Investing№ 80Nasdaq: IREN

IREN

IREN builds data centers and rents AI computing power to Microsoft and NVIDIA; FY2026 revenue was $707.0M, only $128.8M from AI, with $13.8B of spending already committed.

Updated Fiscal year ends 30 June30 min readPedrum Shokouhi

Can be disrupted

Research, not investment advice. Figures as of .

Key numbers

  • Revenue$707.0M (reported)FY2026; AI cloud $128.8M, bitcoin $578.2M [2]
  • Net loss−$702.6M (reported)FY2026, after $638.8M of impairments [2]
  • Owner free cash flow−$2.4B (calculated)FY2026, after capital and stock pay; −$4.3B without prepayments [2]
  • Contracted value$16.6B (reported)Revenue obligations and leases, 30 June 2026 [2]
  • Commitments$13.8B (reported)Not yet paid, 30 June 2026 [2]
  • Shares404.6M (reported)28 September 2026; 7.4 times the count in 2022 [3][4]

The answer

  1. IREN builds data centers and rents AI computing power to Microsoft, NVIDIA and AI developers; in the year to 30 June 2026 revenue was $707.0M, only $128.8M of it from AI, and the net loss was $702.6M, mostly the write-off of bitcoin machines.2
  2. I value it at $21 a share, in a range of $0 to $141, because most of its assets are paid for with borrowed money or customer prepayments, so a 5% change in what each megawatt earns moves my value by about $14 a share, nearly as much as the price (estimate).2
  3. At $23.95 the price is 15% above my base value and needs each megawatt to earn about 1% more than my base assumes; I see no price with a margin of safety, because in my bear case the shares are worth nothing (estimate).1

Six questions, one line each

Why
Microsoft, NVIDIA and AI developers have signed about $16.6B of contracts for computing power IREN has not yet fully built, and IREN has raised $7.2B of debt and $4.7B of equity in one year to build it.2 →
The moat
Grid power for about 5GW is scarce and slow to get, but the computers on top of it are not scarce, and the largest contract earns about half the price of the newest ones (calculated).25 →
The advantage
It owns the land, power, building and computers, so it can deliver fast: Horizon 1 reached Microsoft in August 2026, ahead of the later three.6 →
Management
The two co-founders hold 13.2M shares each and were granted 9.1M more units each in June 2026, worth $275.9M apiece at grant, in place of any other equity until fiscal 2031.3 →
Margin of safety
None. My bear value is zero, so three quarters of it is zero, and no price is safe against it (estimate). →
The price
$23.95 at the close in Q4 2026, 15% above my base value, 83% below my bull case, and 69% below the November 2025 high (calculated).17 →

The business

IREN rents out AI computing power. It owns the land, the electricity connection, the building and the graphics processors inside it, and it sells time on them to companies that train and run AI models.2 The filing calls this three layers: data centers, compute and software. Until this year it was known for something else. IREN, formerly Iris Energy, was founded in 2018 as a bitcoin miner with data centers in British Columbia and later Texas, and bitcoin still made 82% of revenue in fiscal 2026 ($578.2M of $707.0M).2 It plans to finish replacing the bitcoin machines with AI hardware by the end of December 2026.2

The fiscal year ends on 30 June. IREN lists on Nasdaq and is incorporated in Australia. It filed annual reports on Form 20-F under international accounting standards until fiscal 2024, then switched to the US domestic form, the 10-K, and US accounting rules from fiscal 2025.89 That matters for this page in two ways. The audited history is short, five years, so I cannot show ten. And the figures before fiscal 2025 come from a different accounting rulebook, which I mark where it matters.

Revenue by source

Fiscal years ending 30 June, US$ millions

  • Bitcoin mining $578.2M
  • AI cloud $128.8M
Revenue by sourceRevenue by fiscal year, FY2022 to FY2026: bitcoin mining and AI cloud. Total revenue rose from $59.0M to $707.0M. AI cloud was $16.4M in FY2025 and $128.8M in FY2026.$0$200M$400M$600M’22’23’24’25’26Bitcoin mining, FY2022: $59MBitcoin mining, FY2023: $76MBitcoin mining, FY2024: $187MBitcoin mining, FY2025: $485MBitcoin mining, FY2026: $578MAI cloud, FY2022: $0MAI cloud, FY2023: $0MAI cloud, FY2024: $0MAI cloud, FY2025: $16MAI cloud, FY2026: $129MRevenue by sourceRevenue by fiscal year, FY2022 to FY2026: bitcoin mining and AI cloud. Total revenue rose from $59.0M to $707.0M. AI cloud was $16.4M in FY2025 and $128.8M in FY2026.$0$200M$400M$600M’22’23’24’25’26Bitcoin mining, FY2022: $59MBitcoin mining, FY2023: $76MBitcoin mining, FY2024: $187MBitcoin mining, FY2025: $485MBitcoin mining, FY2026: $578MAI cloud, FY2022: $0MAI cloud, FY2023: $0MAI cloud, FY2024: $0MAI cloud, FY2025: $16MAI cloud, FY2026: $129MRevenue by sourceRevenue by fiscal year, FY2022 to FY2026: bitcoin mining and AI cloud. Total revenue rose from $59.0M to $707.0M. AI cloud was $16.4M in FY2025 and $128.8M in FY2026.$0$200M$400M$600M’22’23’24’25’26Bitcoin mining, FY2022: $59MBitcoin mining, FY2023: $76MBitcoin mining, FY2024: $187MBitcoin mining, FY2025: $485MBitcoin mining, FY2026: $578MAI cloud, FY2022: $0MAI cloud, FY2023: $0MAI cloud, FY2024: $0MAI cloud, FY2025: $16MAI cloud, FY2026: $129M
FY2022 and FY2023 revenue was all bitcoin mining. FY2022 is IFRS from the 20-F; later years are US GAAP. Source 10-K FY2026; 10-K FY2025; 20-F FY2024; 20-F FY2022 [2][9][8][4]. Figures as reported.
Show the numbers
Revenue by source
FY2022FY2023FY2024FY2025FY2026
Bitcoin mining (reported)$59M$76M$187M$485M$578M
AI cloud (reported)$0M$0M$0M$16M$129M

