M | US$728M | – |
| Share repurchases (reported) | US$16M | US$25M | US$30M | US$25M | US$40M | US$35M | US$110M | US$47M | US$169M | US$683M | – |
| Dividends paid per share (reported) | US$0.36 | US$0.41 | US$0.44 | US$0.55 | US$0.95 | US$1.40 | US$1.60 | US$1.60 | US$1.60 | US$1.60 | US$1.35 declared, nine months |
| Diluted shares, millions (reported) | 226 | 232 | 233 | 238 | 243 | 245 | 439 | 490 | 501 | 503 | 504, nine months |
| Realized gold price, US$ an ounce (reported) | 1,249 | 1,261 | 1,266 | 1,406 | 1,788 | 1,794 | 1,797 | 1,946 | 2,384 | 3,454 | 4,537, nine months |
| Payable gold produced, thousand ounces (reported) | 1,663 | 1,714 | 1,627 | 1,782 | 1,737 | 2,086 | 3,135 | 3,440 | 3,485 | 3,447 | 2,495, nine months |
| All-in sustaining cost, US$ an ounce (reported) | 824 | 804 | 877 | 938 | 1,051 | 1,059 | 1,109 | 1,179 | 1,239 | 1,339 | 1,529, nine months |
| Margin per ounce (calculated) | 425 | 457 | 389 | 468 | 737 | 735 | 688 | 767 | 1,145 | 2,115 | 3,008, nine months |
| Gold reserves, million ounces (reported) | 19.9 | 20.6 | 22.0 | 21.6 | 24.1 | 25.7 | 48.7 | 53.8 | 54.3 | 55.4 | 55.4 at 31 Dec 2025 |
| Cash at year end (reported) | US$540M | US$633M | US$302M | US$322M | US$403M | US$186M | US$659M | US$339M | US$926M | US$2,866M | US$3,613M |
| Debt at year end (reported) | US$1,203M | US$1,372M | US$1,721M | US$1,724M | US$1,565M | US$1,565M | US$1,342M | US$1,843M | US$1,143M | US$196M | US$197M |
Revenue and free cash flow
Calendar years, US$ millions; TTM is the twelve months to 30 September 2026
- Revenue US$15.0B, TTM
- Free cash flow US$4.2B, TTM
What an ounce sold for, and what it cost
US$ an ounce of gold, calendar years
- Realized price US$3,454 in 2025
- All-in sustaining cost US$1,339
- Margin US$2,115
Gold produced, reported and in my base
Thousand ounces of gold, payable; the dark bars are my base case, not guidance
- Reported 3.45M oz in 2025
- Guide or my base 3.28M oz in 2027
The third quarter
The company produced 814,012 ounces and sold 825,084 at US$4,264, a price 23% above the third quarter of 2025. Sales were US$3.58B, net income US$1.35B or US$2.67 a share, adjusted net income US$1.32B, and adjusted EBITDA US$2.47B.35 Operating cash flow was US$1.76B after a swing in working capital: inventories used US$236M and other current assets US$173M, while payables added US$193M.3 Capital spending was US$921M, of which US$296M was sustaining and US$625M development, including US$183M at Hope Bay; free cash flow was US$852M.3 AISC was US$1,648, 24% above the US$1,331 of a year earlier on the new basis.5 The company paid US$205M in dividends and bought 1.30 million shares for US$250M at an average US$192.60, returning US$478M in all, and said it expects to return more than half of free cash flow at present gold prices.35 Canadian Malartic made 111,202 ounces against 156,875 a year earlier after the Barnat pit stopped; Detour Lake, Fosterville and Kittila did better.5
What an owner can really take out
Reported earnings and what an owner can take out differ. Net income in the twelve months was US$6.17B. Operating cash flow was US$7.36B, and additions to property, plant and mine development US$3.13B, leaving free cash flow of US$4.23B (calculated).23 That is after US$3.2B of income and mining tax paid, which includes about US$1.3B for the 2025 tax year paid in the first quarter, so on a clean year the figure would be about US$5.5B (estimate).43 Stock pay (US$78M in nine months) is in profit and I do not add it back.3 Development capital, which includes Hope Bay, Odyssey and Detour Lake underground, was US$1.55B of the US$2.30B spent in nine months; before it, owner cash would be about US$5.9B (estimate).3 I use the stricter figure, after development capital, though part of that spending is for growth.
The twelve months were sold at an average price near US$4,500 (calculated), and gold futures settled at US$3,515 on 20 November, 22% lower. At that price and my other base assumptions, 2027 free cash flow is US$1.6B (estimate), 61% under the twelve months. The gap is about gold (about US$1,000 an ounce on 3.3 million ounces is US$3.3B before tax, or about US$2.2B after it), costs 4% higher, 120,000 fewer ounces at Canadian Malartic, and US$0.4B more capital. At $151.30, the market value of US$77B is 18 times the trailing free cash flow and 47 times my 2027 figure (calculated).
Free cash flow per share against the gold price
Index, 2016 = 100, calendar years
- Cash per share 751 in 2025
- Gold 277
- Shares 223
Balance sheet
At 30 September Agnico had US$3.61B of cash, US$0.20B of senior notes (US$0.197B on the balance sheet) and US$0.13B of leases, and US$1.40B of reclamation provisions, of which US$0.23B is current.3 Net cash on the company’s measure was US$3.42B. Total assets were US$39.1B, of which property, plant and mine development US$26.2B and goodwill US$4.2B, an accounting asset from past mergers that is a risk to book value if gold stays low.3 The company declared a quarterly dividend of US$0.45, which is US$1.80 a year and a yield of 1.2% at $151.30.5 The US$1.38B of investments are shares and warrants in other miners, down from US$1.51B at the end of 2025.3
What the balance sheet leaves out are two things. One is the cost of closing the mines: US$1.40B at present value, which I count as a debt. The other is a contingent value right of up to C$3.00 for each Rupert share, issued to the sellers when the company bought Rupert. The 205 million shares or so that were exchanged would receive up to about C$0.6B if the milestones are met, and the company will book the payments as part of the cost of the properties when they arise; I do not count it (calculated).3
How the shares have traded
The share price and gold over ten years
Last close of each calendar quarter, index 100 = first quarter shown (late 2016), log scale
- Agnico Eagle 360
- Gold futures 306
The shares closed at US$43.19 on 21 November 2016 and at $151.30 on 20 November 2026, which is 3.5 times, plus dividends (calculated).1 Gold futures rose 2.9 times over the same period (calculated).8 The stock peaked at US$252.19 on 2 March 2026, and is 40% below it; gold peaked on 29 January at US$5,318 and is 34% below.18 The shares fell 25% from US$200.80 on 9 November to US$151.30 on 20 November, as gold futures fell 15%, from US$4,115 to US$3,515. I found no company filing in those days; the last was on 2 November. Gold’s own slide is the obvious cause: Kitco had it down 8.7% on the week to 20 November, with a weekly low of US$3,503, and nine of 15 analysts in its weekly survey expected lower prices again.10 So the stock has fallen about one and two-thirds times as much as gold, which is what you would expect of a business with fixed costs.18
Valuation
First, how this goes badly wrong
Before the numbers, I asked what would most likely ruin this investment, and worked back. Three things stand out.
