Investing№ 89NYSE: PUMP

ProPetro

ProPetro pumps fracturing fluid in the Permian Basin and is spending about $1.6B on a power-rental business; it turned $1,222M of revenue into a $203M owner cash outflow over the past year, and only 60 MW of its 510 MW under contract is a data centre.

Updated Fiscal year is the calendar year34 min readPedrum Shokouhi

Thin moat

Research, not investment advice. Figures as of .

Key numbers

  • Revenue$1,222M (calculated)TTM Sep 2026; 2019 peak $2,052M [2][3][4]
  • Adjusted EBITDA$192M (calculated)TTM Sep 2026, company definition, before stock pay and after $63M of fleet rent [3][5]
  • Owner cash flow−$203M (calculated)TTM Sep 2026, after capital spending and stock pay; net income $2M [6][2][3]
  • Ten-year owner cash$11M (calculated)2016 to 2025, on $12.5B of revenue [6][5]
  • Power under contract510 MW (reported)Of about 1,100 MW delivered or on order; 60 MW is a data centre [3][7]
  • Net debt$135M (calculated)Face value at 30 Sep 2026, before $633M of equipment commitments [2]

The answer

  1. ProPetro pumps fracturing fluid for oil producers in the Permian Basin and is now spending about $1.6B to build a second business that rents gas-fired power plants, and over the twelve months to September 2026 it turned $1,222M of revenue into $192M of Adjusted EBITDA and an owner cash outflow of $203M (calculated).236
  2. I value it at $6 a share, in a range of $1 to $19. In my model the oilfield business alone is worth about $4 a share to an owner after the equipment it must keep buying, the 262 MW of power already running adds about $3, and finishing the rest of the power programme at the returns the company targets takes off about $1.40, because it earns about its cost of capital and carries $10M a year of overhead. That split is my own model's, not a figure the company or any analyst reports (estimate).289
  3. At $7.73 the price is 32% above my base value and 59% below my bull; closing the gap needs each megawatt to earn about $316k a year, a payback near 4.6 years rather than 5.4, and my margin-of-safety price is $3 (estimate).18

Six questions, one line each

Why
Oil producers are using more fracturing capacity and paying more for it, and data centres and gas processors need power faster than the grid can supply it; ProPetro has bought engines for both bets and says 510 MW of power is under contract (reported).38
The moat
Thin in pumping, where price decides, and unproven in power, where the edge is a Caterpillar supply agreement and one year of field work (estimate).59
Management
Home-grown operators paid partly for signing megawatts; the chief executive owns about $5M of stock and no insider has bought on the open market in a year (calculated).1011
The numbers
Revenue of $1,222M, Adjusted EBITDA of $192M and net income of $2M over twelve months; across 2016 to 2025 the company earned $12.5B of revenue and left owners about $11M of cash (calculated).62
The price
$7.73 is 32% above my base of $6 and 59% below my bull of $19; weighting the cases 25%, 50% and 25% gives $8, about the price (estimate).1
What would change my mind
Signed data-centre contracts beyond the single 60 MW one, a PROPWR quarterly profit of $30M, and fracturing prices that stick when most fleets reprice in the first half of 2027 (estimate).738

The business

ProPetro is two businesses on one balance sheet, and they are at very different ages. The old one pumps. It provides hydraulic fracturing, wireline and cementing services to oil and gas producers, all of it in the Permian Basin of Texas and New Mexico, and it was 67% fracturing by revenue in the first nine months of 2026.2 The new one, PROPWR, was formed in December 2024. It buys gas-fired engines and turbines, puts them on a customer's site and charges for the power. It earned $1.5M of revenue in all of 2025 and $22M in the third quarter of 2026 alone.53

The company came to the market in March 2017, selling 13.25M shares for $170M after costs.4 It was a fast-growing pumper then, with a customer list led by Pioneer Natural Resources. In December 2018 it bought Pioneer's pressure-pumping assets for 16.6M shares and $110M in cash, and Pioneer became a large customer and its largest holder.4 Exxon Mobil bought Pioneer in May 2024 and sold all 16.6M of those shares at $16.66 on 20 May 2026.211 Exxon was still 24.9% of 2025 revenue, and the contract for two of the company's electric fleets with Exxon's XTO unit is expected to end in late 2026 without renewal.52

Revenue and Adjusted EBITDA

Calendar years, US$ millions

  • Revenue, TTM $1,222M
  • Adjusted EBITDA, TTM $192M
Revenue and Adjusted EBITDARevenue and the company's Adjusted EBITDA by year. Revenue was $437M in 2016, $2,052M in 2019, $789M in 2020, $1,630M in 2023, $1,269M in 2025 and $1,222M over the twelve months to September 2026; Adjusted EBITDA $8M, $519M, $142M, $404M, $208M and $192M.$0$500M$1B$1.5B$2B’16’18’20’22’24TTMRevenue, 2016: $437MRevenue, 2017: $982MRevenue, 2018: $1,705MRevenue, 2019: $2,052MRevenue, 2020: $789MRevenue, 2021: $875MRevenue, 2022: $1,280MRevenue, 2023: $1,630MRevenue, 2024: $1,444MRevenue, 2025: $1,269MRevenue, TTM Sep 2026: $1,222MAdjusted EBITDA, 2016: $8MAdjusted EBITDA, 2017: $137MAdjusted EBITDA, 2018: $388MAdjusted EBITDA, 2019: $519MAdjusted EBITDA, 2020: $142MAdjusted EBITDA, 2021: $135MAdjusted EBITDA, 2022: $317MAdjusted EBITDA, 2023: $404MAdjusted EBITDA, 2024: $283MAdjusted EBITDA, 2025: $208MAdjusted EBITDA, TTM Sep 2026: $192MRevenue and Adjusted EBITDARevenue and the company's Adjusted EBITDA by year. Revenue was $437M in 2016, $2,052M in 2019, $789M in 2020, $1,630M in 2023, $1,269M in 2025 and $1,222M over the twelve months to September 2026; Adjusted EBITDA $8M, $519M, $142M, $404M, $208M and $192M.$0$500M$1B$1.5B$2B’16’17’18’19’20’21’22’23’24’25TTMRevenue, 2016: $437MRevenue, 2017: $982MRevenue, 2018: $1,705MRevenue, 2019: $2,052MRevenue, 2020: $789MRevenue, 2021: $875MRevenue, 2022: $1,280MRevenue, 2023: $1,630MRevenue, 2024: $1,444MRevenue, 2025: $1,269MRevenue, TTM Sep 2026: $1,222MAdjusted EBITDA, 2016: $8MAdjusted EBITDA, 2017: $137MAdjusted EBITDA, 2018: $388MAdjusted EBITDA, 2019: $519MAdjusted EBITDA, 2020: $142MAdjusted EBITDA, 2021: $135MAdjusted EBITDA, 2022: $317MAdjusted EBITDA, 2023: $404MAdjusted EBITDA, 2024: $283MAdjusted EBITDA, 2025: $208MAdjusted EBITDA, TTM Sep 2026: $192MRevenue and Adjusted EBITDARevenue and the company's Adjusted EBITDA by year. Revenue was $437M in 2016, $2,052M in 2019, $789M in 2020, $1,630M in 2023, $1,269M in 2025 and $1,222M over the twelve months to September 2026; Adjusted EBITDA $8M, $519M, $142M, $404M, $208M and $192M.$0$500M$1B$1.5B$2B’16’17’18’19’20’21’22’23’24’25TTMRevenue, 2016: $437MRevenue, 2017: $982MRevenue, 2018: $1,705MRevenue, 2019: $2,052MRevenue, 2020: $789MRevenue, 2021: $875MRevenue, 2022: $1,280MRevenue, 2023: $1,630MRevenue, 2024: $1,444MRevenue, 2025: $1,269MRevenue, TTM Sep 2026: $1,222MAdjusted EBITDA, 2016: $8MAdjusted EBITDA, 2017: $137MAdjusted EBITDA, 2018: $388MAdjusted EBITDA, 2019: $519MAdjusted EBITDA, 2020: $142MAdjusted EBITDA, 2021: $135MAdjusted EBITDA, 2022: $317MAdjusted EBITDA, 2023: $404MAdjusted EBITDA, 2024: $283MAdjusted EBITDA, 2025: $208MAdjusted EBITDA, TTM Sep 2026: $192M
TTM is the four quarters to 30 September 2026. Adjusted EBITDA is the company definition, before stock pay; from 2023 it is after about $63M a year of rent on the electric fleets. Revenue fell 61% from 2019 to 2020. Source 10-Ks 2017 to 2025; 10-Q Q3 2026; Q3 2026 release [12][4][13][14][15][5][2][3]

The pumping business

At 30 September the company owned 1,205,500 hydraulic horsepower: 452,500 of dual-fuel units that burn diesel and gas, 435,000 of older diesel units, 6,000 of gas-only and 312,000 of electric FORCE units that it rents under leases.2 It has 28 wireline units and 31 cementing units.2 It runs 13 active fleets, up from 11 at the start of the year, and says it is essentially sold out; it estimates that only the mid-70s Permian fleets are active in the whole basin.8 More than two-thirds of its active horsepower is on contract, and most of those contracts renew in the first half of 2027.8 That date matters for the valuation: if pricing has risen, the repricing flows straight to profit. It is the company's best-supported source of upside, and the one I can least measure in advance.

Fracturing is a business of high capital and thin pricing power. Customers pick on price first, the 10-K says, then on reputation, emissions and service.5 The top five customers were 68.2% of 2025 revenue and the top ten 84.5%.5 In the third quarter, fracturing earned $45.4M of segment Adjusted EBITDA on $235.2M of revenue, a 19% margin; wireline earned 22% and cementing 19%; unallocated corporate cost was $13.7M.3 After corporate cost the completions side made 15.6% in the quarter, and the company says rebuilding capacity, rehiring crews and restocking parts cost more than it expected.38

PROPWR

PROPWR sells "power as a service": it supplies and runs the engines and the customer buys the gas. Roughly 80% of the equipment it has on order is gas reciprocating engines and 20% modular turbines.2 The first large customer was a hyperscaler data centre in the US Midwest, 60 MW with batteries, announced in October 2025 and running since June 2026.716 Since then contracts have been signed with Coterra, an unnamed upstream operator, an industrial customer and, in September, a subsidiary of Targa Resources for about 230 MW to serve gas-processing plants in the Permian, fully deployed in early 2028.171618

Where the megawatts stand

As the company disclosed them, quarter by quarter.

Where the megawatts stand
DateUnder contractDelivered or on orderWhat changed
Hyperscaler, Midwest (reported)27 Oct 202560 MW–Batteries plus gas engines; running since June 2026
Update to investors (reported)26 Jan 2026About 230 MWAbout 550 MWCoterra microgrids in New Mexico signed in December; weighted tenor about five years
First quarter (reported)31 Mar 2026About 240 MWAbout 550 MWCaterpillar framework signed 28 April
Second quarter (reported)30 Jun 2026About 350 MWAbout 1.1 GW110 MW added: an upstream operator and an industrial customer
Third quarter (reported)30 Sep 2026About 510 MWAbout 1.1 GW230 MW Targa added; 350 plus 230 is 580, so about 70 MW of earlier oil and gas contracts fell away
Contracted megawatts went from 60 in October 2025 to 510 a year later, but fell by about 70 MW in the last step, by the company’s own account. Source 8-Ks and 10-Qs [7][17][19][16][18][3]. Reported.