What it sells

Customers rent a cluster of graphics processors, called GPUs, in a data center IREN runs. Most rent them as bare metal, meaning the raw machines with no software on top, under contracts of three to five years that fix the capacity, the price and the date of delivery. Many pay part of the price in advance.2 Revenue starts only after the machines are delivered, tested and accepted. That is the first thing to understand about the numbers: the revenue is signed long before it exists, and it only begins when a very large construction job is done.

How large the job is shows in the Microsoft contract. In November 2025 IREN agreed to give Microsoft GPU services in four stages at its Childress, Texas site, a total of about 200MW of computing load, for about $9.7B over a five-year average term.210 A megawatt of IT load (MW) is the electricity the computers themselves draw, before cooling, and it is the unit the industry prices by. Dell is supplying the machines under a purchase agreement of about $5.8B.10 So the machines cost about $29M per MW, and the contract pays about $9.7M per MW each year (calculated). At that price the machines pay for themselves in a little over three years, before the building. Horizon 1, the first 50MW, was delivered to and accepted by Microsoft in August 2026. Horizons 2 to 4 are due between the fourth quarter of 2026 and the second quarter of 2027, with grace periods in the contract.26

Other contracts are priced higher. In May 2026 NVIDIA signed a five-year, $3.4B contract for its own AI work. In July 2026 three AI developers, Prometheus, Perplexity and Together AI, signed about $2.8B between them. In August a frontier AI lab signed a further contract whose size is not given.25 IREN says recent three-year contracts bring more than $20M of revenue per MW a year, about a two-year payback on the machines, and that it is in talks at about $25M.5 Together the signed contracts and leases come to about $16.6B, of which $5.1B counts as unsatisfied revenue obligations and $11.4B as leases.2 Management says $4B of annual run-rate revenue is contracted for 2026 capacity, and $1B was operating on 26 August.5 I divide the $4B by the 300MW of IT capacity IREN targets for the end of 2026 and get $13.3M per MW (calculated), between the Microsoft price and the newer ones.

The size of the build

IREN had about 40MW of AI capacity operating at 30 June 2026. It targets 0.3GW of IT capacity delivered cumulatively in 2026 and 0.8GW in 2027, and says it holds grid connection agreements or equivalents for about 5GW across the United States, Canada, Spain and Australia.25 The announced projects are Childress (750MW), Sweetwater 1 and 2 (2,000MW together) and Kiowa, Oklahoma (1,600MW) in the United States; Bundey in South Australia (800MW); Badajoz in Spain (300MW, bought with Nostrum in June 2026); and three sites in British Columbia (160MW together).2 Gross megawatts include cooling and losses, so the IT figures above are smaller.

The company said it had $14B of cash, committed GPU financing and customer prepayments against its plans, and at 30 June it had commitments of $13.8B, up from $0.4B a year earlier.52 The cash at that date was $5.9B, plus $1.7B restricted for the Microsoft financing.2 The market value of the whole company, at $23.95, is about $9.7B on the 404.6M shares outstanding, or $11.0B counting restricted units and notes that convert (calculated).13 Against the $13.8B it has committed to spend, that is the first fact to keep in mind: the company is about to spend more than its market value, mostly on borrowed money.

Who owns it

The two co-founders and co-chief executives, Daniel and William Roberts, each hold 13.2M ordinary shares, 3.22% each, and one B Class share each.3 Each B Class share carries 15 votes for every ordinary share its holder owns, which gives each brother 19.76% of the votes and the two together 39.5% (calculated). The B Class shares must be redeemed by 17 November 2033, or earlier if the holder leaves the board.3 Goldman Sachs and Bank of America each reported more than 5% in filings dated August 2026; bank filings like these can include client and trading positions.3 Of named funds, Situational Awareness LP, run by Leopold Aschenbrenner, held 9,474,099 IREN shares worth $433.3M at 30 June 2026, according to its Form 13F-HR filed 14 August 2026.11 I give that as a dated fact only. The filing shows no shorts or non-US holdings, and it says nothing about what the fund has done since. The shares were $45.73 on that date, so the price has fallen 48% since (calculated).1

The moat

A durable business keeps rivals from taking its profits. For IREN the test is what rivals cannot copy, and what they can. The evidence points two ways, and the answer differs by layer.