- Gold falls and stays down, while costs do not. Futures reached US$5,318 on 29 January and fell 34% to US$3,515 on 20 November.8 A mine’s cost does not fall with it: AISC was up 21% in nine months, from US$1,262 to US$1,529, and the company says consumables, diesel and labour are still rising.5 At my base price, free cash flow in 2027 is about US$1.6B against US$4.2B in the last twelve months, with about US$3.5B of capital spending.
- The company builds and buys at the top. It approved Hope Bay (US$2.4B) in May on a US$4,500 gold price, paid US$2.0B in cash and shares for Central Lapland, and paid an average US$188 a share for its own stock, all while gold was above US$4,000.14153 If gold stays near US$3,500 the returns on those decisions are lower than the ones shown, and the cash is already out.
- A mine or a camp goes wrong. The Barnat pit wall moved on 1 July and cost Canadian Malartic 29% of its third-quarter ounces against a year earlier; the company says it will cost up to 150,000 ounces in each of 2027 and 2028.3 Detour Lake is 23% of sales and a third of the reserves, and 85% of sales come from Canada, where a change in tax, a labour dispute or a Nunavut shipping problem hits several mines at once.36 I give the geopolitics a table in Section VIII.
None of these needs anything strange to happen. They set my bear case, and they explain why I start from the cash an owner can take out and not from a multiple of earnings.
How I built it
I model Agnico mine by mine, because the company says what each mine will make and when each will end. For each of the ten mines I take the 2026 to 2028 production guidance and the disclosed mine life.47 From 2029 each mine holds its 2028 level until its life ends. Canadian Malartic is cut by 120,000 ounces in 2027 and 2028 for the Barnat pit, and from 2029 I use 575,000 ounces, the middle of the 550,000 to 600,000 the company expects from underground mining alone.34 Hope Bay starts in 2030 at 250,000 ounces and then makes 408,000 for 11 years, the study’s average.14
Agnico does not publish an all-in sustaining cost by mine. I start with each mine’s 2026 total cash cost guidance, move it with gold at US$3 an ounce for each US$100 (the company’s sensitivity, built on US$4,500 gold), and add inflation of 4% in 2027, 3.5% in 2028 and 3% after, near the company’s 3% to 5%.4 Detour Lake’s cost rises in 2027 and 2028 because its grade falls from 0.97 grams a tonne in 2026 to 0.77 and then 0.69, as the company’s plan says.4 Sustaining capital is close to each mine’s own nine-month 2026 spending per ounce.3 I add the Nunavut net-profits payment, exploration and corporate development of US$290M, general and administrative costs of US$245M and other costs of US$50M to US$60M, each inflated, and tax at 34% of profit after depreciation of about US$1.7B, since the company guides a 34% to 36% rate.54 A year in which a mine cannot cover its capital is a year I turn it off.
Development capital is Hope Bay’s construction (US$0.8B in 2027, US$0.65B in 2028 and US$0.45B in 2029, after about US$0.45B in 2026) plus US$1.35B in 2027 falling to US$0.5B from 2031, in 2026 dollars, for Odyssey, Detour Lake underground, Upper Beaver, Macassa and tailings. That is below the roughly US$2.1B the company is on pace to spend on development this year.3 I count 30 years, 2027 to 2056, each year’s cash at year end, from 1 January 2027, with no value after 2056, which is conservative for the mines I extend. To get from the business to a share I add cash at 1 January 2027 (US$3.61B at 30 September, plus about US$0.75B of fourth-quarter free cash flow, less the US$0.23B dividend payable on 15 December), take off notes of US$0.20B, leases of US$0.13B, closure provisions of US$1.40B and the currency contracts’ US$0.09B, and add the US$1.38B of shares in other miners and Central Lapland at the US$2.0B paid. I divide by 507.2M shares, the Q3 diluted count.35 I do not count the contingent value right to Rupert holders, up to about C$0.6B, which the company has not booked.3
The discount rate. I use 8.5%: the ten-year Treasury at 4.92% plus 3.6 points.11 That is 0.5 points below the 9.0% on my Newmont page and level with the 8.5% on Franco-Nevada. A miner has operating risk that a royalty does not, but Agnico has net cash, an A- rating and mines in four countries I would call low risk, so I do not charge a country premium. It is a judgement, and the grid below shows what each point is worth.
