Investing№ 75Nasdaq: NBIS

Nebius

Nebius rents AI computing capacity to Microsoft, Meta and AI labs, turned $1.36B of revenue into a $6.1B owner cash outflow over the past year, and still has about $36B to find to build what it has contracted.

Updated Fiscal year is the calendar year43 min readPedrum Shokouhi

Thin moat

Research, not investment advice. Figures as of .

Key numbers

  • Revenue$1.36B (calculated)TTM Jun 2026; Q2 up 454% on a year earlier [2][3]
  • Owner cash flow−$6.1B (calculated)TTM Jun 2026, after equipment and stock pay; −$12.0B without customer prepayments [2][3]
  • Contracted revenue$37.5B (reported)Remaining performance obligations at 30 June 2026; 36% due in 24 months [4]
  • Capital spending guide$20B to $25B (reported)2026 guidance, against $8.1B spent in the first half [5][3]
  • Convertible notes$13.5B (calculated)Original principal: $8.5B at 30 June plus $5.75B issued in August, less $0.8B exchanged for shares; $10.0B was due at maturity on 30 June before accretion on the new notes [4][6][7]
  • Votes held by the founder’s trust51.6% (reported)With 11.3% of the shares; Class B carries ten votes [2]

The answer

  1. Nebius rents computing capacity for artificial intelligence, mostly NVIDIA chips in data centres it builds or leases, to AI labs, software companies and Microsoft and Meta; in the twelve months to June 2026 it took in $1.36B of revenue, spent $11.1B on equipment, and had $37.5B of contracted revenue still to come (calculated).234
  2. I value it at $134 a share, in a range of $7 to $408, because the answer rests on one number I cannot know, the long-run income on each new dollar of equipment, and one point of it moves my base by about $19 (estimate).8
  3. At $154.14 the price is 15% above my base value, so it already asks for what I assume: a long-run income of 31.1% on new equipment against my 30%, and about $50B of cash going out before it comes back; my margin-of-safety price is $10, because debt and prepaid contracts rank ahead of the shares (estimate).16

Six questions, one line each

Why
AI companies cannot get enough chips in enough powered buildings, and Nebius says it has secured 2 GW of power, targets 5 GW by the end of 2026, and has signed Microsoft for about $17.4B and Meta for up to about $27B.28910 →
The moat
Thin on the product, since a customer can rent the same chips elsewhere; the real barrier is getting power, land and chips in volume, and the money to pay for them.2 →
The advantage
It designs its own servers and data centres and says new deals pay back in 1 year and 10 months, which would be fast, but that is the company’s figure on its best deals.8 →
Management
Arkady Volozh founded Yandex and controls 51.6% of the votes with 11.3% of the shares; since March ten directors and officers have sold $423M of stock, Volozh’s only to cover taxes, and the auditor’s report on controls was adverse, with two material weaknesses.211 →
Margin of safety
Below $10; the bear value is $7 because $13B of convertible debt and $6B of customer prepayments come before the shares, so I cannot name a price that covers the downside (estimate).46 →
The price
$154.14 at the close in Q4 2026, 46% below the June high, 15% above my base value and about 36 times the past year’s revenue on market value alone (calculated).13 →

The business

Nebius sells time on graphics chips. A customer that wants to train an AI model, or run one for users, needs thousands of NVIDIA chips wired together in a building with power and cooling. Nebius builds or leases the building, buys and installs the chips, and rents the result by the month, along with storage, networking and software to run it.2 The company is headquartered in Amsterdam. It is Dutch, files annual reports on Form 20-F and results on Form 6-K like other foreign companies, and its dollar results are reported under US accounting rules.2 The year is the calendar year.

It started in July 2024. That month the company, then called Yandex N.V., finished selling every Russian business, more than 95% of its revenue, assets and employees, and kept a small group of businesses abroad.2 Nebius is what was left. In 2023 its continuing business took in $9.8M. In 2025 it took in $529.8M, and in the first half of 2026 $981.3M.23 There are therefore three audited years for the business I am valuing, which is not enough to build a ten-year record from, and I say so in Valuation.

How it is built

Capacity is counted in megawatts of power. At the end of 2025 about 170 MW was active, meaning it was drawing power in servers and available to earn revenue.2 Management guides to 800 MW to 1 GW connected by the end of 2026 and says it has contracted, meaning secured with land and power commitments, more than 2 GW in February and now targets 5 GW by year end.582 Those are different things: contracted power is a right to build, connected power has electricity at the building, and active power is earning. The gap between them is where a year of delay hides.

It operates four kinds of site: greenfield, where it owns the land and designs the building, as in Mäntsälä, Finland and in Missouri and Alabama; brownfield; build-to-suit, as at Vineland, New Jersey; and co-location, renting space in someone else’s data centre in places such as Paris, Kansas City, Iceland, London and Israel.2 In May it also announced up to 1.2 GW of power and land for an owned site in Pennsylvania.12 The company says it designs servers and racks itself, that its Finnish site reuses server heat for local homes, and that its own-design data centres carry up to four times lower overhead than the industry average.2 I can check none of those efficiency claims from filings. They are the company’s own.

Revenue and adjusted EBITDA, by quarter

US$ millions, continuing operations

  • Revenue, Q2 2026 $582M
  • Adjusted EBITDA, Q2 2026 $236M
Revenue and adjusted EBITDA, by quarterQuarterly revenue rose from $50.9M in the first quarter of 2025 to $582.3M in the second quarter of 2026. Adjusted EBITDA went from a loss of $53.7M to a profit of $236.2M.−$100M$0$200M$400M$600MQ1 ’25Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26Revenue, Q1 ’25: $51MRevenue, Q2 ’25: $105MRevenue, Q3 ’25: $146MRevenue, Q4 ’25: $228MRevenue, Q1 ’26: $399MRevenue, Q2 ’26: $582MAdjusted EBITDA, Q1 ’25: −$54MAdjusted EBITDA, Q2 ’25: −$21MAdjusted EBITDA, Q3 ’25: −$5MAdjusted EBITDA, Q4 ’25: $15MAdjusted EBITDA, Q1 ’26: $130MAdjusted EBITDA, Q2 ’26: $236MRevenue and adjusted EBITDA, by quarterQuarterly revenue rose from $50.9M in the first quarter of 2025 to $582.3M in the second quarter of 2026. Adjusted EBITDA went from a loss of $53.7M to a profit of $236.2M.−$100M$0$200M$400M$600MQ1 ’25Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26Revenue, Q1 ’25: $51MRevenue, Q2 ’25: $105MRevenue, Q3 ’25: $146MRevenue, Q4 ’25: $228MRevenue, Q1 ’26: $399MRevenue, Q2 ’26: $582MAdjusted EBITDA, Q1 ’25: −$54MAdjusted EBITDA, Q2 ’25: −$21MAdjusted EBITDA, Q3 ’25: −$5MAdjusted EBITDA, Q4 ’25: $15MAdjusted EBITDA, Q1 ’26: $130MAdjusted EBITDA, Q2 ’26: $236MRevenue and adjusted EBITDA, by quarterQuarterly revenue rose from $50.9M in the first quarter of 2025 to $582.3M in the second quarter of 2026. Adjusted EBITDA went from a loss of $53.7M to a profit of $236.2M.−$100M$0$200M$400M$600MQ1 ’25Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26Revenue, Q1 ’25: $51MRevenue, Q2 ’25: $105MRevenue, Q3 ’25: $146MRevenue, Q4 ’25: $228MRevenue, Q1 ’26: $399MRevenue, Q2 ’26: $582MAdjusted EBITDA, Q1 ’25: −$54MAdjusted EBITDA, Q2 ’25: −$21MAdjusted EBITDA, Q3 ’25: −$5MAdjusted EBITDA, Q4 ’25: $15MAdjusted EBITDA, Q1 ’26: $130MAdjusted EBITDA, Q2 ’26: $236M
Adjusted EBITDA is the company’s measure. It leaves out stock pay, depreciation and deal costs, so it is not cash. Source Results releases for Q3 2025, Q4 2025, Q1 2026 and Q2 2026 [13][14][12][3]. Figures as reported.
Show the numbers
Revenue and adjusted EBITDA, by quarter
Q1 ’25Q2 ’25Q3 ’25Q4 ’25Q1 ’26Q2 ’26
Revenue (reported)$51M$105M$146M$228M$399M$582M
Adjusted EBITDA (reported)−$54M−$21M−$5M$15M$130M$236M

What it sells

Three layers. The bottom is plain capacity: GPU clusters, storage and networking. On top is a layer for machine-learning teams to schedule jobs and manage clusters. At the top is Token Factory, launched in November 2025, which rents inference, running a finished model, by the token instead of by the chip-hour.2 Management says Token Factory workloads more than tripled in the second quarter.8 The company bought Tavily, an agent search provider, in February, and Eigen AI and the Clarifai core team this spring; the cash paid for acquisitions in the first half was $251.6M net.238 In October it bought Inferize, an inference software company, on terms it did not disclose.15

The AI cloud business was 98% of group revenue in the second quarter, $574.9M of $582.3M, with an adjusted EBITDA margin of 49.7%.16 Two other businesses sit inside the group. Avride, which makes self-driving cars and delivery robots, lost $74.2M at the adjusted EBITDA line in the first half; TripleTen, an education business, lost $19.8M.16 Nebius also owns a stake in ClickHouse, a database company that raised money in January at a reported valuation of about $15B, and a stake in Toloka; the balance sheet carries its non-marketable equity investments at $1.6B (reported).163

Who pays

Two kinds of customer, and they pay on different terms. The first is the hyperscalers. On 8 September 2025 Nebius signed Microsoft for dedicated capacity at Vineland over five years for about $17.4B, rising to about $19.4B if Microsoft adds to it.9 On 1 November it signed Meta for two clusters over five years for about $2.9B.17 On 13 March 2026 it signed a larger Meta agreement of up to about $27B: $12B of dedicated capacity delivered from early 2027, plus an order of up to $15B under which Meta must buy any capacity of certain clusters that Nebius cannot sell to others.10 That last order is the unusual one. It is a backstop on future unsold capacity, up to $15B, and it matters for financing as much as for revenue.

The second kind is AI developers and software companies that rent on one-to-three-year contracts or by the hour. The company names Reflection, Cohere and a US quantitative trading firm among Q2 wins.8 In September Palantir named Nebius its preferred sovereign AI infrastructure partner.18 The filings do not name Nebius’s largest customers. They show that three customers each accounted for more than 10% of second-quarter revenue: 24%, 21% and 14%.4 One customer was 83% of receivables at the end of 2025.4 A business like this is the opposite of diversified, and the 20-F notes that the hyperscalers it serves may also offer competing clouds.2

What a megawatt earns

Revenue a megawatt of IT capacity a year, from the company’s second-quarter letter, against my base.

Price for a megawatt of capacity
Revenue a megawatt a yearWhat the company said
Contracts in the 2026 base (reported)$12MThe 2026 base in the Q2 letter
Mid-term deals signed in Q2 2026 (reported)$20M to $25MOne to three years; four deals averaged more than $1B each
Short-term capacity, third quarter 2026 (reported)$40M to $50MThree to six months; first deal signed in the week of the letter
My base, capacity installed in 2027 (estimate)$21.3MFalls to $16.1M by 2033 as new capacity arrives
The income I assume on new capacity is the single number that moves my value most. Section VI shows how. Source Q2 2026 letter; Q2 2026 call [8][5]. The base row is my estimate.