I looked for the number that most people skip. The company does not list the 510 MW by customer. The only data-centre contract in its releases is the 60 MW one, which I take to be inside the 510 MW, so 60 MW of 510 MW is a data centre, 12% of the total, and the same company says the majority of its fleet will go to data centres.78 The remainder is oil and gas, midstream and industrial work that carries shorter terms; the January update put the weighted tenor at about five years.17 The October presentation targets 10 to 15 year terms for the larger plants it hopes to build.20 Management says it is in "advanced negotiations" on several hundred megawatts of data-centre power and that timelines have lengthened.8 Those talks have run for at least two quarters without a signature, and I cannot tell from here when they end.

Megawatts: running, signed, bought and hoped for

Megawatts, from the company's October 2026 disclosures

  • Under contract 510 MW; secured 2,600 MW
Megawatts: running, signed, bought and hoped forPROPWR power capacity. About 262 MW expected running at the end of 2026 (guide of 250 to 275), about 510 MW under contract, about 1,100 MW delivered or on order, and about 2,600 MW secured under the Caterpillar framework to 2031.05001,0001,5002,0002,500RunningSignedOn orderSecuredMegawatts, Running, end 2026 (guide): 262 MWMegawatts, Under contract: 510 MWMegawatts, Delivered or on order: 1,100 MWMegawatts, Secured to 2031: 2,600 MWMegawatts: running, signed, bought and hoped forPROPWR power capacity. About 262 MW expected running at the end of 2026 (guide of 250 to 275), about 510 MW under contract, about 1,100 MW delivered or on order, and about 2,600 MW secured under the Caterpillar framework to 2031.05001,0001,5002,0002,500RunningSignedOn orderSecuredMegawatts, Running, end 2026 (guide): 262 MWMegawatts, Under contract: 510 MWMegawatts, Delivered or on order: 1,100 MWMegawatts, Secured to 2031: 2,600 MWMegawatts: running, signed, bought and hoped forPROPWR power capacity. About 262 MW expected running at the end of 2026 (guide of 250 to 275), about 510 MW under contract, about 1,100 MW delivered or on order, and about 2,600 MW secured under the Caterpillar framework to 2031.05001,0001,5002,0002,500RunningSignedOn orderSecuredMegawatts, Running, end 2026 (guide): 262 MWMegawatts, Under contract: 510 MWMegawatts, Delivered or on order: 1,100 MWMegawatts, Secured to 2031: 2,600 MW
Of the 510 MW under contract, 60 MW is a data-centre contract and 230 MW is Targa. The company expects most of the fleet to go to data centres. Source Q3 2026 release, call remarks, presentation; 8-Ks [3][8][20][7][18]

How it earns

The power segment earned $7.6M of Adjusted EBITDA on $22.3M of revenue in the third quarter, a 34% margin, after a $0.7M loss in the second.3 Management targets a payback of four to six years on $1.4M to $1.5M a megawatt, which is $230k to $375k of EBITDA a megawatt a year, and says oil and gas and midstream work is nearer four.8 I do not yet know what the realised number is. The company has not said how many megawatts earned revenue in the quarter; it guides to 250 to 275 MW running at the end of 2026.3 Assuming about 175 MW on average, the third quarter ran at roughly $170k a megawatt a year, below target, which is normal for a first year but is the one data point that exists (estimate).

How it is paid for

The company says it raised about $1.5B for PROPWR in two years.8 In January 2026 it sold 17.25M shares at $10.00 for $163M net.221 In May it sold $690M of 0.00% convertible notes due November 2031, convertible at about $23.17, with a capped call to $29.49 that cost $36.8M.22 It has an asset-based revolver of $350M, a Caterpillar equipment loan, and a $350M Stonebriar lease line that is so far undrawn.223 At 30 September it held $729M of cash against $862M of debt at face, and liquidity of $934M.3

The moat

The test is what stops a rival from earning what ProPetro earns. I look in four places and find real protection in only one, and only partly.

Pumping. None. Price is the first factor customers use, the equipment can be bought, and the 10-K says the markets are highly competitive.5 Scale and a good crew help, and the shortage of high-quality horsepower after years of attrition helps more at the moment, but that is a cycle, not protection. Operating income was positive in five of the nine years from 2017 to 2025 (calculated).6 A business with real protection does not lose money when the rig count falls; ProPetro did, on an operating basis, in 2020, 2021, 2022 and 2024.

Supply. This is the genuine one. Engine and turbine supply is tight, and in April 2026 the company signed a framework with Caterpillar to reserve about 1.5 GW of engines, with an option for about 600 MW more through 2031, against a minimum purchase of about $1.1B.24 Of the roughly 2.6 GW it calls secured, more than 1 GW is Caterpillar's 10 MW engine.8 A rival without a slot cannot match the delivery date. But supply is a scarce input, not a customer lock, and it comes with an obligation, below.

Switching costs. Once an engine farm is running on a customer's site, moving it is expensive. That is true of every on-site power plant and it only protects a contract while it lasts. PROPWR's terms for early exit are not public, so I cannot say what a customer pays to leave.

Operating record. One year, about 250 MW running by the end of 2026, one hyperscaler site. The company is right that this matters: it is one of few behind-the-meter providers delivering prime power to a data centre today.8 It is not enough yet to count as protection. A competitor with more units, longer history and a lower cost of capital can rent the same engines.

What would show protection is a recontracting price that holds. The oil and gas contracts average about five years, so the first ones end from about 2030.17 Nothing in the filings tests that.

The competitive advantage

The advantage ProPetro claims is the combination: it already works in the Permian oil patch, it knows how to run engines in a field, and it can offer a customer that does not want to wait for the grid a plant in 12 to 18 months from a signed contract, against three to seven years or more for a utility connection.20 I believe the speed claim. The hyperscaler site went from a signed contract in October 2025 to running load in June 2026.716

The second advantage is the balance sheet, which is better than at most small oilfield companies. It has $729M of cash and no debt on its revolver.3 It also has a customer, Targa, that it calls investment grade and that sits in the same basin.18 That counterparty quality matters as much as the engine count, because the whole programme is financed on contracts.

The third is the cost side of the old business. The five electric fleets cost $63M a year in rent, which sits inside Adjusted EBITDA.3 The first buyout is expected to cost $15M to $20M in the fourth quarter, with at least three more in 2027; I assume the same price for each.32 Each buyout turns about $12.6M a year of rent into a one-off cheque of about $17M (estimate). For a company with $192M of Adjusted EBITDA, five such buyouts are worth $63M of EBITDA, a third of the total. That is a quiet source of earnings, and I put it in the base case.

An honest list of disadvantages is longer. The company is small beside Caterpillar's other customers. Its access to capital depends on a share price that fell 58% from its 2026 closing high of $18.20 on 29 April to $7.73.1 And it is signing megawatts into a market that other, bigger firms are also racing to fill.

Management

Sam Sledge, 39, has been chief executive since August 2021. He joined in 2011 as a frac technical specialist and rose through operations and strategy.5 Adam Muñoz, 43, president and chief operating officer, joined in 2010 to start the Permian pumping operation.5 The chairman, Phillip Gobe, 73, was chief executive for 17 months from March 2020 and sat on Pioneer's board until its merger with Exxon.5 The finance chief, Caleb Weatherl, 38, joined in July 2025 after running a private Midland oil producer and, before that, the finance side of another.5 His predecessor was dismissed without cause in March 2025, and the chief accounting officer resigned effective 30 October 2026, leaving the CFO as interim principal accounting officer.1025 Two senior finance changes within 19 months, while the company raises $1.5B, is something I watch.

The history needs saying plainly. In 2019 the audit committee reviewed the company's disclosure of fleet purchase agreements, then widened the review. It found about $370,000 of expenses reimbursed to senior executives, including the former chief executive, that were theirs to pay, a related-party transaction by the former chief accounting officer that was not properly disclosed, and weaknesses in controls. It found no material accounting errors and no restatement.4 Insurers paid $9.8M in 2021 and $10.4M in 2022 toward the cost of the SEC investigation and shareholder litigation that followed.14 That was largely a different management and board from today’s, and the company says it has rebuilt controls. It is also why I read the newer filings closely.

How they are paid

Sledge's summary compensation for 2025 was $6.54M.10 His annual bonus target is 115% of salary and 90% of it rests on set measures: Adjusted EBITDA, free cash flow, safety, and, since 2025, PROPWR committed megawatts, worth 10%.10 The rest is long-term awards. Half of his March 2025 grant was restricted stock that vests over three years, and half was performance units that pay on ProPetro's three-year total return against 11 oilfield-service peers.10 I read three incentives in that design. Adjusted EBITDA and committed megawatts pay for earnings and for signing, not for the return on the $1.6B being spent. Relative return against pumping peers pays for share price, not for owner cash. And no measure counts the shares issued. A manager paid this way has a reason to sign contracts and to fund them, with whatever works. I do not say that is what they are doing; I say that is what the pay rewards.

What they own, and what they sold

Sledge owns 649,336 shares, about $5.0M at $7.73 (calculated).10 All directors and officers together own 1.55%, about $15M (calculated).10 Against pay of $6.5M a year, I would call that a small stake rather than a large one. In the 12 months to 30 October there were no open-market purchases by any insider. Two directors sold: Larry Lawrence 27,000 shares at $10.84 and 35,831 at $11.16, and Michele Vion 6,916 at $10.64; Muñoz sold 17,230 at $10.14 and 70,696 at $11.17.11 The rest of the filings are vesting and shares withheld for tax. These are small sums against holdings, and they are also the prices at which insiders chose to sell, $10 to $11, 40% above today's.

The large seller was Exxon, which sold its entire 16,600,000 shares at $16.66 on 20 May 2026, about $277M (calculated).11 Exxon is also a customer, and it had held the shares since the 2018 asset sale.2 The other five-percent holders in the March proxy were Sourcerock Group (5.58%), Jeal Intec (5.25%), Vanguard (5.23%) and BlackRock (5.05%).10

What they did with capital

The test of a ten-year cycle is what owners kept. From 2016 to 2025 the company took in $12.5B of revenue, earned $86M of net income in total and generated about $11M of owner cash, after paying for equipment and stock awards (calculated).6 In the good years, 2018 and 2019, cash went into new equipment and the Pioneer deal. In 2023 and 2024 it bought back 13.0M shares for $110.8M, an average of $8.53 a share.15 In January 2026 it sold 17.25M shares at $10.00 for $163M.2 Buying at $8.53 and selling at $10 is not a bad result, and the sale was needed to fund the engines. But the share count is 122.9M now against 103.0M at the end of 2024, and 152.6M if the convertible converts (calculated).26

Shares outstanding

Millions of shares at year end

  • October 2026 122.9M
Shares outstandingShares outstanding in millions at each year end: 52.6 in 2016, 100.2 in 2018, 114.5 in 2022, 103.0 in 2024, 104.3 in 2025, 122.9 in October 2026 and 152.6 if the convertible notes were converted.050100150’16’18’20’22’24’26Shares, 2016: 52.6MShares, 2017: 83.0MShares, 2018: 100.2MShares, 2019: 100.6MShares, 2020: 100.9MShares, 2021: 103.4MShares, 2022: 114.5MShares, 2023: 109.5MShares, 2024: 103.0MShares, 2025: 104.3MShares, Oct 2026: 122.9MShares, If converted: 152.6MShares outstandingShares outstanding in millions at each year end: 52.6 in 2016, 100.2 in 2018, 114.5 in 2022, 103.0 in 2024, 104.3 in 2025, 122.9 in October 2026 and 152.6 if the convertible notes were converted.050100150’16’17’18’19’20’21’22’23’24’25’26Conv.Shares, 2016: 52.6MShares, 2017: 83.0MShares, 2018: 100.2MShares, 2019: 100.6MShares, 2020: 100.9MShares, 2021: 103.4MShares, 2022: 114.5MShares, 2023: 109.5MShares, 2024: 103.0MShares, 2025: 104.3MShares, Oct 2026: 122.9MShares, If converted: 152.6MShares outstandingShares outstanding in millions at each year end: 52.6 in 2016, 100.2 in 2018, 114.5 in 2022, 103.0 in 2024, 104.3 in 2025, 122.9 in October 2026 and 152.6 if the convertible notes were converted.050100150’16’17’18’19’20’21’22’23’24’25’26Conv.Shares, 2016: 52.6MShares, 2017: 83.0MShares, 2018: 100.2MShares, 2019: 100.6MShares, 2020: 100.9MShares, 2021: 103.4MShares, 2022: 114.5MShares, 2023: 109.5MShares, 2024: 103.0MShares, 2025: 104.3MShares, Oct 2026: 122.9MShares, If converted: 152.6M
Share counts rose with the 2017 listing, the 2018 Pioneer purchase and the January 2026 sale of 17.25M shares; they fell with $111M of buybacks in 2023 and 2024. Source 10-Ks; XBRL; 10-Q Q3 2026; 8-K [6][2][21][22]

Financials

ProPetro has audited filings from before its 2017 listing, so there are ten full years of the pumping business and about five quarters of the power business. I show both, and I say plainly that the second is too short to model on its own history.