The gold-price deck is in the cases table below. For reference, the 20 November settle was US$3,515 and spot about US$3,525; the realized price was US$3,454 in 2025, US$2,384 in 2024 and US$4,264 in the third quarter of 2026; the record close was US$5,318 on 29 January; the company’s reserve price is US$1,600 and its 2026 guidance price US$4,500.8937
The mines, one at a time
What I assume for each mine, and the present value of what it earns before tax, development capital and head office, at 8.5%.
| Mine | Gold, 2027, thousand oz | Gold, 2030 | My total cash cost, 2027, US$ an ounce | Disclosed life to | Present value of margin, before tax | Per share |
|---|---|---|---|---|---|---|
| Detour Lake (estimate) | 625 | 600 | $1,134 | 2052 | US$12.4B | $24.4 |
| Canadian Malartic (estimate) | 535 | 575 | $1,280 | 2042 | US$10.7B | $21.1 |
| Meadowbank (estimate) | 440 | 100 | $1,165 | 2030 | US$1.8B | $3.6 |
| Meliadine (estimate) | 420 | 430 | $1,092 | 2036 | US$6.2B | $12.3 |
| LaRonde (estimate) | 345 | 350 | $925 | 2034 (LZ5 2036) | US$4.9B | $9.6 |
| Macassa (estimate) | 325 | 330 | $1,165 | 2032 | US$3.1B | $6.2 |
| Kittila (estimate) | 225 | 250 | $1,269 | 2037 | US$3.4B | $6.7 |
| Fosterville (estimate) | 150 | 180 | $1,269 | 2037 | US$2.0B | $4.0 |
| Goldex (estimate) | 140 | 145 | $1,065 | 2032 | US$1.4B | $2.7 |
| Pinos Altos (estimate) | 75 | 0 | $2,145 | 2028 | US$0.2B | $0.3 |
| Hope Bay (estimate) | 0 | 250 | $1,068 | 2040 | US$5.4B | $10.6 |
| Detour Lake underground, Upper Beaver, Malartic to 1 Moz, at half credit (estimate) | 0 | 0 | – | US$8.5B | $16.7 | |
| Mines carried past their life, half credit (estimate) | 0 | 0 | – | US$10.2B | $20.1 | |
| Total, before tax, development capital and head office (calculated) | US$70.1B | $138.2 |
The parts, added up
Each case is the sum of these lines; the base is shown.
| Present value, US$B | Per share | |
|---|---|---|
| Margin of all mines, after sustaining capital, before tax (estimate) | 70.09 | $138.2 |
| Less Nunavut net-profits payment (estimate) | −0.21 | −$0.4 |
| Less exploration, head office and other costs (estimate) | −8.25 | −$16.3 |
| Less cash tax at 34% (estimate) | −15.95 | −$31.4 |
| Less development capital (estimate) | −17.14 | −$33.8 |
| Free cash flow, 2027 to 2056, discounted (estimate) | 28.54 | $56.3 |
| Cash at 1 January 2027, my estimate (estimate) | 4.14 | $8.2 |
| Notes and leases (reported) | −0.33 | −$0.7 |
| Closure provision at book (reported) | −1.40 | −$2.8 |
| Shares and warrants in other miners, at fair value (reported) | 1.38 | $2.7 |
| Currency contracts, net fair value (reported) | −0.09 | −$0.2 |
| Central Lapland, at the cash and shares paid (reported) | 2.01 | $4.0 |
| Total (calculated) | 34.24 | $68 |
What the price implies
At $151.30 the market value is US$76.6B, which is 18 times the last twelve months of free cash flow and 47 times my 2027 figure (calculated).13 On my numbers it is a business that pays 5.5% of its price in free cash flow on the best twelve months it has had, and 2% on my base for 2027. The Treasury pays 4.92%.
Reverse valuation
Hold everything at my base and solve for today’s price in one place.
| Market value (calculated) | US$76.6B: $151.30 on 506.0M shares |
|---|---|
| My base value, whole company (calculated) | US$34.2B, $68 a share |
| What the price pays above that (calculated) | US$42.5B, $83 a share |
| Market value to the last twelve months of free cash flow (calculated) | 18 times |
| Market value to my 2027 free cash flow (calculated) | 47 times |
| My base cash flows to 2056, undiscounted, plus net assets, per share (calculated) | US$149, less than the price |
| Gold price needed in 2027, rising 2% a year, everything else base, at 8.5% (calculated) | About US$5,350, 52% above the settle and above the US$5,318 record |
| Same, with full life extension, full growth and costs one point slower (calculated) | About US$4,300, 23% above the settle |
| Same, in the base, at a 6% discount rate (calculated) | About US$4,700 |
| Discount rate needed with gold at the settle, everything friendly (calculated) | 5.1%, against 4.92% on the 10-year Treasury |
| Discount rate needed with gold at the settle, base (calculated) | None: over the 30 years I model, even at 0% the base cash flows are less than the price |
This is the most useful table on the page. To reach $151.30 on my base cash flows gold has to be near US$5,350 in 2027, 52% above the settle, and keep rising 2% a year. That is above the record close of US$5,318 in January. If everything on the friendly side happens, the figure is US$4,300. Or owners have to accept a return near 5.1%, which is hardly more than a Treasury, with gold where it is and every project built. The most striking line is the sixth: the base cash flows, added up with no discounting for 30 years, plus the net assets, come to US$149 a share, less than the price. My base does not support the price, and the next table shows what would.
From my base to the price
Each step keeps the ones before it. Value per share, in US dollars.
| Step | What I change | Value per share | Added |
|---|---|---|---|
| My base (estimate) | Gold US$3,515 in 2027 and 2% a year after, half credit for life extension and growth, costs 4%, 3.5%, then 3%, 8.5% | $68 | – |
| Gold keeps its value against my costs (estimate) | Gold rises 3% a year instead of 2%, US$4,587 in 2036 instead of US$4,201 | $81 | +$13 |
| The mines and projects go well (estimate) | Every mine runs 15 years past its disclosed life at full output, and all three growth projects are built | $110 | +$29 |
| Costs rise more slowly (estimate) | Unit costs rise one point a year slower than my path | $125 | +$15 |
| A lower required return (estimate) | 7% instead of 8.5%, against a 4.92% ten-year Treasury | $150 | +$25 |
| The price (calculated) | Close in Q4 2026, NYSE, with gold at US$3,515 | $151.30 |
That is how the gap closes: gold that holds its value against costs, every mine and project going the company’s way, costs a point slower, and a 7% return, all at once, take $68 to about $150 with gold at today’s settle. None needs gold to start above today’s settle. Each step is a choice I can defend, and I chose the cautious side of all four, so my $68 is the low end of what these inputs allow and not the middle. The middle is somewhere between $68 and $150 and depends on which steps you accept; I show them and do not pick. The price needs all four together, and I give my odds for a friendly case like that in Section VII.