What is hard to copy

Electricity. A 100MW data center needs a utility to agree to deliver 100MW, and that takes years of studies, substations and permits. The 10-K says IREN holds executed grid connection agreements, letters of agreement or equivalents for about 5GW.2 The phrase "or equivalents" is worth noticing: not all of that 5GW is a signed right to take power, and the filing does not say how much is. Even so, power at this scale is the slowest thing to build, and the one IREN started on earliest. British Columbia now limits new electrical capacity for data centers through a process run by BC Hydro, which raises the value of the 160MW IREN already holds there and shuts that door to newcomers.2

The second is speed of delivery. Horizon 1 was built, filled with machines, tested and accepted by Microsoft between the first Dell deliveries, scheduled from March 2026, and acceptance in August 2026.610 NVIDIA tested the GB300 NVL72 cluster there and named IREN an Exemplar Cloud provider.6 That is a record few have, and it is what buyers pay for when computing is short.

What is not

The GPUs. IREN buys them from NVIDIA, AMD and server makers such as Dell, on the same terms as its rivals, and says in the 10-K it sources from a limited number of suppliers.2 The software layer is thin: it bought Mirantis in August 2026, for 12.6M shares and about $40M, to add it.12 A tenant can leave when a contract ends. Prices fall as new GPUs arrive; the 10-K warns that older machines may rent for less.2 The competitors it names are the large clouds, Amazon, Google, Microsoft and Oracle, and the specialists, CoreWeave and Nebius among them.2

The price paid shows how thin the protection is. Microsoft pays about $9.7M per MW a year, and the newest contracts above $20M. Same company, same year, the same kind of machine. If scarcity made the price, Microsoft would not have it for half. The gap says that buyers with the most credit negotiate hard, and that the price IREN gets depends on who is buying, not on a right IREN holds (estimate).

My view: the power is the protection, and the rest is execution. That is worth something, because power takes years, but the gain is the ability to build, not the right to earn a high price. In the filings I find no sign yet of the kind of pricing power, such as price increases with customers staying, that real protection would show. The pricing in the newest contracts is higher, and I give weight to that, but it comes in a market where computing is short, and shortages end.

The competitive advantage

The honest question is what IREN does better than other builders of AI data centers, and whether the difference shows in the numbers. There are three candidates.

Owning every layer. IREN designs and builds its own data centers rather than leasing space. The filing argues that ownership avoids termination rights, profit sharing and price changes that come with colocation.2 That is real for a tenant that needs a ten-year plan. It also means IREN carries the construction risk, the equipment risk and the financing risk of all three layers. The data center layer is the one that lasts; the buildings are depreciated over 20 years, and the GPUs over five.2

Starting early. The company converted from bitcoin to AI while others were still debating it. By June 2026 it had $2.0B of GPU hardware on the balance sheet and $3.7B of construction in progress.2 The early start explains why it had power and sites ready when Microsoft came. It also leaves it with $639M of impairments on stranded bitcoin equipment and data center parts in fiscal 2026, because the air-cooled halls built for mining have to be rebuilt for liquid-cooled GPUs.2 The advantage of starting early was paid for in a write-off.

Financing. IREN is unusually inventive here. It borrowed $3.6B against the Microsoft contract at an average of 6.0%, which with customer prepayments covers 96% of the machines' cost, according to the company.5 For customers with weaker credit it raised $2.4B at a fixed 9.0% from Blue Owl and PIMCO-advised investors, covering 90% of the machines at Mackenzie.5 Prepayments from customers have been 45% to 55% of GPU spending in recent contracts.5 The rate difference shows how lenders rank the buyers: Microsoft at 6%, the others at 9%. I count this as a real skill, and a real cost. The skill is turning a signed contract into debt. The cost is that the debt falls on the project only so far: the parent has guaranteed the machines' cost if Microsoft validly terminates a tranche and no replacement customer is found, and has guaranteed hedge payments and the data center's performance.2

The evidence in the numbers

Revenue per MW is the clearest test. The older, mixed book earns about $13.3M per MW, and the newest contracts above $20M, according to the company.5 If the newest contracts hold, IREN's building skill is turning into price. If they do not, the advantage is only that IREN could build at all. The next several quarters of acceptance and billing will show which, and I list the indicators in Section VII.

NVIDIA appears in four roles at once: supplier of the machines, partner (IREN is an NVIDIA Cloud Partner and Preferred Partner), customer ($3.4B contract), and potential investor, with a right to invest up to $2.1B in IREN shares conditional on delivery of up to 600,000 GPUs.2 A buyer that also supplies and invests deserves care. The contract may be good for both. It also means that part of IREN's demand is funded by the company whose machines it buys (estimate).

Management

Daniel and William Roberts, brothers, founded the company in 2018 and run it as co-chief executives. A separate independent chair, David Bartholomew, sits above them.3 The board is divided into three classes, except the founders, who hold their seats as founder directors.3 I judge managers by three things: how they are paid, how much of their own money is in, and what they did with other people's money.