The backlog, and the money that came with it

Remaining performance obligations, contracted revenue not yet recognized, were $37.5B at 30 June 2026. The company expects 36% to be recognized in the 24 months to June 2028, 40% in the two years after that, and 24% later.4 All of it is the AI cloud. The Microsoft and Meta orders I can see announced total about $32.3B at signing, which is a large part of that $37.5B (calculated).91710 The notes do not break it down by customer, so I cannot say how much remains.

Contracted revenue still to come

Remaining performance obligations at 30 June 2026, US$ millions

  • Total, 30 June 2026 $37.5B
Contracted revenue still to comeRemaining performance obligations of $37.5B at 30 June 2026: 36% to be recognized in the 24 months to June 2028, 40% in months 25 to 48 and 24% after that.$0$5B$10B$15BNext 24 monthsMonths 25 to 48After 48 monthsRemaining performance obligations, Next 24 months: $13,497MRemaining performance obligations, Months 25 to 48: $14,996MRemaining performance obligations, After 48 months: $8,998MContracted revenue still to comeRemaining performance obligations of $37.5B at 30 June 2026: 36% to be recognized in the 24 months to June 2028, 40% in months 25 to 48 and 24% after that.$0$5B$10B$15BNext 24 monthsMonths 25 to 48After 48 monthsRemaining performance obligations, Next 24 months: $13,497MRemaining performance obligations, Months 25 to 48: $14,996MRemaining performance obligations, After 48 months: $8,998MContracted revenue still to comeRemaining performance obligations of $37.5B at 30 June 2026: 36% to be recognized in the 24 months to June 2028, 40% in months 25 to 48 and 24% after that.$0$5B$10B$15BNext 24 monthsMonths 25 to 48After 48 monthsRemaining performance obligations, Next 24 months: $13,497MRemaining performance obligations, Months 25 to 48: $14,996MRemaining performance obligations, After 48 months: $8,998M
The company gives the split in percentages; the dollar amounts are 36%, 40% and 24% of the total. All of it is the AI cloud business. It includes deferred revenue already paid for. Source Q2 2026 financial statements, revenue note [4]. Calculated from reported figures.
Show the numbers
Contracted revenue still to come
Next 24 monthsMonths 25 to 48After 48 months
Contracted revenue to come (calculated)$13,497M$14,996M$8,998M

Customers also paid in advance. Deferred revenue, cash received for services not yet delivered, rose from $1.58B at the end of 2025 to $5.98B at 30 June 2026, and management expects more than $9B of prepayments in 2026.48 In the first half those prepayments, $4.4B, made up almost all of the $4.5B of operating cash flow (calculated).3 About 70% of Q2 deals carried a prepayment, covering 50% to 60% of the cost of the equipment for those deals, the company says.8 This is the heart of how Nebius pays for its growth, and I treat the prepayments as borrowing, since the revenue they cover will arrive without cash.

What it costs to build

Capital spending was $4.07B in 2025 and $8.13B in the first half of 2026 alone; the 2026 guide is $20B to $25B.235 Property and equipment rose to $13.0B from $5.6B in six months, of which $7.8B was not yet in service.4 Leases that have been signed but not started will add $12.1B of payments over lease terms of up to twelve years, and $5.3B of minimum power and energy commitments run to 2030 and beyond.4 Those commitments are why I treat the megawatt economics, rather than the next quarter’s revenue, as the thing to get right.

The moat

I ask two questions. Could a competitor take this customer at the same price? And would the customer mind? On the first, today, yes. On the second, for most of Nebius’s customers, not much.

The product is close to a commodity

A rented GPU cluster is largely the same wherever it sits, because the chips come from one supplier and the software that matters to a researcher runs on any of them. The company lists its competitors itself: Amazon, Google, Microsoft and Oracle on the large side, and CoreWeave, Crusoe and Lambda among the AI-specialist clouds, with Fireworks AI and Together AI competing with Token Factory.2 Switching a training run between clouds is work, but a customer that has done it once has done it. The best evidence of how little protection the product alone gives is in the company’s own numbers: it repriced older-generation GPUs more than 30% higher in the second quarter because capacity is short, not because the product is better.8 A shortage can reverse.

What is hard to copy

Four things, none of them a product feature. First, power: land with electricity secured is scarce, and Nebius says it had contracted more than 2 GW by February, and it has raised its year-end 2026 target from more than 1 GW in August 2025 to 5 GW.28 Second, chips: NVIDIA invested $2B for a pre-funded warrant over 21.1M shares in March, holds 9.3% including those shares, and said in the same announcement that the partnership would enable Nebius to deploy more than 5 GW of NVIDIA systems by the end of 2030.192021 I take that as evidence of access to supply in a constrained market, though a supplier’s investment is not a promise to allocate chips. Third, credit: contracts with Microsoft and Meta let it borrow against signed revenue, as the $775M July facility at SOFR plus 2.50% shows.22 Fourth, time: it already runs a site and a software platform, and a new entrant needs years.

Where the protection is weakest

The protection has to be paid for every five or six years. Chips age out, and a data centre built for today’s racks must be refitted for tomorrow’s. A software business keeps its protection once built. A GPU landlord must rebuy a large part of it, which is why I model server replacement as a cost, not an afterthought. The second weakness is that most of the best sources of cash are things competitors can also buy. When the capital markets turned in October, Nebius shares fell with CoreWeave’s, which tells you investors saw them as the same kind of exposure.2324

There is also the question of what customers do at the end of a contract. A five-year deal at fixed prices protects only until it ends. After that, the customer is free to take bids, and the chips in the cluster are five years old. Management’s answer is mix: long contracts for financing, mid-term contracts for the core, short contracts for premium prices.8 It is a sensible book. It is also a book that depends on prices staying high.

My judgement: a capital and execution advantage in a market that is short of supply, not yet durable protection. The honest test is whether new capacity keeps earning well above its cost after other builders catch up. I do not assume it does. In my base the income on new equipment fades from 42% to 30% a year on cost by 2033, and in my bear it fades to 27%, where growth stops adding value (estimate).

The competitive advantage

The company’s case is vertical integration: it designs the server and the rack, builds the data centre, runs the cloud and offers software on top, so it controls cost and speed at each step.2 If true, it shows up in two places. Cost to build a megawatt, and time to bring one online.

Speed

The evidence on speed is mixed but real. Nebius says it has delivered all capacity tranches due to Microsoft under the contract, including two in the month before the August letter.8 Microsoft has the right to terminate a tranche if delivery is late after a grace period, and Meta has the same right on its first order, so on-time delivery is paid for by the contract, not just claimed.917 Active power was about 170 MW at the end of 2025 and I have no later figure.2 Connected power guidance for the end of 2026 is 800 MW to 1 GW.5 Hitting that will be the first hard evidence that the speed claim holds at scale, and the third-quarter results due on 10 November will show part of it.25

Cost

The company says that new deals closed in the second quarter pay back, counting the equipment and the operating costs that go with it, in one year and ten months, against its earlier two to three years.8 That implies the cash it expects to earn each year is a bit more than half the cost of the equipment (calculated). I use less. For capacity installed in 2027 I assume 42% a year on cost, which is a payback of about 2.4 years before overhead, fading to 30%. The management figure is for deals closed in the best quarter yet, on forecast costs, and includes capacity not yet built.8

The cost side is where an advantage would show, and it is where the filings are quiet. Cost of revenues, power, rent for co-location and staff, was 23% of revenue in the second quarter, down from 29% a year earlier, and the company puts the drop down to operating leverage.3 The cost of building a megawatt is not disclosed. The 2026 capex guide of $20B to $25B, set against an increase in connected power of roughly 630 MW to 830 MW over the year, from about 170 MW, works out to $24M to $40M a megawatt. Part of that spending buys capacity for 2027, and active and connected are not the same, so I treat it as a loose cross-check (calculated).52 I use $38M for capacity installed in 2027, with 70% of it servers and networking and 30% buildings and power (estimate).

What the advantage rests on

Company claims, and what I can check against filings.

Claims and checks
ClaimWhat I can checkWhat I cannot
Designs its own servers and racks (reported)The 20-F says soAny cost saving against buying the same servers from an OEM
Faster to deploy (reported)Microsoft tranches reported delivered; delivery dates carry termination rights89Time from contract to revenue for the 2027 builds
Pays back in 1 year and 10 months (reported)The company’s statement for Q2 deals8The cost forecast behind it, or what happens to capacity not yet built
More efficient data centres (reported)Finland heat reuse described in the 20-F2The overhead comparison with the industry
Full-stack software on top (reported)Token Factory workloads more than tripled in Q28Revenue from Token Factory and software on their own
Source 20-F 2025; Q2 2026 letter; 6-K filings [2][8][9].

Where it wins

Buyers who need capacity soon and cannot get it from a hyperscaler, which is most AI labs and start-ups today. Buyers who want a second source of compute beside Microsoft or Amazon, which is the case for Meta and Microsoft themselves. Buyers in Europe who care where their data sits, which is the pitch to Palantir’s customers.18 And buyers who want inference, the running of models, priced by the token and bundled with search and tooling.2

Where it loses

Scale and cost of money. Amazon, Google, Microsoft and Oracle can fund data centres out of operating cash flow. Nebius funds them with convertible notes at 0.5% to 4.5%, asset-backed debt at SOFR plus 2.50%, a $3.5B secured bridge at SOFR plus 2.75% rising to 3.50%, share sales and customer prepayments.622268 Its Chief Executive said, in a video interview reported second-hand, that some capital sources were temporarily closed.27 A landlord that rents equipment on thin margins over its cost of money has less room for error than one that does not. On financing, Nebius competes with CoreWeave, not with Amazon, and one press summary, which I could not check, put CoreWeave’s 2032 notes near 14.8% in mid-October.23

Management

Arkady Volozh, 62, founded Yandex in 2000 and runs Nebius as chief executive and an executive director.2 Ophir Nave, 57, a former Wachtell, Lipton lawyer, is chief operating officer. Andrey Korolenko, who ran infrastructure at Yandex, and Roman Chernin, who led Yandex Search and Maps, are co-founders and run product and infrastructure and the business side. Dado Alonso, who has been at Booking.com and Amazon, became chief financial officer in June 2025; Marc Boroditsky, from Cloudflare and Twilio, became chief revenue officer in May 2025.2 It is a team that built data centres and search at scale, and one that arrived in the US cloud market recently. Of the eight on the senior team, the finance chief and the sales chief have been there about a year.

Who controls it

Volozh does, with a minority of the money. The company has two classes of shares. Class A has one vote. Class B has ten. A trust whose beneficiaries include Volozh or his family holds 28,655,509 Class B shares, which is 51.6% of the votes and 11.3% of the shares.2 That makes Nebius a controlled company under Nasdaq rules, which lets it skip a fully independent nominating committee, though its board is a majority independent.2 At the AGM in August every resolution passed. The share of votes against his re-election was 5%, and the board got a five-year authority to issue up to another 20% of the shares and set aside existing holders’ rights to buy first.28 A holder of Class A shares has a say on paper and little in practice. The board includes Matt Weigand, a partner at Accel, who appears on this page in two roles: as a director, and as the interviewer on the Accel podcast I cite in Section VII.229

How they are paid, and what that pays them to do

Cash pay is small. The eight senior managers received $5.9M in cash in 2025 as a group, and the six non-executive directors $0.9M.2 The rest is stock. In 2025 the senior team was granted 6.35M options and 226,312 restricted share units, vesting over four years.2 Many of the options are “premium priced”: Nave, Chernin and Korolenko each hold 625,000 options struck at $100 a share, and Bunina holds 409,500 at $40.2 The shares closed at $154.14 on 30 October.1 Options struck well above the price at the time of the grant pay only if the stock rises a long way, and that pays managers to build as fast as the money allows. It does not tie pay to returns on the equipment, to payback, or to the cost of the debt. Nothing in the pay plan I can see asks for cash.