What I can’t judge
Four inputs decide this page, and I can’t know any of them: where gold will trade in 2032; how long the mines will really run, since reserves are counted at US$1,600 gold; what the next ounce will cost; and how much of the pipeline is real. So here are the grids. Read my $68 as one cell in them.
Value per share against the gold price
Value per share in US dollars; gold price in 2027 along the bottom, rising 2% a year after; band is 9.5% to 7.5%
- At 8.5% $90 at US$4,000
- 9.5% to 7.5% $83 to $97 at US$4,000
Value per share, by the two things I can’t know
Down the side, the flat gold price at its 2027 level, rising 2% a year after. Across the top, the discount rate. Everything else is base.
| Gold, 2027 level | 6% | 7% | 8.5% | 10% | 11% |
|---|---|---|---|---|---|
| US$2,500 (estimate) | $25 | $23 | $22 | $20 | $19 |
| US$3,000 (estimate) | $52 | $49 | $44 | $40 | $38 |
| US$3,515 (settle) (estimate) | $82 | $76 | $68 | $61 | $57 |
| US$4,073 (4 Nov settle) (estimate) | $114 | $105 | $93 | $83 | $78 |
| US$4,500 (estimate) | $138 | $127 | $112 | $101 | $94 |
| US$5,000 (estimate) | $167 | $153 | $135 | $121 | $113 |
| US$6,000 (estimate) | $224 | $205 | $181 | $161 | $150 |
Value per share, by gold and by cost
Down the side, gold as before. Across the top, how fast unit costs rise each year after 2028; 2027 and 2028 are 4% and 3.5% in my base and move by the same points.
| Gold, 2027 level | 2% a year after 2028 | 3% a year, my base | 4% a year | 5% a year |
|---|---|---|---|---|
| US$2,500 (estimate) | $31 | $22 | $14 | $10 |
| US$3,000 (estimate) | $53 | $44 | $34 | $26 |
| US$3,515 (settle) (estimate) | $77 | $68 | $57 | $47 |
| US$4,073 (4 Nov settle) (estimate) | $103 | $93 | $82 | $71 |
| US$5,000 (estimate) | $145 | $135 | $124 | $111 |
Value per share, by how long the mines run and by rate
Rate across the top; how many ounces I carry past each mine’s disclosed life down the side.
| 7% | 8.5%, my rate | 10% | |
|---|---|---|---|
| No mine runs past its disclosed life (estimate) | $69 | $63 | $57 |
| Half of the last year’s output for 10 years, my base (estimate) | $76 | $68 | $61 |
| All of it for 15 years (estimate) | $92 | $79 | $70 |
A US$1,000 move in gold in the middle of the grid is worth about US$46 a share. A 1.5-point change in rate is worth about US$6 to US$9. A 1-point change in the cost inflation rate is worth about US$10. Carrying all the mines for 15 years instead of half for 10 is worth about US$12. The first is a bet on a price, the second on what an owner will accept, the third on the world and the fourth on geology. They can move together: gold usually rises when the world is unsettled, and a miner’s costs rise with it.
The growth projects, as ranges
The company’s growth numbers rest on internal evaluations that it calls preliminary, with inferred resources in them. I do not put them in as points.
The pipeline
What the company says, and what I assume in each case.
| Project | What the company says | My base | My bull | What I could not check |
|---|---|---|---|---|
| Hope Bay, Nunavut (reported) | US$2.4B initial capital; 400,000 to 435,000 oz a year, 11-year life; 26% after-tax return at US$4,500 gold; 13% built at 30 September145 | Full: 250,000 oz in 2030, then 408,000 | Full | Return at my gold price |
| Canadian Malartic to one million ounces (reported) | 400,000 to 500,000 oz more a year from 2033: a second Odyssey shaft, Marban and other deposits4 | Half credit | Full | Capital not published; I use US$6,000 an annual ounce |
| Detour Lake underground (reported) | 300,000 to 350,000 oz more a year from 2030; US$300M allocated to the ramp; decision expected in mid-2027, as of the February outlook4 | Half credit | Full | Grade, cost, decision |
| Upper Beaver (reported) | 200,000 to 225,000 oz and 3,600 tonnes of copper a year from 2030; shaft at 732 metres45 | Half credit | Full | Capital not published; I use US$6,000 an annual ounce |
| Ikkari and Central Lapland (reported) | 3.5 million oz of probable reserves; about 500,000 oz a year Finnish hub within a decade with Kittila; synergies up to US$500M15 | At cost, US$2.0B | At cost | No capital or schedule yet |
| San Nicolás (reported) | Copper and zinc, 50% owned with Teck; approval decision late 2027 or early 20285 | No credit | No credit | No economics published |
Sensitivity
One change at a time
Value per share when one input moves and everything else stays at base.
| Change | What it assumes | Base value | Change |
|---|---|---|---|
| Gold at US$3,000 (estimate) | 2027 level US$3,000, then 2% a year | $44 | −$24 |
| Gold at the 4 November settle (estimate) | US$4,073 in 2027, then 2% a year | $93 | +$25 |
| Unit costs 5% higher (estimate) | Every year, on top of the inflation path | $63 | −$4 |
| Cost inflation 1 point lower (estimate) | 3%, 2.5%, then 2% | $77 | +$10 |
| Canadian dollar 5 cents stronger (estimate) | About US$30 an ounce on the Canadian mines, per the company | $65 | −$2 |
| Cash tax 38% (estimate) | Higher mining taxes | $64 | −$4 |
| No mine carried past its life (estimate) | Instead of half credit | $63 | −$5 |
| Every mine carried 15 years at full output (estimate) | Instead of half credit for 10 years | $79 | +$12 |
| No growth projects beyond Hope Bay (estimate) | Instead of half credit | $62 | −$6 |
| All three growth projects built (estimate) | Instead of half credit | $74 | +$6 |
| Closure bill of US$2.8B (estimate) | Twice the book provision | $65 | −$3 |
| No credit for Central Lapland (estimate) | Write the US$2.0B off | $64 | −$4 |
| Everything friendly at once (estimate) | All lives and projects at full credit, costs 1 point slower | $102 | +$34 |
Three cases
Three cases
Years 2027 to 2056. Free cash flow is after all capital spending and tax, and is set to zero in any year a mine could not cover its capital.