How they are paid, and what that pays them to do

Each brother's total pay in fiscal 2026 was about $50M ($49.9M and $50.0M), against $114,400 for the median employee, a ratio of 436 to 1.3 Nearly all of it is stock. In 2025 the board gave them time-based and share-price-based units. The price hurdles ran from $20 to $50 on a 30-day average, set against a 60-day average of $7.72 at grant. All six were reached by October 2025, and each brother earned 1,844,862 units on the way up.3 Another 1,844,862 time-based units each vest through June 2031.3

On 30 June 2026 the board went further. It granted each brother 9,099,328 time-based units, with an accounting value of $275.9M each, vesting in four yearly parts with a further two-year holding period after each. The grants replace any other long-term equity for them until fiscal 2031.3 The proxy says the awards, with the 2025 grants, come to about 3% of the company each, in line with a set of 28 founder-led companies the board's consultant reviewed.3 I read the structure plainly. It pays them for staying and for the share price rising. It does not pay for return on capital, for cash per share or for avoiding dilution, and the units themselves add to the share count. A fixed grant that cannot change for four years also means the board has no later lever. The two-year holds after vesting are the part that ties them to the share price after they have been paid, and I count that in their favour.

Their own money

Each brother holds 13,189,713 shares, 3.22% of the ordinary shares, which at $23.95 is about $316M each (calculated).31 That is a large stake, and it is real, but a fair comparison is what they took out. In September 2025 each sold vested options through trusts to B. Riley for about $24.5M, and the company helped to arrange it.3 That is about 8% of the value of the stake each now holds. I do not read that as a signal either way; options have to be exercised and paid for.

What they did with capital

The record is short and it is entirely a growth record, so I describe it by facts.

  • Shares. The count rose from 55.0M at 30 June 2022 to 404.6M at 28 September 2026.43 Under the at-the-market plan IREN sold 47.2M shares for about $2.5B, an average of $53 a share, and it has up to $6.0B of such sales authorised.2 In December 2025 it sold 39.7M shares at $41.12 in a registered direct offering.2 Those prices are well above today's $23.95. Whatever one thinks of the dilution, the company sold into strength, and the cash it took in is in the bank or in the buildings.
  • Debt. It issued $6.3B of convertible notes in the year, at coupons between 0% and 1%, with conversion prices from $51.40 to $85.63, and $525M of senior notes and $413M of bank loans have been drawn for the Microsoft GPUs.2 The low coupon comes at a cost: when the share price is above the conversion price the holders share in the gain, and IREN paid $448.9M for capped call contracts to offset part of that.2 In December 2025 it paid $1.63B to retire $544.3M of older 2029 and 2030 notes, an inducement that cost a $111.8M expense in the year.2
  • Acquisitions. It bought Nostrum (Spain) in June 2026 for 837,424 shares and about EUR 82M, and Mirantis in August for 12.6M shares and about $40M, a total of about $544M.2
  • Write-offs. It wrote off $638.8M in fiscal 2026, mostly bitcoin hardware, and a further $110.6M on the fall in value of machines held for sale.2

Overall the pattern is of an operator that moves fast and raises capital when it can, and a company in which the people running it are paid mostly in stock. That is a combination that has done well while the share price rises and is untested when it falls.

Financials

The audited record is five years: IREN listed on Nasdaq in November 2021.4 Ten years of results do not exist, so I show five and the model starts from the latest balance sheet instead. Figures for fiscal 2022 are under international standards and later years under US standards, which changes net income only a little for fiscal 2023 and 2024 ($171.9M and $28.9M losses against $171.8M and $28.9M).89

Five years in one table

US$ millions, fiscal years ending 30 June.

Five-year history
FY2022FY2023FY2024FY2025FY2026
Revenue (reported)$59M$76M$187M$501M$707M
Net income (reported)−$420M−$172M−$29M$87M−$703M
Cash from operations (reported)$22M$6M$52M$246M$2,100M
Total investing outflow (reported)$318M$72M$498M$1,380M$4,723M
Stock-based compensation (reported)$14M$14M$24M$43M$205M
Depreciation and amortization (reported)$8M$31M$50M$181M$418M
Shares at 30 June (reported)55.0M66.7M187.9M258.1M380.2M
FY2022 is IFRS; later years US GAAP. The investing outflow includes disposals and acquisitions, so it is not the same as capital spending. Source 10-K FY2026; 10-K FY2025; 20-F FY2024; 20-F FY2023; 20-F FY2022 [2][9][8][13][4]. Figures as reported.

Revenue went up 12 times in four years and the company lost money in four of the five years. The one profit, $86.9M in fiscal 2025, includes a $77.5M unrealized gain on financial instruments.9 Fiscal 2026 is easy to misread. The net loss of $702.6M fell mostly from non-cash lines: $638.8M of impairments, a $110.6M fall in the value of machines held for sale, $111.8M of inducement cost on the note repurchase, and a $558.5M gain on the value of capped calls that went the other way.2 Adjusted EBITDA, the company's own measure, was $245.7M against $269.7M a year earlier, so on that measure profit fell as revenue rose 41%.5 The cause is cost running ahead of revenue: selling, general and administrative costs rose from $136.5M to $449.1M, of which $162.4M was extra stock pay and $52.8M extra payroll tax on stock awards.2 AI revenue was $128.8M against $16.9M of direct cost, and the year's $417.7M of depreciation covers both businesses.2