Volozh’s own incentive comes from ownership. His trust’s Class B stake is worth about $4.4B at $154.14 (calculated). I see no options for him in the ownership table. That is a real stake and it is large, though the votes he controls are about four and a half times his share of the equity.

What they sold

Directors and officers began filing Forms 3 and 4 in March 2026. Between 31 March and 15 October, ten of them sold 2.01M shares for $423M, at prices from about $100 to $243.11 Most of it was pre-arranged. Volozh sold 117,763 shares for $23.3M, all of it automatic sales to cover tax on vesting shares. Korolenko sold 1,121,294 shares for $224M, of which $207M was under a trading plan adopted in December 2025 and $17.5M to cover taxes. Nave sold 500,000 for $118M on 5 October under a plan adopted on 22 May; his filing says the shares were about 17% of his granted equity and that no further sales will be made under the plan. Ryan, a director, sold 50,000 for $13M and Boynton, the chairman, 37,502 for $8M, with no plan or tax reason stated.11 The one purchaser was a director, Arne Grimme, who bought 2,014 shares in eleven small trades between 15 and 29 October for about $0.3M.11

Insider sales this year

Shares sold and dollars, by person. Plan and tax columns follow each filing’s footnotes; “other” has no footnote.

Sales by directors and officers, 31 March to 15 October 2026
Shares soldProceedsTo cover taxesUnder a 10b5-1 planOther
Andrey Korolenko, chief product and infrastructure officer (reported)1,121K$224.2M$17.5M$206.7M$0.0M
Ophir Nave, chief operating officer (reported)500K$117.8M$0.0M$117.8M$0.0M
Arkady Volozh, chief executive (reported)118K$23.3M$23.3M$0.0M$0.0M
Charles Ryan, director (reported)50K$13.3M$0.0M$0.0M$13.3M
Marc Boroditsky, chief revenue officer (reported)61K$13.2M$3.0M$10.2M$0.0M
Danila Shtan, chief technology officer (reported)61K$12.5M$8.7M$3.7M$0.0M
John Boynton, chairman (reported)38K$8.4M$0.0M$0.0M$8.4M
Elena Bunina, director (reported)48K$8.3M$0.0M$8.3M$0.0M
Boaz Tal, general counsel (reported)8K$1.3M$0.3M$1.0M$0.0M
Dado Alonso, chief financial officer (reported)2K$0.5M$0.5M$0.0M$0.0M
All ten (calculated)2.01M$422.6M$53.2M$347.7M$21.7M
Sums are mine, from each Form 4’s sales (transaction code S) and footnotes. Sales that do not say a plan or tax are under “other”. Directors’ and officers’ cash pay for 2025 was $5.9M for the eight senior managers as a group. Source Forms 3 and 4, SEC EDGAR [11]. Sums are mine.

I draw no conclusion about intent; plans exist to take timing out of the seller’s hands. What the numbers show is a team that took out $423M in seven months, nearly all of it on a schedule, in a year when the company itself raised cash from other investors.

What they did with capital

The cycle is short, so the record is too. Shares outstanding were 361.5M in January 2023 and 235.8M at the end of 2024, after the divestment left 126M shares in treasury. They were 253.0M at the end of 2025, 271.9M at 30 June 2026, and about 288M after the August exchange, plus 21.1M held by NVIDIA as a pre-funded warrant, which is 31% more than at the end of 2024 (calculated).23619 Between June 2025 and August 2026 it sold $14.25B of convertible notes in four deals, took $2.0B from NVIDIA at about $95 a share, and sold 12.7M shares through its at-the-market programme at an average of $223.6 for $2.8B.8196

Some of that timing was very good. The ATM shares were sold close to the June peak. NVIDIA’s $2.0B came when the price was about $112 and was the largest single equity cheque of the year.1 Some was not. The June 2025 notes had a conversion price of $51.45 and the shares were $223.90 when Nebius exchanged $800M of them for 15.8M shares in August, which at that price is about $3.5B of stock for $0.8B of notes (calculated).47 The holders’ right to convert at $51.45 was written when the stock was cheap. That is not an error, because the notes cost almost nothing to carry, but it is the price of financing a start-up with options on its own stock.

Following the incentives, then: Volozh is paid by the share price, and the share price rewards size. The team has funded itself with new shares or convertible notes in every year I can see. The board gave itself authority to issue 20% more shares for five years, and shareholders approved it with 94% of votes cast in favour (calculated).28 The accounting record needs saying too. The auditor’s report on internal control was adverse for 2024 and for 2025. The two weaknesses at the end of 2025 were in the controls over property and equipment, including depreciation start dates and an asset-count reconciliation, and over IT controls and revenue for TripleTen, about 10% of revenue.302 The board dismissed the auditor, Reanda, after the 2025 audit and the first-quarter review, and put forward Deloitte; shareholders approved the appointment on 25 August.3128 Equipment is almost half of the balance sheet, so a weakness there matters more than one at a software company.

Financials

The business I am valuing has three audited years, 2023 to 2025, and the twelve months to June 2026. Before July 2024 these were part of Yandex, whose accounts are in a different business, in a different country, mostly in roubles, and I do not use them. So I cannot show ten years, and I do not think any model can honestly pretend to. Revenue rose from $9.8M to $529.8M in two years and to $1,355M over the latest twelve months, and the company has not had an operating profit in any of them (calculated).23

The path is a steep one. The second quarter of 2026 alone was larger than all of 2025 by $52M, at $582.3M against $529.8M.32 Adjusted EBITDA, the company’s own cash-like measure, was negative until the fourth quarter of 2025 and was $236.2M in the second quarter of 2026, a 41% margin.143 Cost of revenues fell from 200% of revenue in 2023 to 31% in 2025 and 26% over the latest twelve months (calculated). Depreciation is the line that matters next: $417.9M in 2025, 79% of revenue, and $765M over the twelve months, 56% of revenue (calculated). In January 2026 the company lengthened the life of servers from four years to five, which it said would cut 2026 depreciation by about $168M.2 That is a genuine choice, and a favourable one. Everything in my model after 2026 uses a longer life too, with a sixth year at a lower price, and I show what a shorter one does.

Nebius, three years and the latest twelve months

Calendar years, US dollars, continuing operations. TTM is the four quarters to 30 June 2026. Owner cash flow is operating cash flow less capital spending less stock pay.

Financial summary by year
202320242025TTM Jun 2026
Revenue (reported)$9.8M$91.5M$529.8M$1,355.1M
Revenue growth (calculated)–834%479%–
Cost of revenues (reported)$19.6M$43.7M$166.2M$348.8M
Cost of revenues, share of revenue (calculated)200%48%31%26%
Product development (reported)$87.1M$114.8M$177.3M$356.4M
Sales, general and administrative (reported)$159.5M$255.5M$380.1M$568.7M
Depreciation and amortization (reported)$29.3M$77.1M$417.9M$765.3M
Operating loss (reported)−$285.7M−$399.6M−$611.7M−$684.1M
Net income from continuing operations (reported)−$299.0M−$352.0M$9.8M$42.4M
Adjusted EBITDA, company measure (reported)−$240.7M−$226.3M−$64.9M$375.5M
Operating cash flow (reported)−$222.0M−$269.9M$401.9M$5,258.0M
Capital spending (reported)$82.9M$807.5M$4,066.0M$11,141.8M
Stock pay (reported)$28.8M$54.5M$83.2M$188.9M
Owner cash flow (calculated)−$333.7M−$1,131.9M−$3,747.3M−$6,072.7M
Change in deferred revenue (reported)$1.9M$10.0M$1,565.8M$5,957.8M
Owner cash flow without prepayments (calculated)−$335.6M−$1,141.9M−$5,313.1M−$12,030.5M
Weighted shares, millions (reported)370.8281.0242.5280.4
The weighted-share figure in the last column is the second quarter of 2026 alone. The February 2026 results release showed 2025 net income from continuing operations of $29.0M; the 20-F shows $9.8M. The gap is $19.2M of extra cost in the audited accounts: depreciation $13.9M higher ($417.9M against $404.0M), interest expense $3.7M higher ($61.5M against $57.8M) and administrative costs $1.6M higher ($380.1M against $378.5M), with tax unchanged at $4.0M. The 20-F does not say why. The release was unaudited, and I use the 20-F. Source 20-F 2025; Q1 and Q2 2026 results; SEC XBRL [2][12][3][14][32]. Figures as reported or calculated from reported data.

What an owner could really take out

Nothing, and a long way from nothing. Over the twelve months to June 2026 operating cash flow was $5.3B, but the change in deferred revenue was $6.0B of that, cash paid by customers for service they have not yet received (calculated).32 Capital spending was $11.1B and stock pay $0.19B. Owner cash flow, after equipment and stock pay, was −$6.1B, and without the prepayments −$12.0B (calculated). Reported net income from continuing operations was a profit of $42M, helped by $780.6M revaluing the ClickHouse stake in the first half; the operating loss was $684M (calculated).16 The gap between the reported figure and the cash an owner could take out is about $6B in one year.

What an owner put in: owner cash flow, with and without customer prepayments

US$ millions, continuing operations

  • Owner cash flow, TTM −$6.1B
  • Without prepayments, TTM −$12.0B
What an owner put in: owner cash flow, with and without customer prepaymentsOwner cash flow, operating cash flow less capital spending less stock pay, was −$334M in 2023, −$1,132M in 2024, −$3,747M in 2025 and −$6,073M over the twelve months to June 2026. Without the prepayments customers made in advance, 2025 would be −$5,313M and the twelve months −$12,031M.−$12B−$8B−$4B$0’23’24’25TTMOwner cash flow, 2023: −$334MOwner cash flow, 2024: −$1,132MOwner cash flow, 2025: −$3,747MOwner cash flow, TTM Jun 2026: −$6,073MWithout prepayments, 2023: −$336MWithout prepayments, 2024: −$1,142MWithout prepayments, 2025: −$5,313MWithout prepayments, TTM Jun 2026: −$12,030MWhat an owner put in: owner cash flow, with and without customer prepaymentsOwner cash flow, operating cash flow less capital spending less stock pay, was −$334M in 2023, −$1,132M in 2024, −$3,747M in 2025 and −$6,073M over the twelve months to June 2026. Without the prepayments customers made in advance, 2025 would be −$5,313M and the twelve months −$12,031M.−$12B−$8B−$4B$0’23’24’25TTMOwner cash flow, 2023: −$334MOwner cash flow, 2024: −$1,132MOwner cash flow, 2025: −$3,747MOwner cash flow, TTM Jun 2026: −$6,073MWithout prepayments, 2023: −$336MWithout prepayments, 2024: −$1,142MWithout prepayments, 2025: −$5,313MWithout prepayments, TTM Jun 2026: −$12,030MWhat an owner put in: owner cash flow, with and without customer prepaymentsOwner cash flow, operating cash flow less capital spending less stock pay, was −$334M in 2023, −$1,132M in 2024, −$3,747M in 2025 and −$6,073M over the twelve months to June 2026. Without the prepayments customers made in advance, 2025 would be −$5,313M and the twelve months −$12,031M.−$12B−$8B−$4B$0’23’24’25TTMOwner cash flow, 2023: −$334MOwner cash flow, 2024: −$1,132MOwner cash flow, 2025: −$3,747MOwner cash flow, TTM Jun 2026: −$6,073MWithout prepayments, 2023: −$336MWithout prepayments, 2024: −$1,142MWithout prepayments, 2025: −$5,313MWithout prepayments, TTM Jun 2026: −$12,030M
Prepayments are the change in deferred revenue in the cash flow statement. The cash is real, but it is an advance on revenue yet to be earned, not an owner’s surplus. Source 20-F 2025; Q2 2026 results [2][3]. Calculated from reported figures.
Show the numbers
What an owner put in: owner cash flow, with and without customer prepayments
202320242025TTM Jun 2026
Operating cash flow (reported)−$222M−$270M$402M$5,258M
Capital spending (reported)$83M$808M$4,066M$11,142M
Stock pay (reported)$29M$54M$83M$189M
Owner cash flow (calculated)−$334M−$1,132M−$3,747M−$6,073M
Change in deferred revenue (reported)$2M$10M$1,566M$5,958M
Owner cash flow without prepayments (calculated)−$336M−$1,142M−$5,313M−$12,030M