| Bear | Base | Bull | |
|---|---|---|---|
| Gold price, 2027, US$ an ounce (estimate) | $2,900 | $3,515 | $4,400 |
| Gold price, 2029 (estimate) | $2,500 | $3,657 | $5,000 |
| Gold price, 2036 (estimate) | $2,872 | $4,201 | $6,149 |
| Canadian Malartic ounces lost to the Barnat pit, 2027 and 2028 each (estimate) | 150,000 | 120,000 | 80,000 |
| Mines carried past their disclosed life (estimate) | None | Half of final output, 10 years | All of it, 15 years |
| Growth projects beyond Hope Bay (estimate) | None | Half credit | Full credit |
| Gold produced, thousand ounces, 2030 (estimate) | 3,210 | 3,310 | 3,410 |
| Gold produced, 2036 (estimate) | 2,288 | 3,093 | 3,898 |
| My all-in sustaining cost, 2030, US$ an ounce (estimate) | $1,644 | $1,678 | $1,721 |
| Free cash flow, 2027 (estimate) | US$0.7B | US$1.6B | US$3.2B |
| Free cash flow, 2030 (estimate) | US$1.5B | US$2.9B | US$5.2B |
| Free cash flow, 2036 (estimate) | US$1.0B | US$3.7B | US$9.6B |
| Free cash flow, 2027 to 2056, added up (estimate) | US$13B | US$70B | US$311B |
| Value per share (estimate) | $27 | $68 | $191 |
| Return a year on those cash flows, at the price (estimate) | loses money | about 0% | 10.8% |
Source Q3 2026 report; 2025 MD&A; three-year outlook [3][7][4]. Assumptions and values are my estimates.
The gold price in my three cases, and my cost of an ounce
US$ an ounce in money of the day, first 15 years: bear to bull gold, with the base gold price and my base cost marked
- Bear to bull gold US$2,500 to US$7,129 in 2041
- Base gold, 2041 US$4,638
- Base cost, 2041 US$2,388
The base path, year by year
US$ millions unless marked; the first ten of 30 years.
| 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 2036 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Gold price, US$ an ounce (estimate) | $3,515 | $3,586 | $3,657 | $3,731 | $3,805 | $3,881 | $3,959 | $4,038 | $4,119 | $4,201 |
| Gold produced, thousand ounces (estimate) | 3,280 | 3,280 | 3,100 | 3,310 | 3,623 | 3,540 | 3,598 | 3,498 | 3,348 | 3,093 |
| Revenue (estimate) | US$11.5B | US$11.8B | US$11.3B | US$12.3B | US$13.8B | US$13.7B | US$14.2B | US$14.1B | US$13.8B | US$13.0B |
| Total cash cost, US$ an ounce (estimate) | $1,173 | $1,251 | $1,275 | $1,282 | $1,312 | $1,357 | $1,403 | $1,456 | $1,516 | $1,577 |
| EBITDA (estimate) | US$7.0B | US$7.0B | US$6.7B | US$7.4B | US$8.3B | US$8.2B | US$8.5B | US$8.3B | US$7.9B | US$7.3B |
| Cash tax at 34% (estimate) | US$1.79B | US$1.63B | US$1.42B | US$1.55B | US$1.86B | US$1.81B | US$1.96B | US$1.91B | US$1.77B | US$1.55B |
| Sustaining capital (estimate) | US$0.97B | US$1.01B | US$0.95B | US$1.03B | US$1.10B | US$1.13B | US$1.23B | US$1.23B | US$1.14B | US$1.00B |
| Development capital (estimate) | US$2.56B | US$2.59B | US$2.95B | US$1.94B | US$1.82B | US$1.01B | US$1.28B | US$1.69B | US$1.74B | US$1.07B |
| Free cash flow (estimate) | US$1.64B | US$1.73B | US$1.38B | US$2.89B | US$3.57B | US$4.27B | US$4.00B | US$3.45B | US$3.29B | US$3.69B |
| My all-in sustaining cost, US$ an ounce (estimate) | $1,548 | $1,638 | $1,668 | $1,678 | $1,694 | $1,761 | $1,829 | $1,899 | $1,953 | $2,010 |
My 2027 cost, US$1,548, is at the top of the company’s 2026 guide, as its statements on diesel, consumables and the Barnat pit suggest. Free cash flow dips in 2029 to US$1.4B as Hope Bay, Odyssey and the underground projects are built, and then rises to US$3.6B in 2031 and US$4.3B in 2032 when they run. After that it falls as mines near the end of their disclosed lives.
What it is worth, against the price
Value per share in US dollars, my estimates, against the NYSE close in Q4 2026
- Bear to bull US$27 to US$191
- Base US$68
- Price US$151.30
- Margin of safety below US$55
Break-even
The model puts numbers on how low gold can go. On my 2027 cost base and capital plan, free cash flow is zero at a gold price of about US$2,722, and it covers the US$0.9B a year dividend at about US$3,163.5 Both are above the US$1,600 the company uses for reserves, and the second is 10% below today’s price. The company can pay for gold falling a good way, because it can stop building. What it cannot do is pay for the share price to stay where it is: at US$3,000 gold the stock is worth $44 on my base cost path, 71% less than $151.30.
The margin of safety
- Price$151.30Close in Q4 2026 [1]
- Base value$68My estimate
- Margin-of-safety price$55Base earns about 11.5% a year
I set the margin of safety at $55, the price at which my base case earns about 11.5% a year, three points above the 8.5% I require. That is 19% under my base value. I chose a return and not a discount to base because I do not trust my base to the cent: it rests on a gold price I cannot forecast. I did not set the price to guard against a collapse to US$2,500: on my base cost path that would leave the shares worth about $22, and my bear case $27.