Net income and cash from operations

US$ millions

  • Net income −$702.6M
  • Operating cash flow $2,100.4M
Net income and cash from operationsNet income and operating cash flow by fiscal year. FY2026 net loss $702.6M, after $638.8M of impairments, while operating cash flow was $2,100.4M, of which $1,841.7M was customer prepayments.−$500M$0$500M$1000M$1500M$2000M’22’23’24’25’26Net income, FY2022: −$420MNet income, FY2023: −$172MNet income, FY2024: −$29MNet income, FY2025: $87MNet income, FY2026: −$703MOperating cash flow, FY2022: $22MOperating cash flow, FY2023: $6MOperating cash flow, FY2024: $52MOperating cash flow, FY2025: $246MOperating cash flow, FY2026: $2,100MNet income and cash from operationsNet income and operating cash flow by fiscal year. FY2026 net loss $702.6M, after $638.8M of impairments, while operating cash flow was $2,100.4M, of which $1,841.7M was customer prepayments.−$500M$0$500M$1000M$1500M$2000M’22’23’24’25’26Net income, FY2022: −$420MNet income, FY2023: −$172MNet income, FY2024: −$29MNet income, FY2025: $87MNet income, FY2026: −$703MOperating cash flow, FY2022: $22MOperating cash flow, FY2023: $6MOperating cash flow, FY2024: $52MOperating cash flow, FY2025: $246MOperating cash flow, FY2026: $2,100MNet income and cash from operationsNet income and operating cash flow by fiscal year. FY2026 net loss $702.6M, after $638.8M of impairments, while operating cash flow was $2,100.4M, of which $1,841.7M was customer prepayments.−$500M$0$500M$1000M$1500M$2000M’22’23’24’25’26Net income, FY2022: −$420MNet income, FY2023: −$172MNet income, FY2024: −$29MNet income, FY2025: $87MNet income, FY2026: −$703MOperating cash flow, FY2022: $22MOperating cash flow, FY2023: $6MOperating cash flow, FY2024: $52MOperating cash flow, FY2025: $246MOperating cash flow, FY2026: $2,100M
FY2026 operating cash flow includes a $1,841.7M rise in deferred revenue from customer prepayments, which is cash received for service not yet given. Source 10-K FY2026; 10-K FY2025; 20-F FY2024; 20-F FY2022 [2][9][8][4]. Figures as reported.
Show the numbers
Net income and cash from operations
FY2022FY2023FY2024FY2025FY2026
Net income (reported)−$420M−$172M−$29M$87M−$703M
Operating cash flow (reported)$22M$6M$52M$246M$2,100M

Cash is not profit

Fiscal 2026 operating cash flow was $2,100.4M, and the net loss was $702.6M. The difference is $1,841.7M of customer prepayments, recorded as deferred revenue.2 That is real cash, but it is a down payment on service not yet given. I do not treat it as earnings, and in my valuation I subtract it as a debt-like claim: the revenue it pays for is in my cash flows, so counting the cash too would count it twice.

What an owner could take out

US$ millions. Capital spending is property, plant and computer hardware payments; stock pay is the stock-based compensation expense.

  • Cash from operations $2,100M
  • Capital spending and stock pay $4,538M
What an owner could take outOperating cash flow less capital spending less stock pay, FY2024 to FY2026. It was −$451M in FY2024, −$1,170M in FY2025 and −$2,438M in FY2026.$0$1500M$3000M$4500MFY2024FY2025FY2026Cash from operations, FY2024: $52MCash from operations, FY2025: $246MCash from operations, FY2026: $2,100MCapital spending and stock pay, FY2024: $504MCapital spending and stock pay, FY2025: $1,415MCapital spending and stock pay, FY2026: $4,538MWhat an owner could take outOperating cash flow less capital spending less stock pay, FY2024 to FY2026. It was −$451M in FY2024, −$1,170M in FY2025 and −$2,438M in FY2026.$0$1500M$3000M$4500MFY2024FY2025FY2026Cash from operations, FY2024: $52MCash from operations, FY2025: $246MCash from operations, FY2026: $2,100MCapital spending and stock pay, FY2024: $504MCapital spending and stock pay, FY2025: $1,415MCapital spending and stock pay, FY2026: $4,538MWhat an owner could take outOperating cash flow less capital spending less stock pay, FY2024 to FY2026. It was −$451M in FY2024, −$1,170M in FY2025 and −$2,438M in FY2026.$0$1500M$3000M$4500MFY2024FY2025FY2026Cash from operations, FY2024: $52MCash from operations, FY2025: $246MCash from operations, FY2026: $2,100MCapital spending and stock pay, FY2024: $504MCapital spending and stock pay, FY2025: $1,415MCapital spending and stock pay, FY2026: $4,538M
The gap in FY2026 is −$2,438M counting prepayments, and about −$4,280M without the $1,842M of prepayments (calculated). Source 10-K FY2026; 10-K FY2025 [2][9]. Calculated from reported figures.
Show the numbers
What an owner could take out
FY2024FY2025FY2026
Cash from operations (calculated)$52M$246M$2,100M
Capital spending (calculated)$480M$1,373M$4,333M
Stock pay (calculated)$24M$43M$205M
Owner cash (calculated)−$451M−$1,169M−$2,438M

What an owner can take out is operating cash flow, less the machines and buildings that must be bought, less the stock paid to staff. For fiscal 2026 that is −$2,438M counting the prepayments, and about −$4,280M without them (calculated). In the three years from fiscal 2024 the total is about −$4.1B (calculated). Reported earnings, in the best year, were $86.9M. The two have not been close, and for a business that is building, they are not expected to be: the capital is going in ahead of the revenue. What matters is when they meet, and my model, in Section VI, has them meeting in fiscal 2030.