How much of the spending just stands still? In the first half, depreciation was $472M against capital spending of $8,130M, and almost all of the spending was growth. The deeper question is the steady-state number: when the fleet stops growing, servers must be replaced every five or six years. At my base cost of $38M a megawatt with 70% servers, replacing one megawatt costs about $4.4M a year in 2027 dollars, around a quarter of the revenue a new megawatt earns (estimate). That, not the depreciation charge in the income statement, is what an owner of a mature fleet pays each year before taking anything out.

Quality of earnings

Three things. Adjusted EBITDA leaves out stock pay of $137.8M in the first half, up from $32.1M a year earlier, including $74.9M tied to the Eigen AI deal, and it leaves out depreciation, interest and deal costs of $60.1M.316 Interest expense was $182.8M in the half, and in the second quarter $40.2M of interest was capitalized into equipment instead of expensed.34 And revenue per megawatt is not yet visible: the company reports annualized run-rate revenue, the last month of the quarter times twelve, and it was $3.0B at the end of June.8 That is a measure of how fast capacity is arriving, not of what the average megawatt earns.

The balance sheet

At 30 June Nebius had $8.04B of cash, $1.06B of restricted cash, $8.50B of convertible notes carried on the balance sheet, which will cost $10.04B at maturity, and $5.98B of deferred revenue.34 Since then it has issued $5.75B of new convertible notes, exchanged $800M of older ones for shares, drawn a facility of about $775M, and signed a $3.5B secured bridge with Citibank that matures in October 2027 and pays a rising margin.62226 A convertible note is cheap debt that can become stock. Whether the first notes become stock is shown by the price: the June 2025 notes convert at $51.45, the September 2025 notes at $138.75, the March 2026 notes at $180 to $183, and the August 2026 notes at $313 to $325, so at $154.14 the first two groups are in the money and the last two are not.47 Property and equipment is $13.0B and the pro forma total of promises made, leases, power contracts and the like, is larger than the balance sheet shows.

The share price over two years

Last close of each month, US dollars

  • Close, Q4 2026 $154.14
The share price over two yearsMonth-end closes from $21.38 at October 2024 to $154.14 on 30 October 2026. The lowest close was $73.87 on 5 February 2026 and the highest $286.69 on 18 June 2026.$0$100$200$300’25’26OctThe share price over two yearsMonth-end closes from $21.38 at October 2024 to $154.14 on 30 October 2026. The lowest close was $73.87 on 5 February 2026 and the highest $286.69 on 18 June 2026.$0$100$200$300’25’26OctThe share price over two yearsMonth-end closes from $21.38 at October 2024 to $154.14 on 30 October 2026. The lowest close was $73.87 on 5 February 2026 and the highest $286.69 on 18 June 2026.$0$100$200$300’25’26Oct
From the February 2026 low to the June high the shares rose 3.9 times; since June they have fallen 46%. Source Nasdaq historical [1]. Calculated from reported closes.

Valuation

First, how this goes badly wrong

Before any numbers I ask what would most likely ruin the business or the investment, and work back. There are three, and they feed each other.

Rental income on new equipment falls to what the equipment costs. Today a megawatt is short, and new deals are priced at $20M to $25M a year.8 That is a shortage price. If chip supply catches up, if one big customer builds its own capacity, or if a newer chip makes last year’s cluster less wanted, the price drops and the equipment bought at 2027 prices earns little more than its cost. The company is spending $20B to $25B this year, almost all of it on that bet.5 In my bear the income on new equipment falls to 27% a year of cost, and my value for the shares is $7.

The money stops before the buildings are done. The business needs to find about $36B on top of the $13.7B it has, before its cash turns, on my base, and the 20-F says the strategy depends on raising it.2 Microsoft can end a tranche if delivery is late, and Meta can end its first order the same way.917 A missed tranche would be a loss of revenue and a signal to lenders in the same week. The Chief Executive said in October, in an interview I know only second-hand, that some capital sources were temporarily closed.27 The newest debt is shorter and secured: $3.5B due in October 2027 that costs 2.75% over the benchmark rate and steps up by 0.25 points every 90 days.26

A few customers, on terms I cannot see. Three customers were 59% of second-quarter revenue.4 A Meta backstop of up to $15B depends on Meta’s credit; the small labs and start-ups on the shorter contracts depend on their own. If AI spending slows, the first sign would be mid-term customers not renewing and short-term prices falling.8

So the questions for everything below are: what do new megawatts earn after 2030, can the money be found at a cost the equipment can carry, and how much of the best case is already in the price.

What an owner gets today

Over the past year, operating cash flow was $5.3B, but $6.0B of it was customer prepayments. After equipment and stock pay, an owner would have put in $6.1B, and without the prepayments $12.0B (calculated).32 The reported profit of $42M is mostly the revaluation of ClickHouse.16 In my base, the first year in which the business produces more cash than it spends is 2030 (estimate).

What I cannot judge

Three things, and the answer depends on all of them. One: the long-run income on new equipment. One point of it is about $19 a share in my base, and I have no way to know whether it settles at 25% or 35%. Two: how long a server earns. The company changed its mind about this in January, from four years to five, and my base gives a sixth year at 60% of the price.2 Three: whether the bond and bank markets keep lending at these prices. I show ranges on all three instead of pretending to a precise number. If the range from bear to bull looks absurdly wide, $7 to $408, that is the honest answer, and it is how the business is built: a small layer of equity on top of a very large base of equipment, debt and prepaid contracts.

How I value it

I build the business from the megawatt. Each year I choose how many megawatts to add, what they cost, and what they earn. Revenue a megawatt is set from a single idea: the cash income on new equipment, as a share of its cost. A new rental business earns more than its cost of money while capacity is short, and less of an excess as others build. In my base that income starts at 42% a year on cost for 2027 capacity, in line with management’s own $20M to $25M a megawatt, and drifts to 30% by 2033. I take the cash margin on rental revenue at 75%, then charge overheads and stock pay, which together fall from 25% of revenue in 2027 to 10% at scale.3 Servers, 70% of cost, are replaced every six years; buildings and power, 30%, are written off over twenty. Tax is 23% after losses carried forward. The existing fleet is the 850 MW and the $8B of run-rate revenue the company guides to at the end of 2026, which I keep until its servers are replaced in 2032.5

The model runs from the second half of 2026, using the company’s guidance for that period: revenue of $3.1B for the year, a cash margin of about 40%, and capital spending of $22.5B, with the first-half actuals taken out.53 I assume the 2026 guide already pays for a quarter of the 2027 builds and that the rest, with half of the 2028 builds, falls in 2027, which puts base capital spending in 2027 at $31.0B; one summary of analysts’ estimates puts it near $29B.24 Management plans to deploy more than 1 GW a year from 2027, against 650 MW in my base and about 1 GW in my bull, and I found no company figure for 2027 capital spending.8 The timing is an estimate: if the 2026 guide pays for half of the 2027 builds, base value is $148, and if it pays for none, $119 (calculated). From 2027 to 2041 I add the cash from the business, then a terminal value on 2042 with growth of 2.0%, 3.0% and 3.5% in the three cases. Capacity grows in the terminal year in step with revenue, and servers are replaced every six years in perpetuity. Values are per share at 30 October 2026, from the 30 June balance sheet adjusted for the August notes and exchange, on 347M shares at the price and more in the bull. I keep each convertible note as debt until the value per share passes its conversion price, and then count its shares. Customer prepayments of $6.0B are treated as debt, since the revenue they pay for arrives with no cash, and the prepayments yet to come are left out because they are borrowing too.

What comes before the shares

The claims I deduct, and what I add.

Claims before the shares
AmountWhere it comes from
Cash and equivalents, 30 June 2026 (reported)$8,042MBalance sheet; excludes $1,056M restricted cash3
Net proceeds of the August convertible notes (reported)about $5,680MGross $5.75B, less costs; the company said $5.68B with the full option76
Convertible notes carried, 30 June (reported)$8,499MPrincipal due at maturity is $10,042M4
Less $800M of 2029 and 2031 notes exchanged for shares (calculated)−$802MCarrying amount of 80% of those two series
Plus the August notes at proceeds (calculated)$5,680MPrincipal $5.75B, accreting to $6.3B at maturity7
Customer prepayments, treated as debt (reported)$5,975MDeferred revenue, current and non-current4
Investments in non-marketable shares (reported)$1,607MMainly ClickHouse, at book3
Added to the business, not counted as it would cancel (estimate)$775M and $3.5BThe July facility and the October bridge raise cash and debt by the same amount
I do not deduct operating leases, since rent is in cost of revenues. The $12.1B of leases that have not started is therefore in my costs, not in my debt. The $775M facility and the $3.5B bridge raise debt and cash together, so I leave them out. Source Q2 2026 financial statements; August 2026 notes [4][3][7][6]. Reported or calculated.

The discount rate. The ten-year Treasury yield was 4.94% on the price date, and Damodaran’s implied equity risk premium 4.20%.3334 Nebius’s weekly beta against the S&P 500 is 2.83 over two years, which puts the cost of equity at 16.8%, and with the debt at 7% before tax the blended rate at about 14.5% (calculated).351 I use 12%, lower than the formula, for two reasons. A beta measured over a rise from $20 to $287 and a fall to $154 overstates how risky the equipment will be once it is under long contracts. And the Microsoft and Meta contracts announced add to $32.3B at signing, against $37.5B of contracted revenue left, so a large share of the contracted book sits with two companies with strong credit.917104 But the rate is a judgment, and the table below shows what 14% does: my base falls to $73.

Bear, base and bull

My estimates. Each case’s assumptions are in the rows.