Two different questions
How good is the business, and how good is the price? On the first, I find a pure gold miner with net cash of US$3.4B, A- credit, mines in the places most miners would choose, record reserves, production above the middle of its 2025 guidance, and a free cash flow margin of 28% of revenue in the last twelve months (calculated).37 It is a very good business of its kind, and its kind is hard: it sells a commodity at a price it cannot set to a world that keeps changing its costs. On the second, the price at $151.30 is 123% above my base value, inside my range, and I see it as paying for the friendly side of gold, of the mines, of costs and of the discount rate together. A very good business in a hard industry at a price that needs a lot to go right: these are three separate things, and I would not blur them.
Where this could be in 5 and 10 years
Value at a date is the present value then, at 8.5%, of the free cash flow after it, per today’s 507.2M shares, in that year’s dollars. It leaves out today’s net assets and buybacks. The last column assumes someone buys at $151.30, collects all the free cash flow as it is paid to 2056, and also receives the net assets of US$11 a share at the start.
Where this could be in 5 and 10 years
Value per share in each case, and the return from today’s price. Dollars of the date shown.
| Value at end of 2031 | Value at end of 2036 | Free cash flow paid, 2027 to 2036 | Return a year, price to 2056 | |
|---|---|---|---|---|
| Bear (estimate) | $12 | $4 | $22 | loses money |
| Base (estimate) | $59 | $45 | $59 | about 0% |
| Bull (estimate) | $221 | $228 | $132 | 10.8% |
Why, in plain words. For the base to stand, gold has to stay near today’s futures price after inflation, the company has to keep output near 3.3 million ounces through 2036 by building Hope Bay and finding ounces to replace what it mines, and costs have to rise no more than 3% a year after 2028. At $151.30 the stock then returns about 0% a year over the 30 years I model, with nothing counted after 2056. To earn 8.5% a year on the cash flows alone, the price would have to be near US$68, which is my base value, or gold higher. Even with every project built, every mine carried and gold 23% above my deck for good, the return would be only 8.5% (estimate).
The single most likely way my base is wrong is gold. At US$3,000 it falls to $44, and at the January record of US$5,318 it rises to $150. The second is how long the mines last: with no carry past disclosed lives the base falls to $63, and with all of it at full credit it rises to $79. A reader’s guide. These are estimates of value, not forecasts of the share price, and the price can sit above or below value for years.
The case for the price
What most people miss
Three things cut in the company’s favour. Reserves are counted at US$1,600 gold, less than half of today’s price; the company says a 10% higher price adds 9% to reserves, and the year-end update is due in February.6 The Canadian Malartic mill is expected to have about 40,000 tonnes a day of spare capacity once the open pit ends in 2029, with Marban’s 1.58 million ounces of first reserves next door.46 And the last twelve months of free cash flow carry two years of tax: about US$1.3B of the 2025 bill was paid in the first quarter of 2026.43
The bull case
In plain words: gold has found a floor well above where it was two years ago, the company earns roughly US$2,000 an ounce over its all-in sustaining cost at today’s price, and its ounces are in the safest places. It has net cash of US$3.4B, returns more than half of its free cash flow, and has a pipeline it says could take output from about 3.4 million ounces to above four million in the early 2030s.54 On 28 October Mr. Al-Joundi said the company would keep “increasing gold production per share for our owners.”5 By my arithmetic ounces per share fell from 7.4 per thousand shares in 2016 to 6.9 in 2025, while reserves per share rose 25%.17712 Duquesne Family Office LLC reported 231,050 Agnico Eagle shares in its filing for the quarter ended 30 September 2026, filed on 16 November; its filings for the two earlier quarters list none.24 A holding on one date is not an argument and I do not use it as one. I use no analyst targets.
Against reality
Net cash, record reserves, a schedule for Hope Bay and free cash flow of US$4.2B in twelve months support part of it.53 What is missing is the price. Gold futures closed at US$4,300 or more on 146 of 224 days in 2026, and the monthly average fell from US$5,036 in February to US$3,917 in November so far (calculated).8 If gold stays above US$4,300, every pipeline project is built on budget, mines are carried well past their disclosed lives and costs rise a point a year slower than I assume, then $151.30 is possible. My bull case gets past it, at $191. Multiply it out: gold above US$4,300 through 2029, 30%; costs on my path or better, 60%; projects on time and budget, 55%; mines carried past their lives, 50%. That is about 5% if independent (estimate), and they are not, so I would not go above 12%. The 25% I give my bull case in the weighted value of $88 is, if anything, generous, and that value is still 42% under the price.
What a 10x would take. Ten times $151.30 is $1,513, about US$0.77 trillion of market value, six times what my Newmont page showed for the largest gold miner on 4 November. At today’s 18 times trailing free cash flow, that needs about US$42B of free cash flow a year, against US$4.2B now (calculated). On my base the value moves about US$46 a share for each US$1,000 on gold, so gold would have to be near US$35,000 an ounce, or gold at US$8,000 and about 18 million ounces a year, more than 5 times today’s output (estimate). And by when: ten years would mean 26% a year. The shares rose 3.5 times in the last ten years, 13% a year, while gold rose 2.9 times, and Agnico is already a very large gold company (calculated).18 Tenfold from US$77B has not happened to any gold company I know of, and I did not search systematically. For a company this size and in this industry it is close to impossible, and I would put the odds below 1 in 100.
What they have to hit
Six numbers on a schedule. Thresholds are what this price needs or what my base needs, and they agree with the signposts below.