Shares outstanding

Millions of ordinary shares

  • Shares, 28 September 2026 404.6M
Shares outstandingOrdinary shares outstanding rose from 55.0M at 30 June 2022 to 404.6M at 28 September 2026, a factor of 7.4.0100M200M300M400M’22’23’24’25’26Sep ’26Shares, FY2022: 55.0MShares, FY2023: 66.7MShares, FY2024: 187.9MShares, FY2025: 258.1MShares, FY2026: 380.2MShares, Sep 2026: 404.6MShares outstandingOrdinary shares outstanding rose from 55.0M at 30 June 2022 to 404.6M at 28 September 2026, a factor of 7.4.0100M200M300M400M’22’23’24’25’26Sep ’26Shares, FY2022: 55.0MShares, FY2023: 66.7MShares, FY2024: 187.9MShares, FY2025: 258.1MShares, FY2026: 380.2MShares, Sep 2026: 404.6MShares outstandingOrdinary shares outstanding rose from 55.0M at 30 June 2022 to 404.6M at 28 September 2026, a factor of 7.4.0100M200M300M400M’22’23’24’25’26Sep ’26Shares, FY2022: 55.0MShares, FY2023: 66.7MShares, FY2024: 187.9MShares, FY2025: 258.1MShares, FY2026: 380.2MShares, Sep 2026: 404.6M
Not counted: 26.2M restricted units and options, and about 127M more shares if every convertible note converted at its price (calculated). Source 20-F FY2022; 20-F FY2023; 20-F FY2024; 10-K FY2025; 10-K FY2026; proxy [4][13][8][9][2][3]. Calculated from reported counts.
Show the numbers
Shares outstanding
FY2022FY2023FY2024FY2025FY2026Sep 2026
Shares (reported)55.0M66.7M187.9M258.1M380.2M404.6M

What is owed

The balance sheet at 30 June 2026 was $15.8B of assets and $11.6B of liabilities.2 Here is every claim ahead of the shares, from the filing.

What stands ahead of the shares

US$ millions at 30 June 2026.

Claims at 30 June 2026
Item30 June 2026Note
Cash (reported)5,895.6Unrestricted
Restricted cash (reported)1,723.9Mostly set aside for the Microsoft financing
Convertible notes (reported)6,745.7Principal, six series; 2029 to 2033
GPU Financing drawn (reported)938.0$413M bank loan, $525M senior notes; $2,707M more committed
Finance leases (reported)243.8Mostly GPUs
Deferred revenue (reported)1,842.5Customer prepayments
Accounts payable and accrued (reported)1,825.4Mostly construction
Commitments, not yet paid (reported)13,810.0Hardware and site development
Notes show only what the filing says. Cash is not offset against the commitments. Source 10-K FY2026 balance sheet; MD&A; Notes 20, 22, 23 [2]. Figures as reported.

The convertible notes need explaining. They are bonds that holders can swap into shares at a set price. Four series, $6.3B of the $6.7B, convert at $51.40 to $85.63, far above $23.95. The 2029 and 2030 series, about $446M now after the repurchase, convert at $13.64 and $16.81, so they are worth more as shares: that is about 29.7M shares, which I count as shares and not as debt (calculated).2 At my bull value all six series would convert, adding about 100M shares.

The share price since listing

Last close of each calendar quarter, log scale: each gridline is ten times the one below

  • Close, Q4 2026 $23.95
The share price since listingQuarter-end closes on a log scale, from $16.17 to $23.95. The highest close was $76.41 on 5 November 2025.$1$10$100’22’23’24’25’26The share price since listingQuarter-end closes on a log scale, from $16.17 to $23.95. The highest close was $76.41 on 5 November 2025.$1$10$100’22’23’24’25’26The share price since listingQuarter-end closes on a log scale, from $16.17 to $23.95. The highest close was $76.41 on 5 November 2025.$1$10$100’22’23’24’25’26
The stock has fallen 69% from its closing high of $76.41 and 48% from $45.73 on 30 June 2026 (calculated). Source Nasdaq historical [1]. Calculated from reported closes.

Valuation

First, how this goes badly wrong

Before any number, I ask what would most likely destroy the investment, and work backward. For IREN there are three ways.

The price of computing falls, and the debt does not. Each megawatt costs about $46M to build and earns, in my base, about $15.7M a year in cash for three years and about $10.2M for the next two (estimate). If the price a megawatt earns is 10% lower on new contracts, my model gives the shares a negative value, because the loans come due at the same amount (calculated). GPU rental prices have a history of falling as new chips arrive, and the 10-K says so.2

The money runs out before the cash arrives. In my base IREN spends $19.6B in fiscal 2027 and $12.9B in fiscal 2028 on buildings and machines, and the cash it makes in those years is $2.7B and $6.7B before tax (estimate). The gap must be borrowed or raised from shareholders. At today's price a $10B share sale would be about 420M new shares, more than doubling the count.