Bear, base and bull cases
BearBaseBull
Megawatts earning at the end of 2030 (estimate)1,6503,4505,100
Megawatts earning at the end of 2041 (estimate)1,6505,7509,100
Cost of a new megawatt in 2027, all-in (estimate)$42M$38M$34M
Income on new equipment in 2027, a year, as a share of cost (estimate)32%42%50%
The same, from 2033 on (estimate)27%30%36%
Revenue a new megawatt earns in 2027, then in 2035 (estimate)$19.2M, $17.5M$21.3M, $16.5M$21.2M, $15.3M
Revenue, 2027 (estimate)$10.4B$14.9B$19.6B
Revenue, 2030 (estimate)$21.8B$54.0B$83.5B
Revenue, 2041 (estimate)$29.1B$91.1B$129.2B
Cash margin before equipment, 2035 (estimate)58%65%72%
Equipment spending, 2027 to 2030 (estimate)$32.4B$103.0B$147.9B
Most cash out before it turns, from 30 June 2026 (estimate)−$24.5B−$49.9B−$63.2B
Terminal growth (estimate)2.0%3.0%3.5%
Value of the business, discounted (estimate)$6.3B$47.3B$150.5B
Value per share (estimate)$7$134$408
Value per share if a third of the funding gap is raised as shares at today’s price (estimate)$36$138$366
Return a year from the price to year 10, with cash paid out (estimate)−17.6%10.5%22.7%
Value of the business is before the claims in the table above. “Cash margin before equipment” is revenue less running costs, overheads and stock pay. Source Model in this page’s method [3][5][8]. Values are my estimates.
Bear
Chip supply catches up with demand in 2027 and prices fall. Capacity installed from 2027 earns 32% a year on its cost, falling to 27% by 2030, which is roughly what I need to pay for the money. Capital markets stay open for contracted capacity only, and Nebius has 1,650 MW earning by 2030, and after that only replaces servers. Overheads stay heavy. The existing contracts pay but earn little over their cost, and the shares are worth almost nothing because the debt and prepayments come first.
Base
Nebius delivers 800 MW to 1 GW connected by the end of 2026 and about 650 MW a year for four years, two-thirds of the 1 GW a year management plans. New capacity earns 42% a year on its $38M cost, drifting to 30% by 2033 as other builders arrive. Servers earn full price for five years and 60% in a sixth. Overheads and stock pay fall from 25% of revenue to 10%. Revenue reaches $54.0B in 2030 and $91.1B in 2041. The business needs about $49.9B more than it generates before the cash turns, in 2029.
Bull
Management’s own plan works: more than 1 GW a year from 2027, the Meta backstop is never drawn because the capacity sells, and new capacity keeps earning 36% or more on its cost. Nebius reaches 5,100 MW by 2030 and 9,100 MW by 2041, at a cost of $34M a megawatt, with a cash margin of 72% at scale. Revenue is $129.2B in 2041.

The base path

My base case, selected years, US dollars.

The base path
202720282029203020312033203520382041
Megawatts earning, year end (estimate)1,5002,1502,8003,4503,9004,5004,8505,3005,750
Revenue (estimate)$14.9B$28.5B$41.5B$54.0B$62.6B$75.6B$77.1B$79.6B$91.1B
Cash earnings before equipment and tax (estimate)$7.5B$16.2B$25.3B$34.0B$40.0B$49.1B$50.1B$51.7B$59.2B
Equipment spending (estimate)$31.0B$25.1B$25.3B$21.6B$27.8B$27.6B$25.0B$37.7B$31.2B
Free cash flow (estimate)−$24.0B−$9.8B−$2.5B$8.7B$8.4B$15.1B$18.9B$7.9B$21.2B
The first years show cash going out. The business is a stack of large payments in the first four years and large receipts afterwards. Source Model; guidance [5][3]. Estimates.

Revenue in my three cases

US$ millions a year: bear to bull, with the base marked

  • Bear to bull, 2041 $29.1B to $129.2B
  • Base, 2041 $91.1B
Revenue in my three casesBase revenue reaches $54.0B in 2030 and $91.1B in 2041. Bear reaches $29.1B and bull $129.2B in 2041. The company’s 2026 guidance is $3.0B to $3.4B.$0$40B$80B$120B’26’31’36’41Revenue in my three casesBase revenue reaches $54.0B in 2030 and $91.1B in 2041. Bear reaches $29.1B and bull $129.2B in 2041. The company’s 2026 guidance is $3.0B to $3.4B.$0$40B$80B$120B’26’31’36’41Revenue in my three casesBase revenue reaches $54.0B in 2030 and $91.1B in 2041. Bear reaches $29.1B and bull $129.2B in 2041. The company’s 2026 guidance is $3.0B to $3.4B.$0$40B$80B$120B’26’31’36’41
2026 is the middle of the company’s guidance in the base, and the low and high ends in the bear and bull. Everything after 2026 is my estimate. Source Q2 2026 call [5]. Assumptions and values are my estimates.
Show the numbers
Revenue in my three cases
2026202720282029203020312032203320342035203620372038203920402041
Bear (estimate)$2,900M$10,360M$16,018M$19,631M$21,782M$21,216M$23,183M$26,624M$26,964M$27,423M$28,000M$25,661M$24,876M$27,336M$28,332M$29,061M
Base (estimate)$3,100M$14,916M$28,485M$41,520M$54,011M$62,552M$70,043M$75,551M$76,383M$77,075M$78,757M$78,656M$79,591M$83,865M$87,590M$91,140M
Bull (estimate)$3,400M$19,625M$41,470M$63,442M$83,545M$98,235M$109,375M$116,021M$116,926M$117,504M$119,119M$118,864M$118,566M$121,163M$124,772M$129,208M

Cumulative cash from the business, from 30 June 2026

US$ millions: bear to bull, with the base marked

  • Bear to bull, trough −$24.5B to −$63.2B
  • Base, trough −$49.9B
Cumulative cash from the business, from 30 June 2026Running total of free cash flow after equipment, tax and stock pay. In the base it falls to −$49.9B in 2029 before it recovers; the bear bottoms at −$24.5B and the bull at −$63.2B.−$60B−$40B−$20B$0$20B’26 H2’31’36’41Cumulative cash from the business, from 30 June 2026Running total of free cash flow after equipment, tax and stock pay. In the base it falls to −$49.9B in 2029 before it recovers; the bear bottoms at −$24.5B and the bull at −$63.2B.−$60B−$40B−$20B$0$20B’26 H2’31’36’41Cumulative cash from the business, from 30 June 2026Running total of free cash flow after equipment, tax and stock pay. In the base it falls to −$49.9B in 2029 before it recovers; the bear bottoms at −$24.5B and the bull at −$63.2B.−$60B−$40B−$20B$0$20B’26 H2’31’36’41
Cash on hand after the August convertible deal was about $13.7B, so the money still to find in the base is about $36.1B before customer prepayments, which I treat as borrowing. Source Model in this page’s method [3][6]. Estimates.
Show the numbers
Cumulative cash from the business, from 30 June 2026
2026 H2202720282029203020312032203320342035203620372038203920402041
Bear (estimate)−$11,207M−$23,585M−$24,478M−$19,406M−$10,220M−$10,761M−$16,517M−$12,314M−$4,709M$5,501M$18,011M$17,975M$12,100M$16,284M$24,345M$31,791M
Base (estimate)−$13,630M−$37,643M−$47,410M−$49,872M−$41,141M−$32,784M−$26,179M−$11,034M$6,590M$25,532M$47,867M$61,840M$69,755M$84,890M$103,427M$124,587M
Bull (estimate)−$16,022M−$49,587M−$63,240M−$61,107M−$40,818M−$14,262M$11,674M$43,490M$77,572M$115,115M$157,880M$194,605M$223,746M$255,130M$289,461M$330,685M

What the price says

Turn it round. At $154.14 the shares, counting the notes that are in the money as shares, are worth $53.5B. Add the other claims and the market puts a value of $54.2B on the business (calculated). My base is $47.3B (estimate). The price is 15% above my base, which means it already contains most of what I assume. It also means that I am not looking at a bargain, or an obvious mistake. I am looking at a price that needs the long-run income on new equipment to settle at 31.1% a year, against my 30% (calculated).

What the price needs

Reverse discounted cash flow at my rates.

Reverse discounted cash flow
Shares at the price, with in-the-money notes as shares (calculated)347M, worth $53.5B at $154.14
Plus debt that is not in the money, less cash, plus prepayments, less investments (calculated)$0.7B
Value of the business at the price (calculated)$54.2B
My base value of the business (estimate)$47.3B
Long-run income on new equipment the price needs, at my 12% rate (calculated)31.1% a year on cost, against my 30%
The same at the 14.5% the formula gives (calculated)36.4%
Or the discount rate that makes my base equal the price (calculated)11.5%
Cash the base needs from outside before it turns positive (estimate)about $36B after the $13.7B in hand
Source Nasdaq; model [1][35][33][34]. Calculated and estimated.

How much the answers move

Value by discount rate

Value per share in the three cases.

Value by discount rate
Discount rateBearBaseBull
10% (estimate)$32$223$586
11% (estimate)$18$174$486
12.0%, my rate (estimate)$7$134$408
13% (estimate)nil$100$347
14%, near the formula (estimate)nil$73$296
16% (estimate)nil$30$216
At 14% my base is $73 and the bull $296. At 10% my base is $223. “Nil” means the debt and prepayments exceed the value of the business, so the shares would be worth nothing. Source Model [33][34][35]. Estimates.

Value by what new equipment earns, and by how much is built

Base value per share. Rows scale all additions in the base; columns set the long-run income on new equipment.

Base value by long-run income on new equipment and volume
Megawatts built, against my base26% income28% income30% income, my base32% income34% income
Half (estimate)$33$57$81$105$128
My base (estimate)$53$94$134$172$208
One and a half times (estimate)$73$130$184$233$283
Each point of income is worth about $19 a share at my volumes. Building more is worth more only while the income stays above about 27%; below that it destroys value. Source Model [8][5]. Estimates.

Value by how long servers earn

Value per share. The last row of the cases is my base.

Value by how long servers earn
Server lifeBearBaseBull
4 years, flat (estimate)nilnil$219
5 years, flat (the company’s accounting life) (estimate)nil$87$372
6 years, sixth year at 60%: my base (estimate)$7$134$408
6 years, flat (estimate)$19$176$471
The company’s own accounting life is five years. “Nil” means the claims ahead of the shares exceed the value of the business. Source Model; 20-F 2025 [2]. Estimates.

The point of these tables is that no number here is stable. A change of two points in the long-run income moves the base by about $39. A change from my server life to five flat years moves it by about $47. Moving the discount rate from 12% to 14% moves it by about $61. Those are all inside what I would call reasonable. It follows that anyone who quotes a single value for this company to the dollar has hidden the range. I would say my value is between about $100 and $174 on the base case, at 13% to 11%, and between close to nothing and more than $400 across the three.

The money

The base needs about $49.9B of cash to go out between now and 2029, before it comes back. The company has $13.7B of cash after the August deal, and it receives customer prepayments, which I treat as borrowing.68 So the money still to find is about $36B, in the base, over about three years. Since March Nebius has raised about $19B: $10.1B of convertible notes, $2.0B from NVIDIA, $2.8B from share sales since May, a $775M secured loan and a $3.5B bridge (calculated).631982226 The pace is possible. The terms are what matter. If a third of the gap were raised as new shares at today’s price, my base would be $138 and my bull $366 (estimate). My bear would show $36, but only because shares sold at $154 are worth far more than my bear value, and in that case buyers at $154 would not turn up. The risk in the bear is not dilution. It is that the capital is not there at all.