The pattern is a cycle with no trend. Revenue reached $2,052M in 2019 and fell to $789M in 2020. It came back to $1,630M in 2023 and has slid to $1,269M in 2025 and $1,222M over the past twelve months.4 Adjusted EBITDA peaked at $519M in 2019 and was $192M over the twelve months, a margin of 15.7% against 25.3% at the top.4 Part of the fall is the lease: from 2023 the company has paid about $63M a year in rent for its electric fleets, and that rent is inside Adjusted EBITDA, where in 2019 the same equipment would have been bought.153 Net income over the ten years was $86M in total, against $12.5B of revenue.

ProPetro, ten years and the latest twelve months

Calendar years, US dollars. TTM is the four quarters to 30 September 2026. Capital spending is cash paid to 2022 and spending incurred from 2023 and in TTM. Owner cash flow is operating cash flow less capital spending plus asset sales less stock pay.

Financial summary by year
2016201720182019202020212022202320242025TTM Sep 2026
Revenue (reported)$437M$982M$1,705M$2,052M$789M$875M$1,280M$1,630M$1,444M$1,269M$1,222M
Revenue growth (calculated)–124.7%73.6%20.4%−61.5%10.8%46.3%27.4%−11.4%−12.1%–
Operating income (reported)−$67M$24M$233M$221M−$131M−$69M−$3M$130M−$167M$6M–
Adjusted EBITDA, company definition (reported)$8M$137M$388M$519M$142M$135M$317M$404M$283M$208M$192M
Adjusted EBITDA margin (calculated)1.8%14.0%22.8%25.3%17.9%15.4%24.7%24.8%19.6%16.4%15.7%
Net income (reported)−$53M$13M$174M$163M−$107M−$54M$2M$86M−$138M$1M$2M
Operating cash flow (reported)$11M$109M$393M$455M$139M$155M$300M$375M$252M$232M$196M
Capital spending (reported)$43M$286M$284M$503M$101M$144M$320M$310M$133M$281M$398M
Asset sales (reported)$1M$4M$4M$8M$6M$39M$9M$9M$6M$24M$20M
Stock pay (reported)$2M$9M$5M$8M$9M$12M$22M$14M$17M$17M$21M
Owner cash flow (calculated)−$33M−$182M$107M−$48M$36M$39M−$33M$59M$108M−$43M−$203M
Shares at year end, millions (reported)52.683.0100.2100.6100.9103.4114.5109.5103.0104.3122.9
Depreciation for 2023 was restated upward by $38.7M in the 2025 filing, with an equal cut to the loss on disposal; operating income did not change. Source 10-Ks 2017 to 2025; 10-Q Q3 2026; XBRL [12][4][13][14][15][5][2][6]. Figures as reported or calculated from reported data.

What an owner could really take out

Almost nothing, and for ten years. Add up operating cash flow minus capital spending plus asset sales minus stock pay and the 2016 to 2025 total is about $11M (calculated).6 The figure was positive in five years of ten, 2018, 2020, 2021, 2023 and 2024, and negative in the other five. In 2019, the best year for earnings, the company spent $503M on equipment and owner cash was −$48M.4 The reason is that a pumping fleet wears out. The company wrote off $58M to $107M of equipment in each year from 2018 to 2022 as losses on disposal, and Adjusted EBITDA adds those back.415 Replacing worn components is a real cost that the metric hides.

The latest twelve months are worse because the power programme is under construction. Operating cash flow was $196M, capital spending incurred $398M, asset sales $20M and stock pay $21M, so owner cash flow was −$203M (calculated).623 Capital spending incurred was $99M higher than what the company paid in cash over nine months, $76M of it because the lender pays the engine maker directly; that is real spending.3

Net income against the cash an owner could take

US$ millions. Owner cash flow is operating cash flow less capital spending plus asset sales less stock pay.

  • Net income, TTM $2M
  • Owner cash flow, TTM −$203M
Net income against the cash an owner could takeNet income and owner cash flow by year. Over 2016 to 2025 net income totalled $86M and owner cash flow $11M. Twelve months to September 2026: net income $2M, owner cash flow −$203M.−$200M−$100M$0$100M$200M’16’18’20’22’24TTMNet income, 2016: −$53MNet income, 2017: $13MNet income, 2018: $174MNet income, 2019: $163MNet income, 2020: −$107MNet income, 2021: −$54MNet income, 2022: $2MNet income, 2023: $86MNet income, 2024: −$138MNet income, 2025: $1MNet income, TTM Sep 2026: $2MOwner cash flow, 2016: −$33MOwner cash flow, 2017: −$182MOwner cash flow, 2018: $107MOwner cash flow, 2019: −$48MOwner cash flow, 2020: $36MOwner cash flow, 2021: $39MOwner cash flow, 2022: −$33MOwner cash flow, 2023: $59MOwner cash flow, 2024: $108MOwner cash flow, 2025: −$43MOwner cash flow, TTM Sep 2026: −$203MNet income against the cash an owner could takeNet income and owner cash flow by year. Over 2016 to 2025 net income totalled $86M and owner cash flow $11M. Twelve months to September 2026: net income $2M, owner cash flow −$203M.−$200M−$100M$0$100M$200M’16’17’18’19’20’21’22’23’24’25TTMNet income, 2016: −$53MNet income, 2017: $13MNet income, 2018: $174MNet income, 2019: $163MNet income, 2020: −$107MNet income, 2021: −$54MNet income, 2022: $2MNet income, 2023: $86MNet income, 2024: −$138MNet income, 2025: $1MNet income, TTM Sep 2026: $2MOwner cash flow, 2016: −$33MOwner cash flow, 2017: −$182MOwner cash flow, 2018: $107MOwner cash flow, 2019: −$48MOwner cash flow, 2020: $36MOwner cash flow, 2021: $39MOwner cash flow, 2022: −$33MOwner cash flow, 2023: $59MOwner cash flow, 2024: $108MOwner cash flow, 2025: −$43MOwner cash flow, TTM Sep 2026: −$203MNet income against the cash an owner could takeNet income and owner cash flow by year. Over 2016 to 2025 net income totalled $86M and owner cash flow $11M. Twelve months to September 2026: net income $2M, owner cash flow −$203M.−$200M−$100M$0$100M$200M’16’17’18’19’20’21’22’23’24’25TTMNet income, 2016: −$53MNet income, 2017: $13MNet income, 2018: $174MNet income, 2019: $163MNet income, 2020: −$107MNet income, 2021: −$54MNet income, 2022: $2MNet income, 2023: $86MNet income, 2024: −$138MNet income, 2025: $1MNet income, TTM Sep 2026: $2MOwner cash flow, 2016: −$33MOwner cash flow, 2017: −$182MOwner cash flow, 2018: $107MOwner cash flow, 2019: −$48MOwner cash flow, 2020: $36MOwner cash flow, 2021: $39MOwner cash flow, 2022: −$33MOwner cash flow, 2023: $59MOwner cash flow, 2024: $108MOwner cash flow, 2025: −$43MOwner cash flow, TTM Sep 2026: −$203M
Capital spending is the amount paid to 2022 and the amount incurred from 2023, which counts equipment paid for by the lender. TTM uses incurred. Source 10-Ks; XBRL; 10-Q Q3 2026; Q3 2026 release [6][5][2][3]. Calculated.

Quality of earnings

Two adjustments matter. Adjusted EBITDA adds back $21M a year of stock pay, which I deduct. It is struck after the $63M of electric-fleet rent, which makes it a conservative number until the fleets are bought.3 Working capital is the other drag: receivables rose by $89M in nine months to $290M, about 74 days of sales.3 Operating cash flow was $115M in nine months against $151M a year earlier.3

Completions earnings were hurt in the second and third quarters by costs the company chose to incur: standing up a twelfth and then a thirteenth fleet, hiring crews, restocking parts. The company says those costs will fall in 2027, and that fourth-quarter results will be seasonally soft.168 Q4 2025's Adjusted EBITDA was $51M on $290M of revenue, 17.6%, and I assume the fourth quarter of 2026 is near $42M for completions (estimate).35

The balance sheet

At 30 September the company held $729M of cash against $862M of debt at face value, net debt of $135M (calculated).3 It had $1,009M of equipment net of depreciation, up from $793M at the end of 2025.3 The cash is not free: remaining equipment commitments were $633M at 30 September, $463M of it Caterpillar's, and the company added a $53M battery order in October.2 The company says its raised funds "largely" cover PROPWR's near-term needs.8 The next table lists what is owed and what is promised.

What is owed and what is promised

Face amounts at 30 September 2026 unless stated.

What is owed and what is promised
AmountRateDueNote
Convertible notes (reported)$690M0.00%15 Nov 2031Convert at $23.17; capped call to $29.49; redeemable from May 2029 if the shares are 30% above the conversion price
Caterpillar equipment loans (reported)$171.8M drawn; $19.9M free7.73% weighted average, fixed on conversion to termFive years from each drawSecured on the equipment; $24.7M syndicated without recourse
Revolving credit facility (reported)Nothing drawn; $185M freeSOFR plus 1.5% to 2.0%May 2031Borrowing base $196M; springing fixed-charge test
Stonebriar lease line (reported)Nothing used; up to $350MSOFR plus 6.25% while interimFacility to Dec 202884-month leases; may fund power equipment
Caterpillar framework (reported)$463M left on 570 MW on order–Deliveries Q4 2026 to late 2028Minimum purchase about $1.1B; 75% shortfall fee on missed orders
Other equipment orders (reported)$169.8M left–Q4 2026 to 2027Other manufacturers
Battery order (reported)About $53.4M–Second half of 2027Placed in October 2026
Electric fleet leases (reported)$49.5M of operating lease liabilities, all leases–Remaining lease terms about 2 yearsBuyout of one fleet for $15M to $20M expected in Q4 2026
The $690M convertible carries no cash interest, but it is a $690M repayment on 15 November 2031 unless the shares are above $23.17 by then. Source 10-Q Q3 2026, Notes 5, 11, 13, 15; 8-Ks [2][22][24][23]. Figures as reported.