| Indicator | Today | What the case needs | Where to track it | Next check |
|---|---|---|---|---|
| Average realized gold price | US$4,264 in Q3 2026; futures US$3,515 on 20 November38 | US$4,300 or more in 2027, rising 2% a year, for the friendly case; US$5,350 for my base to reach the price (estimate) | Q3 report, results table, “Average realized gold price”; gold futures on Yahoo Finance (GC=F) | Fourth-quarter results, expected February 2027 (date not yet announced) |
| All-in sustaining cost | US$1,648 in Q3; US$1,529 for nine months; 2026 guide US$1,400 to US$1,550, near the top5 | 2027 guide at or under US$1,600, with gold under US$4,000; my base is US$1,548 before closure accruals (estimate) | Results release, “2026 Guidance Summary” and the 2027 outlook table | Fourth-quarter results with 2027 to 2029 guidance, expected February 2027 |
| Payable gold production | 2.49 million ounces for nine months; 2026 near the low end of 3.3 to 3.5 million5 | At least 3.3 million in 2027 and 3.4 million from 2030 as Hope Bay starts; my base is 3.28 million in 2027 (estimate) | Results release, “Production and Cost Results Summary”; the guidance table by mine | Fourth-quarter results, expected February 2027 |
| Free cash flow | US$852M in Q3; US$4.23B in twelve months53 | About US$1.6B in 2027 at US$3,515 gold and US$3B or more in 2030, which my base needs (estimate) | Release, “Free cash flow” in the highlights; cash flow statement in the MD&A | Fourth-quarter results, expected February 2027 |
| Hope Bay construction | 73% of engineering and 13% of construction done; US$2.4B initial capital514 | On budget at US$2.4B with first gold in 2030; capital above US$2.8B or a delay past 2031 would cut my base (estimate) | Release, “Update on key value drivers and pipeline projects”, Hope Bay | Each quarterly report; next is expected in February 2027 |
| Detour Lake underground and share count | Exploration ramp at 207 metres; decision expected in mid-2027, per the February outlook; 506.0M shares against 500.8M at the start of 20265374 | A positive decision on time; shares back under 500M by the end of 2027, bought at prices under value (estimate) | Release, “Detour Lake”; equity note in the MD&A | Project update in 2027; first-quarter 2027 report, expected late April 2027 |
Where I come down
The net cash, the record reserves, the clear mine-by-mine guidance and Hope Bay on schedule moved me; without them my base would be lower than $68. The price did not move me, because it needs the friendly side of gold, the mines, costs and the rate at once, and the fall of the last two weeks has not changed that. A higher reserve price in the year-end update, a 2027 cost guide at or under US$1,600 or a positive Detour Lake underground decision would raise my values most, though none changes what gold does.
Risks, and what would change my view
The three ways this goes badly wrong are at the start of Valuation. These are the rest.
- Cost. The company’s cost per ounce is up 21% in a year. Each 5% on costs is US$4 a share; each 10% on diesel is about US$8 an ounce of total cash cost and each cent on the Canadian dollar about US$6, in the company’s 2026 guidance.4 The company expects 3% to 5% inflation in 2027 and 2028.4
- Capital. The company is about to spend US$2.4B on Hope Bay, and has a pipeline of larger projects with capital it has not published. If Detour Lake underground or Upper Beaver cost more than the US$6,000 for each annual ounce I assume, the value of the pipeline falls.
- Closure. The reclamation provision is US$1.40B at present value; a bill of US$2.8B would take about US$3 off the base.3
- The premium itself. The price pays a premium for the company’s jurisdiction and record. If gold stops rising, the premium has no growth to rest on. Part of management’s pay depends on the multiple of price to net asset value, so management is not an outside judge of it.13
- Acquisitions and the cash. The company paid US$2.0B in 2026 for Central Lapland, may pay up to about C$0.6B more through the Rupert right, and bought back US$818M of stock at an average of US$188.3
- People. The chief executive’s pay of US$17.6M is mostly in share units, which fall as the price falls and make the team’s pay depend on the same variable as mine.13 Mr. Al-Joundi has been chief executive since 2022 and the chief financial officer has served since 2023.
Geopolitical risk, and what it means for the value
Agnico mines in four countries, and by nine-month sales Canada was 85%, Finland 7%, Australia 5% and Mexico 3% (calculated).3 Within Canada I watch Nunavut most: the mines depend on an annual sealift for fuel and supplies and on Inuit agreements, such as the Hope Bay agreement extended to 2056 in October, and in Quebec and Ontario tax and permits are set by provinces and Ottawa.5 In Finland the Supreme Administrative Court restored the Kittila permits in October 2023 after a challenge.19 In the United States and Canada trade dispute, the company says its revenue is unaffected because its gold is refined in Canada, Australia and Europe, and that Canada’s retaliatory tariffs add about US$5 an ounce to cost.3
I ran each scenario through my model by scaling the present value of free cash flow, US$29B in my base, by the operation’s share of the present value of mine margin. The odds are my guesses, with the basis shown. The bigger point is what is already in the price: at $151.30 it needs gold near US$5,350 in 2027, or a return near 5% with every project built, so some of the market’s case is a bet that gold recovers. What the price does not include is a country-specific loss or a higher tax rate, which would come on top.
| Scenario | Who decides | Odds and basis | Base value | Change |
|---|---|---|---|---|
| Canada’s combined cash tax rate is 38% instead of 34% | Federal and provincial governments | 1 in 4 within five years. The company already guides 35% to 40% in Canada and Mexico4 | $64 | −$4 |
| Nunavut loses a quarter of its cash for good: logistics, permits or an agreement | Nunavut Tunngavik, the Kitikmeot Inuit Association, Ottawa | 1 in 10 over five years. Meliadine, Meadowbank and Hope Bay are 19% of the present value of mine margin (calculated) | $65 | −$3 |
| Finland: a permit decision halves Kittila’s cash for good | Finnish courts and regulators | 1 in 10. The permits were restored in 2023 after a court challenge19 | $67 | −$1 |
| Mexico: Pinos Altos stops at once | Federal and state governments, unions | 1 in 5. It is about 0.2% of the present value of mine margin, with a life to 20287 | $67.9 | −$0.1 |
| A Barnat-type event costing a year of Detour Lake’s output | Geology, regulators | 1 in 3 across the portfolio in five years. About 600,000 ounces at about US$2,000 margin, after tax3 | $66 | −$1.5 |
| Gold goes back to US$2,500 and stays near it, rising 2% a year | Markets, central banks | 1 in 5. The realized price was US$2,384 in 202418 | $22 | −$46 |
The table makes one thing plain. Country risk, even when it hits, is worth a few dollars a share. A fall in gold to US$2,500 is worth US$46. Mines in safe places lower the chance that one is taken; they do nothing about the price. The real concentration is in one price. Two more risks sit in the filings: the Nunavut sealift, which put about US$21M on fourth-quarter costs this year, and seismic activity at LaRonde, which the company says becomes more likely as the mine deepens.57
What would change my view
Signals that move my values, in either direction.