The margin of safety

I set it from the bear case: the price at which my $7 bear value is three quarters of what is paid, so $10. That is almost meaningless as a price, and I say why. In the bear the equity is a thin slice above about $13B of convertible notes and $6B of prepayments. Whatever the price, a bad outcome in the equipment market can take most of it. There is no price I can name at which the downside here is covered.

What it is worth, against the price

Value per share, my estimates, against the close in Q4 2026

  • Bear to bull $7 to $408
  • Base $134
  • Price $154.14
  • Margin of safety below $10
What it is worth, against the priceValue per share: bear $7, base $134, bull $408. Price in Q4 2026: $154.14, 15% above the base value and 62% below the bull. Margin-of-safety price $10.BEAR$7BASE$134BULL$408Price $154.14What it is worth, against the priceValue per share: bear $7, base $134, bull $408. Price in Q4 2026: $154.14, 15% above the base value and 62% below the bull. Margin-of-safety price $10.BEAR$7BASE$134BULL$408Price $154.14What it is worth, against the priceValue per share: bear $7, base $134, bull $408. Price in Q4 2026: $154.14, 15% above the base value and 62% below the bull. Margin-of-safety price $10.Margin-of-safety zone: below $10$0$100$200$300$400$500Bear to bull: $7 to $408Bear case: $7 per shareBEAR$7Base case: $134 per shareBASE$134Bull case: $408 per shareBULL$408Price in Q4 2026: $154.14Price $154.14Close, Q4 2026
The weighted value, 25% bear, 50% base and 25% bull, is $171. The range is wide, and the base is a judgment inside it. Source Nasdaq historical; model in this page’s method [1]. Values are my estimates.

The price against the range

The price is 15% above my base and 62% below my bull. At $154.14 my base cash flows return 10.5% a year to year 10, my bull 22.7%, and my bear loses nearly all of it (estimate). Weighting the cases 25%, 50% and 25% gives $171, which is above the price because the range is skewed upward: the bull is a bigger distance from the base than the bear is, in dollars (estimate). The market may be right and I may be wrong. I may be too low on volume and too high on how fast other builders appear. I would rather show that than move the numbers until they meet.

Against the alternative

A ten-year Treasury pays 4.94%.33 The nearest comparison on this site is my Oracle page, which is the other large builder of AI data centres funded with debt and customer commitments. On my numbers Oracle returns 11.4% a year from its price to year 10. NVIDIA, which sells the chips Nebius rents and holds 9.3% of it, returns 9.3%.21 Nebius’s base return is 10.5%, within a point or two of both, but around it the range is far wider: the bear loses nearly all of the money and the bull is 2.6 times the price. Oracle and NVIDIA have larger, older and profitable businesses with floors under them. Nebius has a higher best case and no floor.

Quality and price, separately

How good is the business? A rented-chip business with strong customers and a shortage in its favour is a good business to be in today, and a hard one to stay good in. It earns well on the way up and must reinvest almost all it earns to keep the capacity. Its reported numbers and its cash numbers are far apart and the controls over its own equipment accounts are reported weak. How good is the price? A little above my base and unsafe on my bear. This looks like a good business in the middle of a boom, at a price that already assumes the boom lasts.

How the odds multiply

The base needs several things to go right together. My guesses at each are in the table. They are not independent, since a strong market helps all five, so the true chance of all five is higher than the product. But each looks more likely than not on its own, and the product is 15%.

How the odds multiply

Each step is my estimate; the product assumes they are independent.

How the odds multiply
StepMy odds
The company connects 800 MW to 1 GW by the end of 2026 and keeps adding about 650 MW a year (estimate)75%
New equipment keeps earning about 30% on cost after 2033, not less (estimate)45%
Money for about $36B of outside funding stays available at a cost I can carry (estimate)65%
The big contracts are delivered on time and none is terminated (estimate)80%
No further accounting or control surprise that costs the company its access to capital (estimate)85%
All five together (calculated)15%
The base is the middle of the range, not a case where everything goes right. Even so it needs all five. Source My estimates.

Where this could be in 5 and 10 years

Value in year 5 is my model’s value at October 2031 of the cash after that date, minus the debt the build will have added by then, per today’s share count and in that year’s dollars. Debt carries 12%. No new shares are issued. Year 10 is the same at October 2036. Nebius pays no dividend. Owner cash is what the business generates once the debt is repaid. The bull repays it in 2033; the base and bear still owe money in 2036, so they pay out nothing by then. These are estimates of value, not forecasts of the share price.

Value in 5 and 10 years, by case

Value per share at the date shown, my model, and the yearly return from today’s price to year 10.

Where this could be in 5 and 10 years
Value per share in year 5 (to October 2031)Value per share in year 10 (to October 2036)Owner cash paid out per share to October 2036Return a year from today’s price to year 10
Bear (estimate)$13$22nil−17.6%
Base (estimate)$236$417nil10.5%
Bull (estimate)$719$850$34622.7%
Year 5 is lower than year 10 in every case because the build is still being paid for. Return counts the year-10 value plus cash that could be paid out. Source Model in this page’s method [1]. Estimates.

For the base to hold at five years, Nebius has to have about 3.9 GW earning by 2031 and be carrying about $68.9B of net debt, with new contracts that repay their equipment in under three years. At ten years the base still carries about $20.3B of net debt, and the income on new equipment has to have settled near 30%, with servers earning for five years and a bit. The numbers that drive it are megawatts built, income on cost, the cost of the money, and the discount rate. The most likely way my base is wrong is that new megawatts earn less than 30% after 2030: at 26%, my base today would be $53. Value can sit above or below the price for years.

The case for the price

What most people miss

Three things cut in Nebius’s favour and rarely come up. First, the Meta agreement of March 2026 includes an order of up to $15B under which Meta must buy any capacity on certain clusters that Nebius cannot sell to others for the five years after it is deployed.10 That is a floor under some of the demand risk for the clusters it covers, and it is why the company can plan to sell the rest to others. Second, the company finances deals in a way that looks like a bank’s: the July facility was backed by a signed customer contract and covers more than 100% of the cost of the equipment under it, at SOFR plus 2.50%.3622 The company says it has more than $40B of other contracts from investment-grade customers that could support the same structure.36 Third, customers are paying in advance. About 70% of second-quarter deals included prepayments, and they covered 50% to 60% of the equipment cost of those deals.8 In a shortage, that makes the customer a lender, at no interest in most cases, to the company that is trying to build.

The bull case

In plain words: demand for AI capacity is larger than supply, the largest buyers have signed multi-year commitments, and Nebius is among the few independent builders with power, chips and balance-sheet access to deliver it. The CEO’s own account of this is in the second-quarter shareholder letter, dated 12 August 2026: new deals priced at $20M to $25M a megawatt, payback of one year and ten months, and, in the letter’s words, “We could sell our entire 2027 capacity on these terms today.”8 NVIDIA, which holds 9.3%, said when it invested that Nebius is building “an AI cloud designed for the agentic era”, in a quote from its chief executive, Jensen Huang, dated 11 March 2026.2021

On the holder side, Situational Awareness LP, the fund run by Leopold Aschenbrenner, held 4,464,260 Nebius Class A shares at 30 June 2026, according to its 13F filed on 14 August, worth $1.23B at that quarter-end price and 6.1% of the portfolio that filing reports.37 That is a dated position, not a statement by anyone about the company. The same group also filed a Schedule 13G on 27 May 2026 that reported 12,410,060 Class A shares, 5.6% of the class, at 19 May 2026.43 The two filings are six weeks apart and use different tests, and neither says why the numbers differ. I cannot tell from them whether the fall is a sale or a difference in what is counted, so I draw no view from either. A 13F does not show shorts or holdings outside the US, and I draw nothing from it about what the fund holds today or will do. On the sell side, according to a TIKR summary, Bank of America’s Tal Liani reiterated a positive rating with a $310 target on 22 October, citing customer prepayments and sector selling that had no company-specific cause; the same summary says Piper Sandler cut its target to $185 on 21 October, and StockWireX lists that rating as neutral.2423 Short interest was about 20% of free float in October, per the StockWireX summary of Yahoo Finance and ORTEX data, which I could not check.23

What the podcasts and interviews say

I looked for what the people whose judgment you might want have said about Nebius and the neocloud model in public: the four hosts of the All-In podcast, Gavin Baker, Brad Gerstner and Bill Gurley, and Volozh himself. For the All-In hosts, Baker and Gurley I found no episode, transcript or show note about Nebius or neoclouds that I could open and date, so I name nobody and say nothing on their behalf. For Gerstner I found nothing about Nebius that I could open and date, so he is left out too. I searched again on 31 October 2026 and the result did not change.

For Volozh I found three interviews, and I could open none of the audio or video. They are all secondhand or thin, and I have marked them so. The Accel “Spotlight On” podcast, season 3, episode 5, has no date on its page and lists a chapter at 14:20 called “The secret to building infrastructure: technology and capital”, but no transcript. It is hosted by Matt Weigand of Accel, who is also a Nebius director, so it is not an outside view.29 A Substack summary dated 9 May 2026 describes a podcast it does not name, and quotes him saying that wholesale bare-metal rental is “the business of a typical NeoCloud”, and that Nebius is “not there”, building layers on top.38 That is the claim to weigh. In the filings the two big hyperscaler contracts are for “dedicated GPU infrastructure capacity”, and in the filings I read the company does not split revenue between rented capacity and software.9172 Nebius may well be building layers, but I cannot see them in the numbers yet, and most of the contracted book is the kind of rental he says it is not. In the same summary he puts unbacked debt for a young company at 10% to 12% and the cost with a hyperscaler behind the contract at about 6%.38 The July facility at SOFR plus 2.50% is consistent with the second figure.22

The third, an excerpt from a video interview recorded at NVIDIA’s GTC in Berlin and circulated on X on Sunday 25 October, is relayed by 24/7 Wall St. and Yahoo Finance. He is reported to have said that some capital sources, asset-backed and debt markets, were temporarily closed, that “We have a pretty healthy balance sheet”, and that customer advances and other instruments would probably fund at least one gigawatt.27 Checked against the filings: the first is consistent with the October bridge, which is secured on substantially all the assets, costs more and falls due in a year.26 The second is true of the 30 June balance sheet, where cash of $8.0B was nearly the size of the convertible debt, though debt and prepayments have grown since.3 The third is a fair reading of the prepayment data, since one gigawatt at my base cost of $38M a megawatt is $38B and prepayments of more than $9B would cover about a quarter of it by themselves (calculated).8 I could not find the original episode, its host or any timestamp, so treat all three as reported speech, not as confirmed.

Against reality

Today, revenue is up 454% on the year and adjusted EBITDA was $236.2M in the second quarter.3 Contracted revenue is $37.5B and capacity is arriving. If Nebius connects 800 MW to 1 GW by the end of 2026, builds about 650 MW a year after that, prices new capacity near $21M a megawatt a year in 2027, easing to about $16M by 2035, and raises about $36B in debt at 12% or less, my base is possible: $134 a share. The price is 15% above that, and a long-run income on new equipment of 31.1% would justify it, against my 30% (calculated). So the distance between today’s numbers and my base case is modest. The distance between today’s numbers and the case where the price is right is a build that has not happened, financed with money not yet raised.