The Caterpillar contract deserves a careful read. PROPWR must place orders at least 15 months before delivery, up to minimum amounts set for each year, and if it falls short it pays a fee that the 8-K puts at 75% of the price of the equipment not bought (the exhibit blanks the rate, so the 75% rests on the 8-K alone). Caterpillar has to show the shortfall was not its own failure to deliver or a force majeure event.924 If Caterpillar resells the engines within 12 months, PROPWR gets a credit equal to the fee less 15%, usable on future Cat engine orders, not cash.9 PROPWR can end the agreement for convenience, but it still owes the minimums for a notice period that the filing redacts.9 The minimums for 2029 to 2031 reset to a percentage of forecast demand on 31 December of 2027, 2028 and 2029, so they follow a forecast the company supplies.9 I cannot see the yearly minimums or how much of the $1.1B is already ordered. I know that 570 MW is on order with $463M left to pay, and that the full framework is about 1.5 GW plus an option, so a large part is still to be ordered or paid for by deadlines I cannot see. That is the bear case's main input.

The share price since the 2017 listing

Quarter-end closing price, US$

  • Close, 30 October 2026 $7.73
The share price since the 2017 listingQuarter-end closes from $12.89 at March 2017 to $7.73. The lowest close was $1.51 on 18 March 2020 and the highest $24.66 on 22 April 2019. The shares were $10.75 when the company sold 17.25M of them in January 2026, $16.85 when it sold the convertible in May 2026 and $7.73 on 30 October 2026.$0$10$20$30’17’18’19’20’21’22’23’24’25’26The share price since the 2017 listingQuarter-end closes from $12.89 at March 2017 to $7.73. The lowest close was $1.51 on 18 March 2020 and the highest $24.66 on 22 April 2019. The shares were $10.75 when the company sold 17.25M of them in January 2026, $16.85 when it sold the convertible in May 2026 and $7.73 on 30 October 2026.$0$10$20$30’17’18’19’20’21’22’23’24’25’26The share price since the 2017 listingQuarter-end closes from $12.89 at March 2017 to $7.73. The lowest close was $1.51 on 18 March 2020 and the highest $24.66 on 22 April 2019. The shares were $10.75 when the company sold 17.25M of them in January 2026, $16.85 when it sold the convertible in May 2026 and $7.73 on 30 October 2026.$0$10$20$30’17’18’19’20’21’22’23’24’25’26
The shares closed below $8 at some point in every year from 2019 to 2026 and have not closed above $25. The 2026 rally to $18.20 on 29 April has been given back. ExxonMobil sold its 16.6M shares at $16.66 in May. Source Nasdaq historical [1]. Quarter-end closes; the last point is 30 October 2026.

Valuation

First, how this goes wrong

Before any number, I ask what would most likely hurt an owner, and work back. I see three ways, and they can arrive together.

Pumping falls while the power money is spent. The company has committed about $1.15B of power spending between now and 2028 whatever the oil price does. Completions revenue fell 61% between 2019 and 2020 and 22% from 2023 to 2025, and the stock reached $1.51 in March 2020.41 If a downturn arrives in 2028, the same year spending peaks, there is no cushion from the pumping side. The power contracts do not arrive. Only 510 MW of 1,100 MW on order is signed, 60 MW of it with a data centre, and 70 MW of earlier contracts have already lapsed.718 Unsigned engines are paid for, or carry a 75% fee, and resale is not guaranteed.24 The money costs too much. The company must find roughly $0.4B more in my base and $0.6B in my bull, and the $690M convertible falls due in November 2031 unless it converts.22 If the shares are cheap when it needs equity, existing owners pay.

What an owner can really take out

Reported earnings and owner cash are far apart here. Over the twelve months to September, net income was $2M and Adjusted EBITDA $192M, but after paying for equipment and counting stock pay as a cost, owners were $203M worse off (calculated).623 Looking forward, my base has owner cash of $-498M in 2027 and $-315M in 2028 as the build is paid for, turning to +$211M in 2029 and about $271M a year from 2032 on 586M of EBITDA, so about 46 cents of each dollar of EBITDA reaches owners (estimate). The rest goes to stock pay, replacing worn equipment, upkeep on the engines and tax.

What I cannot judge

Four inputs are not knowable from here, and I show a range and not a figure. First, what a megawatt really earns: one quarter of segment results exists, at about $170k a megawatt a year on my guess of the fleet running, against a target of $230k to $375k. Second, whether the data-centre talks produce signed contracts, since 60 MW is the only one in a year. Third, what engines fetch if they are not deployed, which depends on a power shortage that may or may not last. Fourth, how fracturing prices reset when most horsepower renews in the first half of 2027. I would not trust any one-number answer, including mine. The table of cases below is the honest form of the answer.

The discount rate

The ten-year Treasury yield was 4.94% on the price date and Damodaran's implied equity risk premium 4.20%.2627 ProPetro's beta on month-end returns against the S&P 500 is 0.66 over three years, 0.85 over five and 1.96 since 2017, which gives a cost of equity of 7.7% to 13.2% (calculated).128 A range that wide tells me the measure is unreliable, and I do not let the 3-year figure set a rate near 8% for a levered oilfield business building a new line. The convertible is a 0% coupon, the Caterpillar loans cost 7.73%, and the lease line SOFR plus 6.25%.223 I use 11% for the business as a whole, which matches a beta near 1.45, between the five-year and since-listing figures, and show 9% to 13%. Cash flows are in nominal dollars.

The three cases

I model the business as two parts on one balance sheet. Completions revenue and margin are set from the company's own history; power is modelled by cohort, megawatts running times what each earns, less upkeep, with the $1.4M to $1.5M a megawatt capital cost, the 1,100 MW already ordered following the known commitment schedule, and any extra megawatts costing the same. Cash tax uses 24%, 100% expensing of new power equipment, and a loss pool. Each year's owner cash is after stock pay, sustaining capital, growth capital and tax.

Bear, base and bull cases

Value per share on the diluted count of 124.9M. US dollars; M means millions.

Bear, base and bull cases
BearBaseBull
Completions revenue, 2028 (estimate)$1.10B$1.34B$1.45B
Completions margin 2028, before lease savings (estimate)14%18%22%
Power running at year end 2028, MW (estimate)480640800
Power running at year end 2032, MW (estimate)6501,1002,600
EBITDA a megawatt a year at maturity (estimate)$225k$270k$320k
Payback on $1.4M to $1.5M a megawatt (estimate)6.7 years5.4 years4.4 years
Price a megawatt after the first contract, share of today’s (estimate)70%80%95%
Consolidated Adjusted EBITDA, 2028 (estimate)$253M$392M$537M
Consolidated Adjusted EBITDA, 2031 (estimate)$372M$586M$999M
Power spending still to come, Q4 2026 to 2028 (estimate)$939M$1.15B$1.25B
Peak net debt (estimate)$1.02B$1.16B$1.36B
New money needed beyond today’s debt (estimate)$260M$392M$597M
Value of the business today (estimate)$199M$864M$2.51B
Net debt at 30 September 2026 (estimate)$135M$135M$135M
Shares, millions (estimate)124.9124.9124.9
Value per share (estimate)$0.52$5.84$19.03
Return a year at the price (estimate)−0.5%11.5%23.6%
The model bear value is $0.52. Everywhere else on this page, values are rounded to the nearest dollar, so it shows as $1; shares cannot be worth less than nothing. Source Model [2][3][8][9]. Estimates.
Bear
Completions goes back to a trough like 2020 and 2021: revenue falls to $1.1B and the margin before lease savings to 13.5% in 2028 and 2029. Only 650 MW of power is ever running, at $225k a megawatt, and the first contracts re-let at 70% of today's price. About 450 MW of engines already bought are sold in 2029 at 75% of an engine cost I put near $1.0M a megawatt and $60M of Caterpillar shortfall fees are paid. The business is worth about $199M, barely more than the net debt, so a share is worth $0.52.
Base
Completions earns a margin of 17% to 17.5% on $1.3B of revenue, below the 2022 to 2024 average, and the electric fleets are bought out. The 1,100 MW of equipment already delivered or on order is all contracted and running by 2030, at $270k a megawatt, a payback of 5.4 years, and re-lets at 80% of the first price. The programme earns its cost of capital and no more. A share is worth $5.84.
Bull
Completions repeats 2023: a margin of 22.5% on $1.5B. The whole 2.6 GW is signed and running by 2032 at $320k a megawatt, a payback under 4.4 years, with contracts that last and re-let at 95%. Peak net debt is $1.4B in 2030. The convertible stays debt because the value stays below $23.17. A share is worth $19.03.

The base path

Selected years. Net debt includes the convertible at face value.

The base path
2027202820292030203120332035
Completions Adjusted EBITDA (estimate)$238M$279M$299M$299M$299M$299M$299M
Power EBITDA, after overhead (estimate)$53M$113M$193M$258M$287M$287M$287M
Average megawatts earning (estimate)3245207801,0101,1001,1001,100
Completions capital (estimate)$154M$196M$160M$143M$143M$143M$143M
Power growth capital (estimate)$560M$420M$0M$0M$0M$0M$0M
Power upkeep (estimate)$14M$23M$34M$44M$48M$48M$48M
Cash tax (estimate)$0M$0M$15M$19M$68M$101M$101M
Owner cash, before interest (estimate)−$498M−$315M$211M$290M$287M$271M$271M
Net debt at year end (estimate)$827M$1.16B$976M$708M$428M−$79M−$200M
Owner cash is negative in 2027 and 2028, when the engines on order are paid for. Source Model [2][3][8][9]. Estimates.

Adjusted EBITDA in my three cases

US$ millions a year; bear to bull, with the base marked

  • Bear to bull, 2033 $369M to $1,233M
  • Base, 2033 $586M
Adjusted EBITDA in my three casesConsolidated Adjusted EBITDA, company definition before stock pay, including lease savings. TTM $192M. Base reaches $492M in 2030 and $586M in 2033; bear $369M; bull $1,233M.$0$400M$800M$1.2B’26’27’28’29’30’31’32’33Adjusted EBITDA in my three casesConsolidated Adjusted EBITDA, company definition before stock pay, including lease savings. TTM $192M. Base reaches $492M in 2030 and $586M in 2033; bear $369M; bull $1,233M.$0$400M$800M$1.2B’26’27’28’29’30’31’32’33Adjusted EBITDA in my three casesConsolidated Adjusted EBITDA, company definition before stock pay, including lease savings. TTM $192M. Base reaches $492M in 2030 and $586M in 2033; bear $369M; bull $1,233M.$0$400M$800M$1.2B’26’27’28’29’30’31’32’33
2026 is the twelve months to September, shown as the starting point. The step in 2027 to 2030 is the power fleet and the rent saved as electric fleets are bought out. Source Model [2][3][8]. Estimates.