A buyer or a delivery fails. Revenue starts only on acceptance. Delay credits, service credits and termination rights are in the contracts, and some customers are early-stage private companies.2 The Microsoft debt is guaranteed by IREN if Microsoft validly ends a tranche and no replacement is found.2

What an owner can really take out

In fiscal 2026 the company reported a $702.6M loss, which is not what an owner kept; it also reported adjusted EBITDA of $245.7M, which is not either. After stock pay and the capital spent, the owner's number was −$2,438M counting prepayments received (calculated).2 Stock pay is a real cost: $205.0M in the year, with $52.8M more in payroll tax. I deduct stock pay in every year of my model, at $350M in fiscal 2027 and rising 5% a year (estimate). The distance between reported earnings and owner cash is large and it will stay large until the building slows.

What I cannot judge

Three inputs cannot be known: the price a megawatt will earn in 2029 and after; whether GPUs bought now keep their value for five years or three; and how much of this the capital markets will finance. I can say what each does to value, and I show the range instead of a single number. The range is wide: bear $0, base $21, bull $141. I do not think a narrower range would be honest.

The model in plain words

I model the business as a fleet of megawatts. A cohort of 300MW (IT load) is the 2026 capacity already contracted. After that I add megawatts each year. Every megawatt costs the machines, $36M, and the building and power connection, $10.5M (estimate). Revenue per megawatt starts at $19.0M a year for the newer contracts, falls 4% for each later year's vintage as rivals catch up, and drops to 65% of that in the two years after a three-year contract ends. After five years the machines are replaced. Costs are 12% of revenue plus corporate cost of $400M a year, stock pay is deducted as a cost, and tax is 22% once the early losses are used. I discount the cash flows of the 2026 contracts at 8%, close to the 6.0% to 9.0% IREN pays on contract-backed debt, and everything else at 11%.5 Cash flows after fiscal 2036 are valued as a steady fleet growing 2% a year.

What each case assumes

Fiscal years ending 30 June. All are my estimates.

Case assumptions
AssumptionBearBaseBull
Megawatts (IT) built by FY2036 (estimate)6001,8002,700
Revenue per MW a year, new contracts (estimate)$15M$19M$21M
Price drift per vintage year (estimate)−8%−4%0%
Share of price in years 4 and 5 (estimate)50%65%75%
Use of capacity (estimate)92%94%97%
Machines per MW (estimate)$36M$36M$37M
Building and power per MW (estimate)$12M$10.5M$10M
FY2027 revenue (estimate)$2.0B$2.4B (total $3.3B)$3.0B
Revenue per MW is cash revenue on IT load. IREN says recent three-year contracts exceed $20M. Cohort 0 revenue is $13.3M (base) from the $4B of contracted run-rate on 300MW. Source FY26 results release; 10-K FY2026 [5][2]. Assumptions are my estimates.

The reason the model is a megawatt model is that it matches the way the company contracts and spends. The next table shows what one megawatt does in my base.

One megawatt in my base

US$ millions per MW of IT load.

One megawatt
ItemValue
Machines (estimate)36.0
Building and power (estimate)10.5
Cash revenue a year, years 1 to 3 (estimate)17.9
Cash profit a year, years 1 to 3 (estimate)15.7
Cash profit a year, years 4 and 5 (estimate)10.2
Cash profit over five years (calculated)67.6
Cost to build (calculated)46.5
Value of one five-year cycle of machines, at 11% (calculated)17.9
The cycle value counts machines only. The building lasts 20 years and earns after the first cycle, which is why the long-run value is large. Source My model [5][2]. Estimates and calculations.

Over five years one megawatt earns $68M and costs $46M, so the first cycle roughly repays the money and the gains come later, from the second and third cycles on the building already paid for (calculated). That is a long wait with cash flowing out to build while the first cycle is still repaying. It is why the ten-year cash flow in my base totals −$17.5B and more than all of the value is in what the fleet earns after fiscal 2036.

Revenue in my three cases

US$ billions a year, fiscal years: bear to bull, with the base marked

  • Bear to bull $7B to $47B at the peak
  • Base, FY2036 $19B
Revenue in my three casesBase revenue rises from $0.7B in FY2026 to $13B in FY2029 and $19B in FY2036. Bear peaks at $7B. Bull reaches $47B.$0$10B$20B$30B$40B$50B’26’28’30’32’34’36Base, FY2026: $0.7BBase, FY2027: $3.3BBase, FY2028: $8.1BBase, FY2029: $12.7BBase, FY2030: $15.8BBase, FY2031: $15.4BBase, FY2032: $18.0BBase, FY2033: $19.2BBase, FY2034: $20.4BBase, FY2035: $19.7BBase, FY2036: $19.4BRevenue in my three casesBase revenue rises from $0.7B in FY2026 to $13B in FY2029 and $19B in FY2036. Bear peaks at $7B. Bull reaches $47B.$0$10B$20B$30B$40B$50B’26’27’28’29’30’31’32’33’34’35’36Base, FY2026: $0.7BBase, FY2027: $3.3BBase, FY2028: $8.1BBase, FY2029: $12.7BBase, FY2030: $15.8BBase, FY2031: $15.4BBase, FY2032: $18.0BBase, FY2033: $19.2BBase, FY2034: $20.4BBase, FY2035: $19.7BBase, FY2036: $19.4BRevenue in my three casesBase revenue rises from $0.7B in FY2026 to $13B in FY2029 and $19B in FY2036. Bear peaks at $7B. Bull reaches $47B.$0$10B$20B$30B$40B$50B’26’27’28’29’30’31’32’33’34’35’36Base, FY2026: $0.7BBase, FY2027: $3.3BBase, FY2028: $8.1BBase, FY2029: $12.7BBase, FY2030: $15.8BBase, FY2031: $15.4BBase, FY2032: $18.0BBase, FY2033: $19.2BBase, FY2034: $20.4BBase, FY2035: $19.7BBase, FY2036: $19.4B
FY2026 is reported. Everything after it is my estimate. Bear revenue falls when contracts end and nothing replaces them. Source 10-K FY2026; FY26 results release [2][5]. Assumptions and values are my estimates.
Show the numbers
Revenue in my three cases
FY2026FY2027FY2028FY2029FY2030FY2031FY2032FY2033FY2034FY2035FY2036
Bear (estimate)$0.7B$2.7B$6.1B$7.4B$6.7B$3.7B$4.9B$5.3B$5.3B$3.5B$2.7B
Base (estimate)$0.7B$3.3B$8.1B$12.7B$15.8B$15.4B$18.0B$19.2B$20.4B$19.7B$19.4B
Bull (estimate)$0.7B$4.5B$11.3B$19.5B$26.4B$31.0B$37.2B$42.0B$46.1B$46.9B$47.4B