What a 10x would take. Ten times $154.14 is $1,541 a share. With every convertible note converted, that is about 393M shares and a market value of about $605B. At 25 times owner cash that needs about $24B a year of owner cash. At the 17% of revenue my base earns after replacing equipment, that is about $141B of revenue, against $530M in 2025, which is 266 times and 1.8 times my base revenue for 2036 (calculated).2 Ten years is also the period in which NVIDIA’s shares rose 115 times and Tesla’s 30 times, from market values of about $38B and $30B (calculated).39 Nebius starts at about $49B. Ten times from here is 3.8 times my bull. For a business that sells a rented, depreciating asset to a few buyers, I think tenfold is close to impossible, and I would not build a case on it.

What they have to hit

Six numbers on a fixed schedule. Thresholds come from my base case and agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
Revenue, 2026$981M in the first half; guide $3.0B to $3.4B for the year35About $3.1B in 2026, and $14.9B in 2027 (estimate)Quarterly results release and 6-K; the revenue lineQ3 2026 results, 10 November 2026
Megawatts connectedAbout 170 MW active at the end of 2025; guide 800 MW to 1 GW connected for the end of 202625800 MW to 1 GW at the end of 2026, and about 1,500 MW earning at the end of 2027 (estimate)Shareholder letter, capacity sectionQ3 2026 letter, 10 November 2026
Annualized run-rate revenue$3.0B at 30 June, up from $1.9B in March8$7B to $9B at the end of 2026, as guided; my base takes $8BShareholder letter, ARR lineQ3 2026 letter; year end in February 2027
Price of new capacity$20M to $25M a megawatt a year on Q2 deals; payback 1 year 10 months8About $21M a megawatt for 2027 capacity, still above $16M by 2033 (estimate)Shareholder letter, “ACV per MW” chartEach quarterly letter
Financing$5.75B of convertibles in August; $3.5B secured bridge due October 2027; $40B+ of contracts for asset-backed debt62636A term loan or asset-backed deal that takes the bridge out before mid-2027, at no more than about 3.5 points over SOFR (estimate)Form 6-K filings; debt note in each results releaseBefore the October 2027 maturity
Shares271.9M outstanding at 30 June, plus 21.1M under NVIDIA’s warrant and 15.8M issued in August3196Fewer than about 350M by the end of 2027, counting the warrant and any converted notes (estimate)Outstanding shares line in each results release; Form 6-K for share issuesQ3 2026 results, 10 November 2026
Source Q2 2026 results, letter and call; 20-F; 6-K filings [3][8][5][2][6][26]. Thresholds are my estimates.

Where I come down

What moved me was the financing. A signed contract from Microsoft or Meta that supports secured debt at a margin of 2.5 points over the benchmark is a different business from one that has to sell shares, and I gave it credit in the cost of money. What did not move me is the speed of the revenue, because the model already takes the whole of the company’s 2026 guide. The two things I most want to see are a third-quarter letter that shows new capacity still priced at $20M a megawatt or better, and the bridge refinanced on better terms. If both happen, I would raise my base, mainly by lifting the long-run income on new equipment; each point of it is about $19 a share.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • Delivery. Microsoft may terminate a tranche if Nebius is late after a grace period, and the first Meta order has the same term.917 Nebius says it has delivered all Microsoft tranches to date.8 The Meta order of March 2026 starts in early 2027 on a new chip, NVIDIA’s Vera Rubin.1040
  • Chips and power. Three suppliers made up the equipment spending at 30 June, up from two at year end.4 The company has signed a partnership with Bloom Energy to deploy fuel cells, one of several ways it is trying to get power quickly.8 What a one-year delay would do to the value is in the geopolitical section below.
  • Controls and reporting. The auditor’s opinion on internal control was adverse for 2024 and 2025, there are two material weaknesses, the Dutch statutory accounts were late, and the auditor is changing.24131 A restatement of the equipment accounts would matter more than at most companies.
  • Control and dilution. One shareholder holds 51.6% of the votes, and the board can issue 20% more shares for five years without offering them to others first.228 The older notes were struck at much lower prices than today.4
  • Tax left over from the divestment. Nebius paid $181.5M of Dutch dividend withholding tax in the first half of 2025, a cost of the Russian divestment, and the 20-F covers the matter.162
  • Avride and TripleTen. Together they lost $94M at adjusted EBITDA in the first half. Management said in the 20-F it is exploring outside investment into Avride, including a deal in which it might cede control.162
  • Accounting choices. The longer server life, the capitalized interest of $40M in one quarter, and the revaluation gains in profit all make reported results look better than cash.24

Geopolitical risk, and what it means for the value

Until July 2024 this was Yandex N.V., and more than 95% of its revenue, assets and employees were in Russia. It sold all of them for $2.6B in cash and 162.5M of its own shares, and says it now has no customers, suppliers or partners there.2 The past still costs something: $181.5M of Dutch withholding tax on the share part of the price, and, the 20-F warns, slower onboarding and know-your-customer checks with banks and counterparties.2 The Dutch domicile matters little to value today. Dividends would bear 15% Dutch withholding tax, but my base pays none inside ten years.2

The live exposures are elsewhere. Nebius owns a site in Finland and rents or builds in France, Iceland, the UK, Israel and the United States, where Microsoft’s capacity is in New Jersey.2 The 20-F says it is watching export controls on chips and a proposed US rule that would make cloud providers check foreign customers and let Washington restrict some deals.2 It also warns that the conflict involving the United States, Israel and Iran could disrupt its Israeli sites and people, but gives no size for them.2 Commerce decides the first, Israel’s security the second, and grid operators and permit bodies the third, power. Contracted power is a right to build, not electricity at the building.8

I do not predict events. The odds below are my judgment and rough: the filings name each risk and give no probability, and Nebius has so far delivered every Microsoft tranche on time.8 The price allows for none of them by name. At $154.14 it sits 15% above my base, and my 12% discount rate carries ordinary risk, not a specific event.

Six outcomes, and my base value in each

Value per share, my model rerun with one change at a time. Odds are my judgment over the next three years.

Geopolitical scenarios and base value
ScenarioWhat happensOddsBase valueChange
No eventMy base as it stands$134
Late capacityNew capacity arrives a year late from chip supply, an export rule or power1 in 5 (estimate)$95 (estimate)−29%
TariffsEquipment costs 10% more and customers do not repay it1 in 4 (estimate)$64 (estimate)−53%
IsraelA tenth less new capacity from 2027 (the Israeli share is not disclosed)1 in 10 (estimate)$124 (estimate)−8%
Dearer moneyThe discount rate rises one point to 13%1 in 3 (estimate)$100 (estimate)−25%
A US buyerMicrosoft, Meta or another buyer pays 5% less on new capacity1 in 5 (estimate)$93 (estimate)−31%
One change at a time; two together would take more off. Source Model in this page’s method [1]. Estimates.

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Price of new capacity$20M to $25M a megawatt on Q2 deals8Q3 and Q4 deals at the same level or higher, with payback under two yearsNew contracts below $17M a megawatt or longer payback
Connected powerGuide 800 MW to 1 GW at year end5At or above 1 GW, on schedule, with the Meta capacity ready in early 2027Below 800 MW, or a tranche terminated
Financing$3.5B bridge due October 202726Replaced by a longer secured loan at a margin under 3.5 pointsA repeat of a short, secured bridge, or an equity raise below $120
CustomersThree customers at 59% of Q2 revenue4A broader base with no customer above 25%A large customer not renewing, or the Meta backstop drawn
Owner cash−$6.1B over twelve months, −$12.0B without prepayments3Prepayments covering more than 60% of equipment cost, and positive free cash flow in 2030Prepayments falling below 40% of capital spending
ControlsTwo material weaknesses at year end 20252Both reported as fixed in the 2026 20-F, with a clean opinionA restatement, or another weakness
Source Q2 2026 results and letter; 6-K filings; 20-F [3][8][26][2]. Thresholds are my judgement.