Net debt through the build

US$ millions at year end; bear to bull, with the base marked

  • Bear to bull range
  • Base peak $1,155M
Net debt through the buildNet debt at year end in my cases, face value, after the build is paid for. Base peaks at $1,155M in 2028; bear peaks at $1,024M; bull at $1,361M in 2030. At 30 September 2026 it was $135M.−$200M$0$500M$1B$1.5B’26’27’28’29’30’31’32’33Net debt through the buildNet debt at year end in my cases, face value, after the build is paid for. Base peaks at $1,155M in 2028; bear peaks at $1,024M; bull at $1,361M in 2030. At 30 September 2026 it was $135M.−$200M$0$500M$1B$1.5B’26’27’28’29’30’31’32’33Net debt through the buildNet debt at year end in my cases, face value, after the build is paid for. Base peaks at $1,155M in 2028; bear peaks at $1,024M; bull at $1,361M in 2030. At 30 September 2026 it was $135M.−$200M$0$500M$1B$1.5B’26’27’28’29’30’31’32’33
Cash of $729M at 30 September is spent in the first two years. Net debt counts the $690M convertible at face value. Source Model [2]. Estimates.

The funding need is the number I trust least. At 30 September the company had $729M of cash, and my base spends $202M of it in the fourth quarter and $0.8B more in 2027 and 2028. Net debt peaks at $1.16B in 2028, about 3 times that year's EBITDA, and takes new borrowing or equity of about $392M beyond today's debt. The revolver ($185M free), the Caterpillar loans ($20M) and the Stonebriar line ($350M) add up to $555M of room, so the base can in principle be debt-funded.2 The bull needs $597M. In the bear I assume the company funds about $260M, but a bear is when it would not be easy to find.

If the $392M had to come from shares, the answer depends on the price. Sold at $7.73 it adds value to the existing holders ($6.39 instead of $5.84) because the shares are above my base; sold at $5 it takes the base to $5.52, and at $3.50 to $4.74 (estimate). The company sold 17.25M shares at $10.00 in January and bought back 13.0M at an average of $8.53 in 2023 and 2024.2115 I think it will avoid issuing below its own view of value, and I do not think it can always avoid it.

What the price says

Turn it round. At $7.73 the market values the shares at about $965M and the business at $1.10B with net debt (calculated). My base is $864M after taking out $1.15B of power spending still to come. Something has to fill a gap of $236M.

What the price needs

Reverse discounted cash flow at my rates.

Reverse discounted cash flow
Market value on the diluted share count (calculated)$965M: $7.73 on 124.9M shares
Net debt at 30 September 2026 (calculated)$135M
Enterprise value at the price (calculated)$1.10B
My base value of the business, after $1.15B of power spending still to come (estimate)$864M
The gap (calculated)$236M
What closes it: more earned on each megawatt (calculated)$316k a megawatt a year, 17% above my base, a payback of 4.6 years
Or: a higher completions margin (calculated)2.5 points more, every year, than my 17% to 17.5% before lease savings
Source Nasdaq; model [1][2]. Calculated and estimated.

The simplest reading: the market expects each megawatt to earn about $316k a year, a payback of 4.6 years, which is inside management's four to six year range and in the better half of it. That is not an absurd ask. It is one that a single quarter of data cannot confirm. Notice what it does not need: a 2.6 GW fleet.

How much the answers move

Base value by earnings a megawatt

Value per share, my base case with only this input changed.

Base value by earnings a megawatt
EBITDA a megawatt a yearPayback on $1.45MBase value per share
$215k (estimate)6.7 years$3.61
$240k (estimate)6.0 years$4.62
$270k. my base (estimate)5.4 years$5.84
$300k (estimate)4.8 years$7.06
$330k (estimate)4.4 years$8.28
$360k (estimate)4.0 years$9.49
Each $30k a megawatt moves the base by about $1.22 a share. Source Model. Estimates.

Value by discount rate

Value per share, my three cases.

Value by discount rate
Discount rateBearBaseBull
9% (estimate)$1.60$8.54$26.78
10% (estimate)$1.03$7.10$22.59
11%, my rate (estimate)$0.52$5.84$19.03
12% (estimate)$0.06$4.75$15.99
13% (estimate)$0.00$3.79$13.39
The base is below the price at every rate shown except 9%. Source Model [26][27][28]. Estimates.

Base value by megawatts running

Value per share if the fleet is smaller or larger than the equipment on order.

Base value by megawatts running
Megawatts running from 2032Base value per share
500 MW, 600 MW of ordered engines resold at 75% (estimate)$4.11
800 MW, 300 MW resold (estimate)$5.10
1,100 MW, the equipment already on order. My base (estimate)$5.84
2,600 MW, the full framework, at my base returns (estimate)$5.48
At my base returns more megawatts add almost nothing, because they earn about what they cost. Source Model. Estimates.

Where the base value comes from

Value per share, my base case, in three steps.

Where the base value comes from
Per share
Completions alone, after all upkeep, stock pay and tax (estimate)$4.36
Plus the 262 MW expected running at the end of 2026 (estimate)+$2.92
Plus finishing the programme to 1,100 MW, with $10M a year of overhead (estimate)−$1.44
Base value (estimate)$5.84
Completions alone, with nothing else, is worth $4.36 in my model, which is 56% of the price. This split is derived from my model, not reported by the company, and it moves with my completions margin. Source Model. Estimates.

Two surprises. A smaller fleet is worth less, not more, because the equipment is already on order. And a much bigger one is worth about the same, because at a 5.4 year payback each additional megawatt earns about its cost of capital. Value comes from returns above the cost of capital, and the whole question is whether the realised payback lands near four years or near six. At four years the base would be about $9.50 a share; at six years, $4.60; at 6.7 years, $3.60.

The margin of safety

I set it at $3. That is 60% of my base value of $5.84, which is $3.50, rounded down to the whole dollar, so it sits at 51% of base. The usual rule, bear value divided by 0.75, is useless here because the bear is about $0.52. I chose a level where the base could be about half wrong, which on this page is a modest allowance given the table above. The shares last closed at $3.50 or less in 2020.1 The zone is below $3.

What it is worth, against the price

Value per share, my estimates, against the close in Q4 2026

  • Bear to bull $1 to $19
  • Base $6
  • Price $7.73
  • Margin of safety below $3
What it is worth, against the priceValue per share: bear $1, base $6, bull $19. Price in Q4 2026: $7.73, 32% above the base value and 59% below the bull. Margin-of-safety price $3.BEAR$1BASE$6BULL$19Price $7.73What it is worth, against the priceValue per share: bear $1, base $6, bull $19. Price in Q4 2026: $7.73, 32% above the base value and 59% below the bull. Margin-of-safety price $3.BEAR$1BASE$6BULL$19Price $7.73What it is worth, against the priceValue per share: bear $1, base $6, bull $19. Price in Q4 2026: $7.73, 32% above the base value and 59% below the bull. Margin-of-safety price $3.Margin-of-safety zone: below $3$0$5$10$15$20$25Bear to bull: $1 to $19Bear case: $1 per shareBEAR$1Base case: $6 per shareBASE$6Bull case: $19 per shareBULL$19Price in Q4 2026: $7.73Price $7.73Close, Q4 2026
The weighted value, 25% bear, 50% base and 25% bull, is $8. Source Nasdaq historical; model in this page’s method [1]. Values are my estimates.

The price against the range

The price is 32% above my base and 59% below my bull. At $7.73 my base cash flows return 11.5% a year to the end of 2036, the bull 23.6% and the bear −0.5% (estimate). Weighting the cases 25%, 50% and 25% gives $7.81, about the price. The skew explains it: the bull is $19 and the bear is about $0.52, and the price is a bet that the megawatts come. The market may be right and I may be wrong.

The 11.5% base return needs one caution. It is the return to the shareholder after the debt is paid, and the debt here is cheap: the convertible carries no coupon until 2031. A shareholder of a business that will carry about $1.2B of net debt on $0.4B of EBITDA would want more than the 11% I use for the business as a whole, so I do not read 11.5% as clearing the bar.

Against the alternative

Every dollar here could go elsewhere. A ten-year Treasury pays 4.94%.26 My base return here is 11.5%. The nearest comparison on this site is Constellation Energy, which owns long-lived power plants that data centres also want, whose price sits 20% above my base value and whose base return is 7.7% a year; and GE Vernova, which builds the turbines, at 5.8%. ProPetro's 11.5% is higher on paper, and that is expected: it is a small company with a single hyperscaler contract, most of its capital still to be spent and a share price that has halved in six months. A higher base return from a riskier business is not a better deal.

Quality and price, separately

How good is the business? The pumping side is ordinary: it makes money at the top of a cycle and loses it at the bottom. The power side is promising and unproven, with a good counterparty in Targa, one running site and a payback that sounds high but earns about the cost of capital once upkeep, tax and a finite life are counted. How good is the price? It is above my base by 32% and on my numbers that leaves no cushion. A fair-to-ordinary business at a price above my estimate of its value leaves the buyer relying on the bull case, and I would put this one in that group, without calling my base certain.

How the odds multiply

The case for the price needs several things to go right at once. My guesses are in the table. They are not independent, since a company that signs data-centre contracts also finds capital more easily, so the true chance is higher than the product. Even so, four 55% to 60% steps leave about 12% for all of them.

How the odds multiply

Each step is my estimate; the product assumes they are independent.

How the odds multiply
StepMy odds
Another 600 MW or so is signed by the end of 2028, taking contracts from 510 MW to 1,100 MW (estimate)60%
The megawatts earn at least $270k each a year once running, a payback of about 5.4 years (estimate)55%
Completions holds a margin of 17.5% before lease savings through the next downturn (estimate)60%
The money is found without issuing shares well below value (estimate)60%
All four together (calculated)12%
Roughly one in eight for all four to come true, and the price already needs a little more than the base. Source My estimates.

Where this could be in 5 and 10 years

Here is my model's value at two later dates. Each is the value at that date of the owner cash that comes after it, less the net debt I roll forward, per today's 124.9M shares and in that year's dollars (estimate). Owner cash paid out counts whatever net cash exceeds $200M, which I assume is distributed; before that the cash repays debt, including the convertible in 2031.

Where this could be in 5 and 10 years

Value per share, my estimates, not forecasts of the share price.

Where this could be in 5 and 10 years
Value, end 2031Value, end 2036Cash paid out, to 2036Return a year
Bear (estimate)$4.40$6.74$0.58−0.5%
Base (estimate)$13.87$16.54$5.6311.5%
Bull (estimate)$37.27$49.93$11.9023.6%
Return a year counts the price of $7.73, the cash paid out, and the value at the end of 2036. Source Model [2][3]. Estimates.

For the base to be right at five years, three things must happen: 1,100 MW is signed and running by 2030, completions keeps a 17.5% margin before lease savings, and net debt peaks near $1.2B in 2028 and falls below $0.5B by 2031. At ten years it also needs the power contracts to re-let at 80% of today's price and the engines to run through 2036. The base value is higher than today's mostly because the $1.15B of spending is behind it and the cash flows are in front. The most likely way the base is wrong is that each megawatt earns $215k rather than $270k, which takes the value today to $3.60. The bear differs from the base in the megawatts signed and in the downturn; the bull in the payback and in the 2.6 GW.

These are estimates of value, not forecasts of the share price. The market price can sit above or below value for years.

The case for the price

What most people miss

Three things are specific and not much discussed. First, the data-centre story rests on one 60 MW contract. In October 2025 the company announced 60 MW for a hyperscaler in the Midwest, and that site has run since June.716 As far as the releases show, the other 450 MW under contract are oil and gas, midstream and industrial, and when Targa signed in September the company said the 510 MW total "also reflects" earlier oil and gas capacity "no longer committed", which is why 350 plus 230 does not make 510.18 Second, rent on the electric fleets is $63M a year and sits inside Adjusted EBITDA. Buying one fleet out costs $15M to $20M and, if the cost is the same for the rest, five buyouts are worth about $63M of EBITDA for about $90M.32 Third, fracturing is sold out. With 13 active fleets, a mid-70s Permian fleet count and most horsepower renewing in the first half of 2027, the company has a repricing coming at a time when it says supply is tight.8 That helps the old business more than the new one gets credit for.