| Signal | Today | Raises my value | Lowers my value |
|---|---|---|---|
| Gold price | US$4,264 realized in Q3; futures US$3,51538 | Realized price above US$4,300 for a year | Realized price below US$3,000 for a year |
| All-in sustaining cost | US$1,648 in Q3; 2026 guide US$1,400 to US$1,5505 | A 2027 guide at or under US$1,600 | A 2027 guide above US$1,750 |
| Gold production | 2.49 million ounces for nine months; guide 3.3 to 3.5 million, low end5 | 2027 above 3.4 million | 2027 below 3.2 million |
| Reserve price and reserves | US$1,600 gold and 55.4 million ounces at 31 December 20256 | Reserve price raised at the year-end update, with reserves up more than the ounces mined | Reserves down for a second year |
| Share price against value | US$151.30; my base US$681 | Buybacks at prices under US$70 | Buybacks above US$150 continue while gold falls |
| Hope Bay and Detour Lake underground | Hope Bay 13% built; Detour decision expected in mid-202754 | Hope Bay on budget; a positive Detour Lake decision | Hope Bay capital above US$2.8B or a delay past 2031 |
| Management | Chief executive since 2022; chief financial officer since 202313 | A stable team through Hope Bay and the Detour decision | Senior exits during construction |
Sources
- 1AEM quote and daily closes, Nasdaq.com API (opens in a new tab)
- 2Audited consolidated financial statements for 2025 (Exhibit 99.2 to Form 6-K) (opens in a new tab)
- 3Third Quarter Report 2026: Management’s Discussion and Analysis (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 4Agnico Eagle reports fourth quarter and full year 2025 results and three-year outlook (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 5Agnico Eagle reports third quarter 2026 results (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 6Update on 2025 exploration results and 2026 exploration plans: reserves and resources at 31 December 2025 (Exhibit 99.5 to Form 6-K) (opens in a new tab)
- 7Management’s Discussion and Analysis for the year ended 31 December 2025 (Exhibit 99.3 to Form 6-K) (opens in a new tab)
- 8Gold futures (GC=F) daily closes, COMEX front month (opens in a new tab)
- 9Gold price on Friday, November 20, 2026 (opens in a new tab)
- 10Wall Street stays bearish after gold’s slide to $3,500, Main Street pessimism deepens ahead of holiday week (opens in a new tab)
- 11US Treasury daily par yield curve rates, 2026 (opens in a new tab)
- 12Management’s Discussion and Analysis for the year ended 31 December 2017 (Exhibit 99.3 to Form 40-F) (opens in a new tab)
- 132026 Management Information Circular (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 14Agnico Eagle approves Hope Bay investment decision (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 15Agnico Eagle to consolidate Finland’s Central Lapland Greenstone Belt (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 16Agnico Eagle reports wall movement at Barnat open pit at Canadian Malartic (Exhibit 99.1 to Form 6-K) (opens in a new tab)
- 17XBRL company facts for Agnico Eagle Mines Limited (CIK 0000002809) (opens in a new tab)
- 18Management’s Discussion and Analysis for the year ended 31 December 2024 (Exhibit 99.3 to Form 6-K) (opens in a new tab)
- 19Management’s Discussion and Analysis for the year ended 31 December 2023 (Exhibit 99.3 to Form 40-F) (opens in a new tab)
- 20Management’s Discussion and Analysis for the year ended 31 December 2022 (Exhibit 99.3 to Form 40-F) (opens in a new tab)
- 21Management’s Discussion and Analysis for the year ended 31 December 2021 (Exhibit 99.3 to Form 40-F) (opens in a new tab)
- 22Management’s Discussion and Analysis for the year ended 31 December 2020 (Exhibit 99.3 to Form 40-F) (opens in a new tab)
- 23Management’s Discussion and Analysis for the year ended 31 December 2018 (Exhibit 99.3 to Form 40-F) (opens in a new tab)
- 24Form 13F-HR of Duquesne Family Office LLC for the quarter ended 30 September 2026 (CIK 0001536411) (opens in a new tab)
How the figures are labelled
(reported)Reported: taken from a filing or a price feed, as printed.
(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.
(estimate)Estimate: my judgement, such as a case value or a growth assumption.
The price
Close in Q4 2026: $151.30, New York Stock Exchange, from Nasdaq’s historical feed, which agrees with the Yahoo Finance chart feed [1]. Retrieved in Q4 2026. The company reports in US dollars under international accounting rules. Shares are the 505,999,563 outstanding at 30 September 2026 for market value, and the Q3 diluted count of 507.2 million for per-share values [3]. Gold is COMEX front-month futures through Yahoo Finance, not the LBMA fix; spot was within about US$25 of it [8][9][10]. Fiscal years are calendar years. The twelve months to 30 September 2026 (TTM) is 2025 plus nine months of 2026 less nine months of 2025.
The valuation
Thirty-year discounted cash flow on owner cash, 2027 to 2056, each year’s cash at year end, counted from 1 January 2027, at 8.5% (the 4.92% ten-year Treasury plus 3.6 points) and no value after 2056 [11]. Output is built mine by mine from the company’s 2026 to 2028 guidance and disclosed mine lives, with stated additions for Hope Bay, other growth projects and life extension. Total cash cost per ounce starts from the 2026 guidance by mine and moves with gold at US$3 an ounce for each US$100 and with inflation; sustaining capital per ounce is from nine-month 2026 spending by mine. Tax is 34% of profit after depreciation. Development capital is set out in Section VI. A year in which a mine would not cover its capital is set to zero. Cash is the 30 September balance plus my fourth-quarter estimate less the December dividend; debt is at face value; closure provisions are at book and counted as debt; investments are at fair value and Central Lapland at the cost paid. The odds in Section VII are my guesses; the weighted value of $88 uses 25%, 50% and 25%.
The margin-of-safety price is $55, the price at which my base case earns about 11.5% a year. No rating: the page states a range and the price, and leaves the decision to the reader.
Research, not investment advice. Figures as of .
Legal information and disclosures
These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.
This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.
Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.
Please do not copy or republish this material without my written consent.