Sources

  1. 1NBIS daily closes, Nasdaq.com historical API, 21 October 2024 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Close/Last on 10/30/2026 = $154.14, Nasdaq Global Select; closing high $286.69 on 18 Jun 2026, closing low $73.87 on 5 Feb 2026; next earnings date shown as 10 Nov 2026 · Accessed 30 Oct 2026↩︎
  2. 2Nebius Group Form 20-F, year ended 31 December 2025 (opens in a new tab)FilingSEC EDGAR · 30 Apr 2026 · Items 3, 4, 5, 6, 7; financial statements 2023 to 2025 (continuing operations); adverse opinion on internal control; Microsoft and Meta; 2 GW contracted power; 170 MW active · Accessed 30 Oct 2026↩︎
  3. 3Nebius press release, second quarter 2026 results (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 12 Aug 2026 · Revenue $582.3M; adjusted EBITDA $236.2M; balance sheet; cash flow; share count 271,855,218 at 30 June 2026; non-GAAP reconciliation · Accessed 30 Oct 2026↩︎
  4. 4Nebius unaudited condensed consolidated financial statements, six months ended 30 June 2026 (Ex. 99.2 to 6-K) (opens in a new tab)FilingSEC EDGAR · 12 Aug 2026 · Remaining performance obligations $37,490.6M; deferred revenue $5,975.2M; convertible notes; leases not yet commenced $12,054.1M; customer concentration; options and RSUs; subsequent events · Accessed 30 Oct 2026↩︎
  5. 5Nebius Q2 2026 earnings call transcript (opens in a new tab)TranscriptThe Motley Fool · 19 Aug 2026 · Third-party transcript of the 12 August call: guidance for revenue $3.0B to $3.4B, year-end run-rate $7B to $9B, capex $20B to $25B, connected power 800 MW to 1 GW; "we want to build a gigawatt capacity per year" · Accessed 30 Oct 2026↩︎
  6. 6Nebius press release, closing of $5.75B convertible notes (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 24 Aug 2026 · Over-allotment exercised in full; $3.45B of 2030 notes and $2.3B of 2034 notes; aggregate gross proceeds about $5.75B · Accessed 30 Oct 2026↩︎
  7. 7Nebius press release, pricing of $5.0B convertible notes (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 20 Aug 2026 · $3.0B 0.50% notes due 2030 at $313.46 and $2.0B 4.50% notes due 2034 at $324.65; accretion to 110% and 125%; exchange of $800M of 2029 and 2031 notes for about 15.8M shares; last sale $223.90 on 19 Aug · Accessed 30 Oct 2026↩︎
  8. 8Nebius Group, Letter to shareholders, Q2 2026 (opens in a new tab)LetterNebius Group · 12 Aug 2026 · Annualized run-rate revenue $3.0B; $20M to $25M a megawatt on Q2 deals; payback 1 year 10 months; 5 GW contracted power target; more than $9B of 2026 customer prepayments; ATM sales · Accessed 30 Oct 2026↩︎
  9. 9Nebius Form 6-K, commercial agreement with Microsoft (opens in a new tab)FilingSEC EDGAR · 8 Sep 2025 · Five-year term, about $17.4B through 2031, up to $19.4B; Vineland, New Jersey; Microsoft may terminate a tranche for late delivery; starts when Nebius confirms financing · Accessed 30 Oct 2026↩︎
  10. 10Nebius Form 6-K, Infrastructure Service Agreement with Meta (opens in a new tab)FilingSEC EDGAR · 16 Mar 2026 · Up to about $27B: $12B of dedicated capacity from early 2027 and up to $15B backstop for unsold capacity · Accessed 30 Oct 2026↩︎
  11. 11Nebius Group Forms 3 and 4 filed with the SEC, March to October 2026 (opens in a new tab)FilingSEC EDGAR · 30 Oct 2026 · Sales by directors and officers between 31 March and 15 October 2026, read from each filing’s transactions and footnotes; totals are my sums · Accessed 30 Oct 2026↩︎
  12. 12Nebius press release, first quarter 2026 results (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 13 May 2026 · Revenue $399.0M; adjusted EBITDA $129.5M; 1.2 GW Pennsylvania site · Accessed 30 Oct 2026↩︎
  13. 13Nebius press release, third quarter 2025 results (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 12 Nov 2025 · Third-quarter 2025 revenue $146.1M; adjusted EBITDA −$5.2M · Accessed 30 Oct 2026↩︎
  14. 14Nebius press release, fourth quarter and full year 2025 results (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 12 Feb 2026 · Fourth-quarter revenue $227.7M; adjusted EBITDA $15.0M; net income from continuing operations shown as $29.0M, against $9.8M in the 20-F · Accessed 30 Oct 2026↩︎
  15. 15Nebius press release, acquisition of Inferize (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 1 Oct 2026 · Terms not disclosed · Accessed 30 Oct 2026↩︎
  16. 16Nebius Operating and Financial Review and Prospects, three and six months ended 30 June 2026 (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 12 Aug 2026 · Segment revenue and EBITDA; cost of revenues; depreciation life change from four to five years; liquidity and cash flows · Accessed 30 Oct 2026↩︎
  17. 17Nebius Form 6-K, commercial agreement with Meta (first order) (opens in a new tab)FilingSEC EDGAR · 12 Nov 2025 · Two GPU clusters, five-year term, about $2.9B; Meta may terminate for late delivery · Accessed 30 Oct 2026↩︎
  18. 18Palantir and Nebius press release (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 8 Sep 2026 · Palantir names Nebius its preferred sovereign AI infrastructure partner · Accessed 30 Oct 2026↩︎
  19. 19Nebius Form 6-K, private placement of pre-funded warrant to NVIDIA (opens in a new tab)FilingSEC EDGAR · 11 Mar 2026 · $2B for 21,065,936 Class A shares at $0.0001; six-month lock-up · Accessed 30 Oct 2026↩︎
  20. 20NVIDIA and Nebius press release (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 11 Mar 2026 · Partnership; "more than 5 gigawatts" of NVIDIA systems by end of 2030 · Accessed 30 Oct 2026↩︎
  21. 21Schedule 13G filed by NVIDIA Corporation on Nebius Class A shares (opens in a new tab)FilingSEC EDGAR · 20 Jul 2026 · 22,256,412 shares, 9.3% of class, event date 13 July 2026, including 21,065,936 shares issuable on the pre-funded warrant · Accessed 30 Oct 2026↩︎
  22. 22Nebius Form 6-K/A, senior secured facility (about $775M) (opens in a new tab)FilingSEC EDGAR · 17 Jul 2026 · SOFR plus 2.50%, matures 31 Oct 2030, debt service coverage ratio 1.15, secured on borrowers’ assets · Accessed 30 Oct 2026↩︎
  23. 23Nebius Stock Is 47% Off Its Peak: Debt, Shorts and Options Explained, StockWireX (opens in a new tab)NewsStockWireX · 26 Oct 2026 · Secondhand: short interest about 20% of free float (Yahoo Finance and ORTEX); analyst targets; reported options positions · Accessed 30 Oct 2026↩︎
  24. 24Nebius Lost 33% in a Month. Bank of America Sees 95% Upside From Here, TIKR (opens in a new tab)NewsTIKR · 26 Oct 2026 · Secondhand: Bank of America’s Tal Liani, positive rating and $310 target reiterated 22 Oct 2026; analysts’ net debt estimates; Piper Sandler cut to $185 on 21 Oct · Accessed 30 Oct 2026↩︎
  25. 25NBIS quote and summary, Nasdaq, close on 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Last sale $154.14, down 10.38% (−$17.85) on the day; earnings date 10 Nov 2026 · Accessed 30 Oct 2026↩︎
  26. 26Nebius Form 6-K, $3.5B bridge facility with Citibank (opens in a new tab)FilingSEC EDGAR · 22 Oct 2026 · Senior secured term loan, matures 16 Oct 2027, Term SOFR plus 2.75% rising to 3.50%, minimum liquidity covenant, security over substantially all borrower assets · Accessed 30 Oct 2026↩︎
  27. 27Nebius CEO says company has enough to build its gigawatt, but admits some capital sources are temporarily closed, 24/7 Wall St. (opens in a new tab)News24/7 Wall St. · 26 Oct 2026 · Secondhand: relays an excerpt of a Volozh video interview recorded at NVIDIA GTC Berlin and circulated on X; the original episode and host are not named, and I could not find it · Accessed 30 Oct 2026↩︎
  28. 28Nebius press release, results of the 2026 Annual General Meeting (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 26 Aug 2026 · All resolutions adopted, including a five-year authority to issue up to a further 20% of share capital (375.4M votes for, 23.7M against) and the appointment of the auditor · Accessed 30 Oct 2026↩︎
  29. 29Nebius’s Arkady Volozh on What it Takes to Build Infrastructure Needed for the AI Era, Accel “Spotlight On”, season 3, episode 5 (opens in a new tab)PodcastAccel · undated · Host Matt Weigand of Accel, who is also a director of Nebius; the page lists chapters (14:20 on technology and capital) but no date or transcript · Accessed 30 Oct 2026↩︎
  30. 30Nebius Group Form 20-F, year ended 31 December 2024 (opens in a new tab)FilingSEC EDGAR · 30 Apr 2025 · Divestment of Russian businesses; first year of the AI cloud business; adverse opinion on internal control at 31 Dec 2024 · Accessed 30 Oct 2026↩︎
  31. 31Nebius Form 6-K, change in certifying accountant (opens in a new tab)FilingSEC EDGAR · 12 Feb 2026 · Board to recommend Deloitte & Touche LLP; Reanda Audit & Assurance B.V. dismissed after the 2025 audit and first-quarter 2026 review · Accessed 30 Oct 2026↩︎
  32. 32Nebius Group company facts (XBRL), SEC EDGAR (opens in a new tab)DataSEC EDGAR · 30 Oct 2026 · Annual revenue, capital spending, stock pay and operating cash flow, continuing operations · Accessed 30 Oct 2026↩︎
  33. 33US Treasury daily par yield curve rates, 2026 (opens in a new tab)DataU.S. Department of the Treasury · 30 Oct 2026 · 10-year 4.94% on 10/30/2026 · Accessed 30 Oct 2026↩︎
  34. 34Damodaran implied equity risk premium, 1 October 2026 (opens in a new tab)ResearchAswath Damodaran, NYU Stern · 1 Oct 2026 · Implied ERP 4.20% (trailing 12 month, with adjusted payout); same basis as the other Investing pages · Accessed 30 Oct 2026↩︎
  35. 35SPY daily closes, Nasdaq.com historical API, 21 October 2024 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Used with NBIS closes for weekly beta: 2.83 over two years (105 weekly returns) · Accessed 30 Oct 2026↩︎
  36. 36Nebius press release on the $775M secured facility (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 17 Jul 2026 · More than $40B of additional contracted revenue from investment-grade customers; facility covers more than 100% of the capex of the underlying infrastructure · Accessed 30 Oct 2026↩︎
  37. 37Situational Awareness LP, Form 13F-HR information table, period 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · Nebius Group N.V. Class A: 4,464,260 shares, $1,232,894,684; accession 0000935836-26-000418 · Accessed 30 Oct 2026↩︎
  38. 38I Listened to the May 2026 Nebius CEO Arkady Volozh Podcast So You Don’t Have To, Pari Passu (Substack) (opens in a new tab)NewsPari Passu · 9 May 2026 · Secondhand summary of a Volozh podcast; the show, host and timestamps are not given and I could not identify the episode · Accessed 30 Oct 2026↩︎
  39. 39NVDA and TSLA daily closes, Nasdaq.com historical API, 31 October 2016 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Split-adjusted: NVDA $1.779 to $204.64; TSLA $13.182 to $399.81 (TSLA from the same API, symbol TSLA); share counts from 10-Q cover pages as used on the Rocket Lab page · Accessed 30 Oct 2026↩︎
  40. 40Nebius press release on the new Meta agreement (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 16 Mar 2026 · $12B of dedicated capacity across multiple locations, based on one of the first large-scale deployments of the NVIDIA Vera Rubin platform, from early 2027; contract value of up to about $27B · Accessed 30 Oct 2026↩︎
  41. 41Nebius notice of Annual General Meeting 2026 (Ex. 99.1 to 6-K) (opens in a new tab)FilingSEC EDGAR · 27 Jul 2026 · Authority to issue up to a further 20% of share capital and exclude pre-emption rights for five years; extension of the deadline for 2025 statutory accounts; auditor appointment; votes of 220,406,311 Class A and 33,491,883 Class B shares at 31 March 2026 · Accessed 30 Oct 2026↩︎
  42. 42NBIS daily chart feed, Yahoo Finance (opens in a new tab)PriceYahoo Finance · 30 Oct 2026 · Cross-check: close on 2026-10-30 = $154.14; 52-week range $73.52 to $299.86 intraday · Accessed 30 Oct 2026↩︎
  43. 43Situational Awareness LP and others, Schedule 13G on Nebius Group N.V. (opens in a new tab)FilingSEC EDGAR · 27 May 2026 · Event date 19 May 2026; Class A 12,410,060 shares, 5.6% of 220,406,311 shares outstanding at 31 March 2026; accession 0000935836-26-000303 · Accessed 31 Oct 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or a growth assumption.

The price

Close in Q4 2026: $154.14, from Nasdaq, cross-checked against the Yahoo Finance chart feed [1][42]. Retrieved in Q4 2026. The fiscal year is the calendar year. Third-quarter results come after the price date, so the latest twelve months are the four quarters to 30 June 2026. Nebius reports in US dollars, so no currency conversion is needed. The listed security is the Class A ordinary share. Per-share values use the 30 June share count of 271.9M, the 15.8M shares issued in August, the 21.1M behind NVIDIA’s pre-funded warrant, 2.7M unvested Eigen shares, 6.2M restricted share units and 6.7M options at an average strike of $88.65 by the treasury method, plus the shares behind any convertible note whose conversion price is below the value per share.

The valuation

An owner-cash model by the megawatt from the second half of 2026 to 2041, then a terminal value on growth in perpetuity of 2.0%, 3.0% and 3.5% in the bear, base and bull cases, discounted at 12% with each year’s cash at mid-year. Revenue from each batch of servers is its cost times the stated income on cost, divided by the cash margin; servers earn full price for five years and 60% in a sixth, then are replaced; buildings are written off over twenty years. Tax is 23% after losses carried forward. Equipment is paid half in the year before it is installed and half in the year, except that the 2026 guidance is taken to pay for a quarter of the 2027 builds. Stock pay and overheads are charged against cash. Customer prepayments of $6.0B are deducted as debt, convertible notes are deducted at carrying value until the share price passes their conversion price, and investments of $1.6B are added. The year-5 and year-10 values roll net debt forward at 12% with no new shares. The balance sheet is that of 30 June 2026, adjusted for the August notes and exchange. The odds in Section VI are my guesses and are not used in the values, except that the weighted value of $171 uses 25%, 50% and 25%.

The margin-of-safety price is $10, set from my bear case. No rating: the page states a range and the price, and leaves the decision to the reader.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.