The bull case

In plain words: gas is cheap in the Permian, power is scarce for data centres, ProPetro has engines coming from the one supplier that can deliver them and the oilfield know-how to run them, and its old business is at the bottom of a cycle with a tight market ahead. Sam Sledge, the chief executive, said on 28 October that "Demand for our completion services remains strong and continues to build".3 The company's October presentation illustrates 0.5 GW running at the end of 2027, 1.2 GW in 2029 and 2.6 GW in 2032, and says payback is four to six years.208 If that is met at the low end, my model gives about $9.50 a share.

On the holder side, one fact with its date. Situational Awareness LP, the fund run by Leopold Aschenbrenner, held 1,960,382 shares of ProPetro, valued at $28,111,878, at 30 June 2026, according to its 13F-HR filed on 14 August.29 That is about 1.6% of the shares outstanding now (calculated). A 13F shows long positions in US-listed shares only, not shorts or holdings abroad, and says nothing about what a fund does next, so I draw nothing from it. I found no named sell-side view or published investor model for ProPetro that I could open, so I cite none.

Against reality

Today the company earns $192M of Adjusted EBITDA, 262 MW are expected running by the end of the year, and the power segment made $7.6M in the third quarter.3 If it signs another 600 MW by the end of 2028, completions holds a 17% margin and each megawatt earns what the company targets at its midpoint, my base is possible: $5.84 a share. The price needs more. It needs about $316k a megawatt a year, or 2.5 points more completions margin every year (calculated). That is the distance between today's numbers and the case.

What a 10x would take. Ten times $7.73 is $77.30. By then the convertible would have converted, so there are about 155M shares and a market value of $12.0B. At 8 times Adjusted EBITDA, a generous multiple against the 5.7 times the business trades on now, with no net debt, that needs about $1.5B a year, 21% more than my bull case in 2033, which already has 2.6 GW running at a payback under 4.4 years (calculated). A megawatt would have to earn about $450k a year, a payback of 3.2 years, outside management's range. Seven years from now that is 39% a year. The shares did rise from $1.51 in March 2020 to $18.20 in April 2026, twelve times in six years, but that was from a crisis low.1 The odds multiply to under 1%: I give 30% to the whole framework being signed and running, 15% to a megawatt earning $450k, 35% to the market paying 8 times, and 50% to completions holding a 22% margin. For a company of this size a tenfold needs both a bull case and a rich multiple, and I would not plan on it.

What they have to hit

Six numbers on a fixed schedule. Thresholds come from my base case and agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
Megawatts under contractAbout 510 MW at 30 September3About 1,100 MW by the end of 2028 (estimate)Quarterly release, "PROPWR highlights"; 10-Q MD&A overviewQ4 2026 results, expected late February 2027 (the last were 18 February)
Data-centre contracts60 MW of the 510 MW73At least 400 MW signed by the end of 2027 (estimate)Company 8-Ks, Item 7.01 press releasesWith Q4 2026 results
Power segment Adjusted EBITDA$7.6M in the third quarter3About $20M a quarter by the end of 2027 and $30M in 2028 (estimate)Release, segment table, "Power Generation" columnQ4 2026 release
Completions margin after corporate cost15.6% in the third quarter; 16.4% for twelve months (calculated)3517% to 17.5% before lease savings through 2028 (estimate)Release, segment table: fracturing, wireline and cementing less reconciling items, over revenue excluding powerQ1 2027 results, the first after most horsepower renews
Net debt and liquidityNet debt $135M; liquidity $934M3Net debt no higher than about $1.2B at the 2028 peak, liquidity above $300M (estimate)10-Q, liquidity section; release balance sheetQ4 2026 10-K, expected February 2027
Electric fleet buyoutsNone completed; one expected in Q4 20262Three more in 2027 at $15M to $20M each (estimate)Release, outlook; 10-Q Note 15Q4 2026 release
Source Q3 2026 release and 10-Q; 8-Ks [3][2][7][5]. Thresholds are my estimates. Next-check dates marked expected are inferred from last year’s timing, not announced.

Where I come down

Two things moved me: the company has real operating improvement in front of it in pumping, where repricing and the fleet buyouts are on a timetable, and PROPWR has delivered a hyperscaler site that works. They did not move my numbers to the price, because a five-year-plus payback earns about the cost of capital once upkeep, tax and a finite life are counted, and because the data-centre market is one contract so far. A second data-centre contract of a few hundred megawatts, a power segment earning $30M a quarter, and a payback shown to be nearer four years would raise my values the most. A fresh share sale below $5 would lower them.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • A few customers. The top five customers were 68.2% of 2025 revenue and Exxon 24.9%.5 The Exxon sub-agreement for two electric fleets is expected to end in late 2026 without renewal, and the company has to redeploy the fleets.2
  • Oil price and rig count. WTI averaged about $97 a barrel in September 2026 against about $58 in December 2025, as the Middle East war disrupted supply, and the Permian rig count rose to 270.2 Pumping demand follows both. A reversal would hit the old business while the new one is being built.
  • Engine supply terms. A 75% fee on missed minimums, with only a 15%-haircut credit if Caterpillar resells, is a real liability, and many of the terms are redacted.924
  • Equipment and execution. PROPWR has run for about a year. Engines fail, sites slip and permits take time. In the second quarter an out-of-basin fleet job suffered "significant unexpected downtime".16
  • Contract quality. Oil and gas terms are short, about five years in the January update, and a customer's fall-away of 70 MW already happened once.1718 I cannot see termination rights.
  • Competition and the grid. The 10-K says distributed power competes with grid access and expects significant competition as mobile power develops.5
  • Controls and people. The chief accounting officer leaves on 30 October; the finance chief is interim in that role. The company had material weaknesses in 2019.254
  • Dilution and refinancing. The convertible is $690M due November 2031; the January share sale was at $10.00.2221

Geopolitical risk, and what it means for the value

ProPetro pumps in the Permian and its known power sites are in the United States, with no foreign operations or capital controls of its own. The exposure runs through oil, equipment costs, Permian rules and Caterpillar. For each I changed one thing in my $5.84 base.

Oil. WTI averaged about $97 a barrel in September against about $58 in December, after the war between Israel, Iran and the United States, and the Permian rig count rose to 270.2 The combatants, OPEC+ and sanctions on Russia decide that, not ProPetro. If oil falls back toward $60 and completions drifts to my bear levels, the base is $3.19. I give that about one in three, since $58 was ten months ago. If oil stays high and fleets reprice, it is $10.99.

Tariffs. The 10-K records a 25% US tariff on steel imports from March 2025 and an announced 10% tariff on imports from almost every country, and says power equipment leans on foreign supply chains.5 Caterpillar's price is fixed for shipments to 31 December 2027, then follows a producer price index, and can be adjusted for tariffs.924 So 2028 engines and site equipment are exposed. If equipment costs 10% more and customers do not repay it, the base is $4.23. I give that about one in four: the 10-K says tariff announcements were followed by exemptions and pauses.

Permian rules. The 10-K calls air permits an advantage, warns that rule changes could raise costs, and says regulators in Texas are acting on produced-water disposal and earthquakes, which costs customers.5 A one-year delay on every new megawatt, with engines still paid for, gives $5.28. I give it about one in four.

Gas and power. Customers buy the gas, so ProPetro has no direct gas price risk. Scarce grid power is why anyone rents an engine farm, and the company says gas-burning fleets are sold out on the diesel and gas gap.8 At $300k a megawatt a year the base is $7.06, near the price. I give that about one in three.

Caterpillar. Supply is the edge and the exposure. A one-year slip in deliveries gives $5.56, since cash goes out later too. If only 800 MW is signed, 300 MW of engines are resold at 75% and a $60M fee is paid, it is $4.74, about one in four. The exhibit blanks the fee rate; 75% is from the 8-K.924

In the price: $7.73 needs $316k a megawatt, so it leans to the favourable rows. I do not see a fall in oil, a tariff step or a permit delay in it. The cases overlap; I do not add them.

Geopolitical cases and the base value

My base is $5.84; one input changed at a time.

Geopolitical cases and the base value
CaseWhat changesMy oddsBase value per share
Oil back near $60Completions at my bear levelsAbout 1 in 3$3.19 (estimate)
Oil stays highCompletions at my bull levelsAbout 1 in 4$10.99 (estimate)
Equipment costs 10% morePower and completions capital, not repaidAbout 1 in 4$4.23 (estimate)
Permits slip a yearNew megawatts a year late, engines paidAbout 1 in 4$5.28 (estimate)
Caterpillar slips a yearMegawatts and payments a year lateAbout 1 in 5$5.56 (estimate)
Only 800 MW signed300 MW resold at 75%, $60M feeAbout 1 in 4$4.74 (estimate)
Power earns $300k a MWGrid power stays scarceAbout 1 in 3$7.06 (estimate)
Odds are my judgement, with the basis in the text; they are not model outputs. Source Model; 10-K and 10-Q risk factors; framework agreement [5][2][9][24]. Estimates.

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Megawatts under contractAbout 510 MW3Above 800 MW by the end of 2027Below 510 MW, or another lapse
Data-centre contracts60 MW7A second contract above 100 MWNo new data-centre signing by mid-2027
Power earnings a megawattAbout $170k a year on my guess (estimate)Above $300k once runningBelow $215k
CompletionsMargin 15.6% in Q33Above 19% before lease savings after the 2027 renewalsBelow 14% in 2027
Net debt$135M3Peak below $1.0BAbove $1.5B, or shares sold below $5
Caterpillar minimums75% fee on shortfalls24Orders cut to match contracts with no feeA fee paid
Source Q3 2026 release; framework agreement [3][7][24]. Thresholds are my judgement.

ProPetro short reports: Culper Research, 2019

Who and what. Culper Research is a short seller. Its 2019 reports say it is short ProPetro, so it may profit if the price falls.30 It published three: “Friends & Family First at this Permian Cesspool” (31 October 2019), “There’s No Fracking in Cabo” (4 November) and “Q3 Disclosures Cast Further Doubt on Internal Review” (14 November).303132

What it alleges. The first report says the company’s 9 October claim that its review was substantially complete was not credible (p. 2). It cites management’s role in the review, the audit committee’s independence, and at least nine undisclosed outside entities tied to executives, staff and board members (pp. 2 to 5). It also calls the company a restructuring story and says the shares are “ultimately worthless” (pp. 2 and 17).30 The second lists 59 private-jet trips it could not easily explain as business (p. 3).31 The third says a $3.6M related-party item disclosed on 13 November shows the review fell short (p. 2).32

The company’s response. I found no reply from ProPetro to Culper by name, and no filing I read mentions it. Culper says Bloomberg got no comment (second report, p. 2).31 On 9 October the company said fact-finding was substantially complete and nothing found so far required a restatement.33 On 13 November it disclosed one related-party transaction it had not reported, about $3.6M paid, linked to its former chief accounting officer, and at least two material weaknesses.34

What is established. The company’s review, reported in its 2019 10-K of 22 June 2020, found about $370,000 of managers’ expenses wrongly charged to the company and later repaid, one undisclosed related-party transaction, and control failures, including that it “did not appropriately identify and monitor conflicts of interest.” It found no material accounting error and no restatement. On 13 November 2019 the company also told investors not to rely on its 2018 report that controls were effective.434 On 22 November 2021 the SEC settled with the company and its former chief executive, who both agreed to cease-and-desist orders without admitting or denying. The order finds proxy statements filed in 2018 and 2019 understated his perks for 2017 and 2018 by $142,570 and $285,615 and left out two pledges of his shares, and that the company violated reporting, books-and-records, internal-controls and proxy rules. It imposes no penalty on the company, citing its cooperation; he agreed to pay $195,046.3637 Neither the release nor the order mentions Culper.

What is not established. No court or regulator has ruled on whether the review was independent. The order says the audit committee’s outside counsel uncovered the improper reimbursements and the pledges (paragraph 30). It finds the company paid about $252,896 for the former chief executive’s personal flights in 2017 and 2018; it does not test Culper’s 59 trips.37 The class action’s third amended complaint (30 July 2020) lists Culper’s first report among the events behind alleged price falls; the settlement carried no finding of fault.4342

Culper’s claims and where they stand

The first four rows are Culper’s claims. The last three are the class action and later facts. The status column is what filings, courts and the SEC have said.

Culper’s claims and where they stand
Claim or caseCompany responseStatusWhere to track
The internal review was not independent (31 Oct, 14 Nov 2019)Forms 8-K of 9 Oct and 13 Nov 2019: substantially complete, then one more related-party item3334No court or regulator has ruled on it. The company’s review found control failures and no restatement410-K, Item 9A
Undisclosed outside entities tied to staff (31 Oct, pp. 2 to 3)No reply foundThe company disclosed one previously unreported related-party deal on 13 Nov 2019; Culper says it had flagged it. The other entities are not named in the 2019 10-K3432410-K related-party note; proxy statement
Private-jet trips (4 Nov, p. 3)No reply foundSEC order, 22 Nov 2021: perks, including personal flights, went undisclosed in 2017 and 2018; cease-and-desist, no penalty on the company; the 59 trips were not tested37SEC matter ended in 2021. Perks table in the proxy statement
Shares “ultimately worthless”; restructuring ahead (31 Oct, pp. 3 and 17)Lender waiver in March 2020; revolver repaid in 202038No restructuring so far. Closes: $7.75 on 31 Oct 2019, $1.51 on 18 Mar 2020, $7.73 on 30 Oct 2026; the 2020 10-K ties the slump to the pandemic and oil price. A price proves neither side413810-Q, liquidity
Class action Logan v. ProPetro (later Nykredit Portefølje Administration A/S v. ProPetro), W.D. Tex., No. MO:7:19-CV-00217-DC, filed 16 Sep 2019, before Culper’s first report$30.0M settlement, paid by insurers, no admission of fault40Motions to dismiss partly denied on 13 Sep 2021; a derivative suit was dismissed without prejudice on 15 Sep 2021; final approval and dismissal with prejudice on 11 May 2023394214Closed. 10-Q, legal matters2
People and controls since 2019Chief executive left on 13 Mar 2020; new directors, a disclosure committee, new expense and travel controls3537. Three of the eight directors on the June 2020 board are 2026 nominees410Auditor’s internal-control opinion: adverse for 2019 and for 2023 (manual journal entries); clean for 2020 to 2022 and 2024 and 202543839131415510-K, Item 9A and the auditor’s report
Related-party items in the 2026 proxyDisclosed; the policy sends any deal above $120,000 to the audit committee10$18.8M of 2025 transport costs paid to a vendor that employs a relative of a senior executive; yard rents of about $0.2M a year from an entity part-owned by a director who was not renominated in 2026 and by the chief executive’s father. I know of no allegation that these were improper10Proxy statement, related-party section; 10-K related-party note
Source Culper reports; Forms 8-K; 10-Ks; SEC order; press release of 23 August 2022; court filings [30][31][32][33][34][37][38][4][40][39][42][43][14][10]. Status as of the filings I read.

Where it touches my model. A related-party leak would sit in completions margin, where one point is worth about $0.76 a share (estimate) (reverse DCF) and $13M a year on my $1.34B of revenue (calculated); the SEC’s largest annual perks figure is about 2% of that.37 The other input is the discount rate: my 11% has no governance charge, and one more point takes my base from $5.84 to $4.75 (estimate). The $24.2M of 2019 review fees and the insured settlement are past and not in my cash flows.440 Revenue, share count and capital spending are untouched. I cannot judge from outside whether the other entities mattered.

So what. The SEC and the company’s own review found undisclosed perks and pledges and weak controls in 2017 to 2019, small beside 2018 Adjusted EBITDA of $388M4, so my values do not move. A problem later settled is not a finding about today’s company, and a fixed problem does not show there are no others. For Culper’s view to hold today, related-party dealings of size would have to be hidden and the controls missing them; no court or regulator has tested the other entities, and I cannot from outside. For the company’s account to hold, disclosure and controls must now work; clean audit opinions for 2020 to 2022, 2024 and 2025 point that way, and the 2023 manual-journal-entry weakness shows lapses happen. Culper said in 2019 that it was short and today’s executives are paid partly in stock, so each side has a motive to frame it; the next check is the 2026 10-K, due by mid-March 2027 (the 2025 one came on 19 February).5

Sources

  1. 1PUMP daily closes, Nasdaq.com historical API, 22 March 2017 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Close/Last on 10/30/2026 = $7.73, NYSE; cross-checked against the Yahoo Finance chart feed, also $7.73; lowest close $1.51 on 18 March 2020, highest $24.66 on 22 April 2019; 52-week intraday range $7.01 to $18.50 · Accessed 31 Oct 2026↩︎
  2. 2ProPetro Form 10-Q, quarter ended 30 September 2026 (opens in a new tab)FilingSEC EDGAR · 29 Oct 2026 · Cover share count (122,862,337); balance sheet; Note 5 debt and convertible notes; Note 7 dilution; Note 13 commitments; Note 15 subsequent events; MD&A · Accessed 31 Oct 2026↩︎
  3. 3ProPetro press release, third quarter 2026 results (8-K Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 28 Oct 2026 · Revenue $355M; Adjusted EBITDA $60M; segment tables; capital spending paid $123M and incurred $171M; 2026 capital guidance; PROPWR 510 MW under contract · Accessed 31 Oct 2026↩︎
  4. 4ProPetro Form 10-K, year ended 31 December 2019 (opens in a new tab)FilingSEC EDGAR · 22 Jun 2020 · 2017 to 2019 results; Expanded Audit Committee Review findings; Pioneer acquisition · Accessed 31 Oct 2026↩︎
  5. 5ProPetro Form 10-K, year ended 31 December 2025 (opens in a new tab)FilingSEC EDGAR · 19 Feb 2026 · Items 1, 1A, 7; customers (top five 68.2%, ExxonMobil 24.9%); horsepower; capital spending incurred $281.2M; segment Adjusted EBITDA; FORCE lease terms · Accessed 31 Oct 2026↩︎
  6. 6ProPetro company facts (XBRL), SEC EDGAR (opens in a new tab)DataSEC EDGAR · 30 Oct 2026 · Annual operating cash flow, capital spending, stock pay, asset-sale proceeds, share counts and cash, FY2015 to FY2025 · Accessed 31 Oct 2026↩︎
  7. 7ProPetro press release, 60 MW hyperscaler data center contract (8-K Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 27 Oct 2025 · 60 MW with batteries for a Midwest hyperscaler; deployment from Q2 2026 · Accessed 31 Oct 2026↩︎
  8. 8ProPetro third quarter 2026 earnings call scripted remarks (8-K Exhibit 99.3) (opens in a new tab)FilingSEC EDGAR · 28 Oct 2026 · Payback target of four to six years; $1.4M to $1.5M a megawatt; 13 active fleets; two-thirds of horsepower renews in the first half of 2027; $1.5B raised for PROPWR · Accessed 31 Oct 2026↩︎
  9. 9Global Framework Agreement between PROPWR and Caterpillar Inc., effective 28 April 2026 (10-Q Exhibit 10.1) (opens in a new tab)FilingSEC EDGAR · 30 Jul 2026 · Section 4(c) purchase obligation, orders 15 months ahead, shortfall fee and 15% haircut on any credit; section 7 termination; many terms redacted · Accessed 31 Oct 2026↩︎
  10. 10ProPetro proxy statement (DEF 14A), 2026 annual meeting (opens in a new tab)FilingSEC EDGAR · 8 Apr 2026 · Summary compensation table; bonus metrics including PROPWR committed megawatts; relative-TSR performance units; ownership table at 25 March 2026; pay versus performance · Accessed 31 Oct 2026↩︎
  11. 11Forms 4 filed for ProPetro insiders and ExxonMobil, 29 October 2025 to 30 October 2026 (opens in a new tab)FilingSEC EDGAR · 30 Oct 2026 · No open-market purchases; sales by two directors and the chief operating officer at $10.14 to $11.17; ExxonMobil sale of 16,600,000 shares at $16.66 on 20 May 2026 · Accessed 31 Oct 2026↩︎
  12. 12ProPetro Form 10-K, year ended 31 December 2017 (opens in a new tab)FilingSEC EDGAR · 27 Mar 2018 · 2015 to 2017 results; March 2017 initial public offering · Accessed 31 Oct 2026↩︎
  13. 13ProPetro Form 10-K, year ended 31 December 2022 (opens in a new tab)FilingSEC EDGAR · 23 Feb 2023 · 2020 to 2022 results and Adjusted EBITDA · Accessed 31 Oct 2026↩︎
  14. 14ProPetro Form 10-K, year ended 31 December 2023 (opens in a new tab)FilingSEC EDGAR · 13 Mar 2024 · 2021 to 2023 results; Adjusted EBITDA; insurance reimbursements for the SEC investigation and shareholder litigation; customer shares · Accessed 31 Oct 2026↩︎
  15. 15ProPetro Form 10-K, year ended 31 December 2024 (opens in a new tab)FilingSEC EDGAR · 20 Feb 2025 · 2024 results and 2022 to 2024 Adjusted EBITDA · Accessed 31 Oct 2026↩︎
  16. 16ProPetro press release, second quarter 2026 results (8-K Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 29 Jul 2026 · 350 MW under contract at the end of June; hyperscaler site operating; second-quarter items that cut completions earnings; call remarks (Exhibit 99.3) on the out-of-basin fleet downtime · Accessed 31 Oct 2026↩︎
  17. 17ProPetro Form 8-K, operational update for investors (opens in a new tab)FilingSEC EDGAR · 26 Jan 2026 · About 230 MW committed with weighted average tenor of about five years at commencement; 550 MW delivered or on order · Accessed 31 Oct 2026↩︎
  18. 18ProPetro press release, PROPWR and Targa Resources, about 230 MW (8-K Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 22 Sep 2026 · 230 MW; total 510 MW "also reflects previously announced oil and gas power capacity that is no longer committed under contract" · Accessed 31 Oct 2026↩︎
  19. 19ProPetro Form 10-Q, quarter ended 31 March 2026 (opens in a new tab)FilingSEC EDGAR · 30 Apr 2026 · About 240 MW committed and 550 MW delivered or on order at 31 March 2026 · Accessed 31 Oct 2026↩︎
  20. 20ProPetro investor presentation, October 2026 (8-K Exhibit 99.2) (opens in a new tab)FilingSEC EDGAR · 28 Oct 2026 · Roadmap to about 2.6 GW delivered by year-end 2031 and deployed in 2032; illustrative deployed gigawatts by year; 10 to 15 year targeted contract terms; board and officers · Accessed 31 Oct 2026↩︎
  21. 21ProPetro Form 8-K, public offering of common stock (opens in a new tab)FilingSEC EDGAR · 28 Jan 2026 · 15,000,000 shares at $10.00 priced 27 January 2026; 2.25M option shares later exercised (10-Q Note 12: 17.25M shares, $163.1M net) · Accessed 31 Oct 2026↩︎
  22. 22ProPetro Form 8-K, $690M 0.00% convertible senior notes due 2031 (opens in a new tab)FilingSEC EDGAR · 7 May 2026 · Conversion price about $23.17; capped call to $29.49 at a cost of about $36.8M; maturity 15 November 2031; redemption from 15 May 2029 · Accessed 31 Oct 2026↩︎
  23. 23ProPetro Form 8-K, Stonebriar $350M equipment lease facility and credit agreement amendment (opens in a new tab)FilingSEC EDGAR · 30 Dec 2025 · Up to $350M of power equipment funding, 84-month leases; interim funding at SOFR plus 6.25% · Accessed 31 Oct 2026↩︎
  24. 24ProPetro Form 8-K, Caterpillar framework agreement and first quarter results (opens in a new tab)FilingSEC EDGAR · 30 Apr 2026 · Minimum purchase obligation of about $1.1B; option for about 600 MW to 2031; shortfall fee of 75% with an 85% credit if resold within 12 months · Accessed 31 Oct 2026↩︎
  25. 25ProPetro Form 8-K, resignation of the Chief Accounting Officer (opens in a new tab)FilingSEC EDGAR · 21 Sep 2026 · Resignation effective 30 October 2026; the CFO becomes interim principal accounting officer · Accessed 31 Oct 2026↩︎
  26. 26US Treasury daily par yield curve rates, 2026 (opens in a new tab)DataU.S. Department of the Treasury · 30 Oct 2026 · 10-year 4.94% on 10/30/2026 · Accessed 31 Oct 2026↩︎
  27. 27Damodaran implied equity risk premium, 1 October 2026 (opens in a new tab)ResearchAswath Damodaran, NYU Stern · 1 Oct 2026 · Implied ERP 4.20%; same basis as the other Investing pages · Accessed 31 Oct 2026↩︎
  28. 28S&P 500 index daily close, FRED series SP500 (opens in a new tab)DataFederal Reserve Bank of St. Louis · 28 Oct 2026 · Used with month-end PUMP closes for beta; latest observation 28 October · Accessed 31 Oct 2026↩︎
  29. 29Situational Awareness LP Form 13F-HR, period 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · 1,960,382 shares of ProPetro (CUSIP 74347M108) valued at $28,111,878 at 30 June 2026; the 13F does not show short positions or non-US holdings · Accessed 31 Oct 2026↩︎
  30. 30ProPetro Holding Corp (PUMP): Friends & Family First at this Permian Cesspool (opens in a new tab)Short reportCulper Research · 31 Oct 2019 · 17-page PDF, read in the Internet Archive copy of 3 Nov 2025; Culper’s own file is culperresearch.com/wp-content/uploads/2025/10/Culper_PUMP_10-31-2019.pdf, which blocks automated readers; the report says Culper is short ProPetro and may change its position at any time · Accessed 11 Nov 2026↩︎
  31. 31ProPetro Holding Corp (PUMP): There’s No Fracking in Cabo (opens in a new tab)Short reportCulper Research · 4 Nov 2019 · 6-page PDF, read in the Internet Archive copy of 3 Nov 2025; Culper’s own file is culperresearch.com/wp-content/uploads/2025/10/Culper_PUMP_11-4-2019.pdf; p. 2 quotes Bloomberg and Reuters on the company’s non-response, p. 3 the 59 trips · Accessed 11 Nov 2026↩︎
  32. 32ProPetro Holding Corp (PUMP): Q3 Disclosures Cast Further Doubt on Internal Review (opens in a new tab)Short reportCulper Research · 14 Nov 2019 · 3-page PDF, read in the Internet Archive copy of 3 Nov 2025; Culper’s own file is culperresearch.com/wp-content/uploads/2025/10/Culper_PUMP_11-14-2019.pdf; p. 2 on the $3.6M related-party disclosure · Accessed 11 Nov 2026↩︎
  33. 33ProPetro press release, substantial completion of fact finding for previously disclosed internal review (8-K Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 9 Oct 2019 · “The Audit Committee and management have not identified to date any items that would require restatement”; management appointments; fourth-quarter 2019 fleet outlook of 18 to 20 · Accessed 11 Nov 2026↩︎
  34. 34ProPetro Form 8-K, Audit Committee review update, Logan lawsuit and SEC investigation (opens in a new tab)FilingSEC EDGAR · 13 Nov 2019 · One related-party transaction not previously disclosed, about $3.6M paid in total to the entity; at least two material weaknesses, one at 31 Dec 2018; Logan complaint filed 16 Sep 2019, No. 7:19-CV-217; SEC letter of 24 Oct 2019 · Accessed 11 Nov 2026↩︎
  35. 35ProPetro Form 8-K, executive changes (opens in a new tab)FilingSEC EDGAR · 16 Mar 2020 · Chief executive resigned from the company and the board on 13 Mar 2020; the chairman became chief executive · Accessed 11 Nov 2026↩︎
  36. 36SEC press release 2021-244: SEC Charges Oilfield Services Company and Former CEO With Failing to Disclose Executive Perks and Stock Pledges (opens in a new tab)RegulatorUS Securities and Exchange Commission · 22 Nov 2021 · ProPetro and its former chief executive settled; both agreed to cease-and-desist orders without admitting or denying; $195,046 penalty on the former chief executive; the order notes the company’s cooperation and remedial efforts · Accessed 11 Nov 2026↩︎
  37. 37In the Matter of ProPetro Holding Corp. and Dale Redman, order instituting cease-and-desist proceedings (opens in a new tab)RegulatorUS Securities and Exchange Commission · 22 Nov 2021 · Securities Act Release 11008; Exchange Act Release 93645; Accounting and Auditing Enforcement Release 4268; File No. 3-20661 · Company to cease and desist from Exchange Act sections 13(a), 13(b)(2)(A), 13(b)(2)(B), 14(a) and rules 12b-20, 13a-1, 14a-3, 14a-9; no civil penalty on the company because of its cooperation (section IV.E) · Perks understated by $142,570 (2017) and $285,615 (2018), paragraph 26; personal flights $252,896, paragraph 12; audit committee hired outside counsel in May 2019, paragraph 30 · Findings are by consent and not binding on others · Accessed 11 Nov 2026↩︎
  38. 38ProPetro Form 10-K, year ended 31 December 2020 (opens in a new tab)FilingSEC EDGAR · 5 Mar 2021 · Auditor’s internal-control opinion effective at 31 Dec 2020; March 2020 lender waiver extending the deadline for audited 2019 accounts to 31 Jul 2020; about $130.0M of revolver borrowings repaid in 2020, none outstanding at year end; 2020 demand slump tied to COVID-19 and the oil price · Accessed 11 Nov 2026↩︎
  39. 39ProPetro Form 10-K, year ended 31 December 2021 (opens in a new tab)FilingSEC EDGAR · 25 Feb 2022 · SEC settlement of November 2021 with no monetary penalty and no ongoing undertakings; Logan ruling on motions to dismiss, 13 Sep 2021; derivative suit dismissed without prejudice, 15 Sep 2021; auditor’s internal-control opinion effective · Accessed 11 Nov 2026↩︎
  40. 40ProPetro press release, binding term sheet to resolve the Logan class action (8-K Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 23 Aug 2022 · $30 million settlement, no admission of fault, paid by the company’s directors’ and officers’ insurers; Case No. MO:7:19-CV-00217-DC, Western District of Texas · Accessed 11 Nov 2026↩︎
  41. 41PUMP daily closes, Nasdaq.com historical API: extract for 2019, 2020 and 2026 (same feed as source 1) (opens in a new tab)PriceNasdaq · Close/Last on 10/31/2019 = $7.75; 03/18/2020 = $1.51; 10/30/2026 = $7.73, NYSE · Accessed 11 Nov 2026↩︎
  42. 42Judgment Approving Class Action Settlement, Doc. 177, Nykredit Portefølje Administration A/S v. ProPetro Holding Corp., No. 7:19-cv-00217-DC (opens in a new tab)CourtUS District Court, Western District of Texas, Midland/Odessa Division · 11 May 2023 · Final approval of the settlement, dismissal with prejudice, no admission of fault (paragraph 16); the Stipulation of 22 Sep 2022 (Doc. 168-1) sets the $30,000,000 and has the defendants’ insurers pay it; copy hosted by lead plaintiffs’ counsel; the docket itself is on PACER · Accessed 11 Nov 2026↩︎
  43. 43Third Amended Class Action Complaint, Doc. 81, Nykredit Portefølje Administration A/S v. ProPetro Holding Corp., No. 7:19-cv-00217-DC (opens in a new tab)CourtUS District Court, Western District of Texas · 30 Jul 2020 · Paragraphs 13 and 179 to 187 list Culper’s 31 Oct 2019 report among the events behind alleged price falls; these are the plaintiffs’ allegations, not findings; copy hosted by lead plaintiffs’ counsel · Accessed 11 Nov 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or a growth assumption.

The price

Close in Q4 2026: $7.73, from the NYSE as published by Nasdaq and cross-checked against Yahoo Finance [1]. Retrieved in Q4 2026. The fiscal year is the calendar year. The third-quarter results were published on 28 October, so the latest twelve months are the four quarters to 30 September 2026. Per-share values use 124.9M shares: 122.86M on the cover of the latest 10-Q plus about 2.0M for restricted and performance units, and 29.78M more for the convertible notes when my value is above $23.17.

The valuation

Owner cash from the fourth quarter of 2026 to 2060, discounted at 11% from the price date with each year’s cash in mid-year. Owner cash is Adjusted EBITDA less stock pay ($22M to $26M a year), sustaining capital ($120M to $150M a year for completions, 3.0% a year of cost for the power fleet in the base), growth capital, cash tax at 24% with 100% expensing of new power equipment and a loss pool, and a working-capital charge of 20% of added revenue, before interest. Completions is revenue times a margin before lease savings, plus $12.6M a year of rent for each electric fleet bought out for $17.5M. Power is megawatts running times EBITDA a megawatt ($225k, $270k, $320k), with a ramp factor in 2027 and 2028, a price after the first contract term of 70%, 80% and 95%, a life of 15, 20 and 25 years and a salvage value of 5% to 10%. The 1,100 MW already ordered follow the known commitment schedule; extra megawatts cost $1.40M to $1.50M each. Net debt is $135M at face value: $690M of convertible notes, $171.8M of Caterpillar loans and $1.9M of finance leases, less $728.9M of cash. The values at 5 and 10 years roll that net debt forward at 7.5% on debt above the convertible and 4% on cash, and treat net cash above $200M as paid out. The odds in Section VI are my guesses and are not used in the values, except that the weighted value of $7.81 uses 25%, 50% and 25%.

The margin-of-safety price is $3, which is 60% of base rounded down to the whole dollar. No rating: the page states a range and the price, and leaves the decision to the reader.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.