Base case: cash an owner keeps or funds

US$ billions, after stock pay, tax and all capital spending

  • Owner free cash flow, FY2027 to FY2029 −$24.8B in total
Base case: cash an owner keeps or fundsBase owner free cash flow by fiscal year, FY2027 to FY2036, US$ billions: −$17.3B in FY2027, positive from FY2030, and −$15.8B in FY2032 when the first GPUs are replaced.−$15B−$10B−$5B$0$5B’27’29’31’33’35Owner free cash flow, FY2027: −$17.3BOwner free cash flow, FY2028: −$6.6BOwner free cash flow, FY2029: −$1.0BOwner free cash flow, FY2030: $3.7BOwner free cash flow, FY2031: $5.9BOwner free cash flow, FY2032: −$15.8BOwner free cash flow, FY2033: −$0.4BOwner free cash flow, FY2034: $2.4BOwner free cash flow, FY2035: $3.8BOwner free cash flow, FY2036: $7.8BBase case: cash an owner keeps or fundsBase owner free cash flow by fiscal year, FY2027 to FY2036, US$ billions: −$17.3B in FY2027, positive from FY2030, and −$15.8B in FY2032 when the first GPUs are replaced.−$15B−$10B−$5B$0$5B’27’28’29’30’31’32’33’34’35’36Owner free cash flow, FY2027: −$17.3BOwner free cash flow, FY2028: −$6.6BOwner free cash flow, FY2029: −$1.0BOwner free cash flow, FY2030: $3.7BOwner free cash flow, FY2031: $5.9BOwner free cash flow, FY2032: −$15.8BOwner free cash flow, FY2033: −$0.4BOwner free cash flow, FY2034: $2.4BOwner free cash flow, FY2035: $3.8BOwner free cash flow, FY2036: $7.8BBase case: cash an owner keeps or fundsBase owner free cash flow by fiscal year, FY2027 to FY2036, US$ billions: −$17.3B in FY2027, positive from FY2030, and −$15.8B in FY2032 when the first GPUs are replaced.−$15B−$10B−$5B$0$5B’27’28’29’30’31’32’33’34’35’36Owner free cash flow, FY2027: −$17.3BOwner free cash flow, FY2028: −$6.6BOwner free cash flow, FY2029: −$1.0BOwner free cash flow, FY2030: $3.7BOwner free cash flow, FY2031: $5.9BOwner free cash flow, FY2032: −$15.8BOwner free cash flow, FY2033: −$0.4BOwner free cash flow, FY2034: $2.4BOwner free cash flow, FY2035: $3.8BOwner free cash flow, FY2036: $7.8B
The bar for FY2027 is cut off at the axis: it is −$17.3B. The money is borrowed or raised from shareholders. Source My model, base case [2][5]. Estimates.
Show the numbers
Base case: cash an owner keeps or funds
FY2027FY2028FY2029FY2030FY2031FY2032FY2033FY2034FY2035FY2036
Owner free cash flow (estimate)−$17.3B−$6.6B−$1.0B$3.7B$5.9B−$15.8B−$0.4B$2.4B$3.8B$7.8B

What I get

The three cases

US$ billions unless stated. Present values at 31 October 2026.

Results
ItemBearBaseBull
Present value of cash to FY2036 (estimate)−$17.2B−$19.4B$2.7B
Present value of cash after FY2036 (estimate)$1.9B$32.4B$73.2B
Enterprise value (estimate)−$15.4B$13.0B$75.9B
Net debt-like claims today (reported)$3.5B$3.5B−$2.8B
Shares counted (calculated)431M461M558M
Model value per share (estimate)−$45$21$141
Value I use per share (estimate)$0$21$141
Net claims are debt, leases, customer prepayments and payables, less cash. The bear shows a negative model value, which I read as zero. In the bull all six convertible series convert. Source 10-K FY2026 balance sheet; my model [2]. Estimates and calculations.

The bear needs explaining. In it, IREN builds only what it has already contracted and a little more, new computing pays less and less, and the first set of machines is not replaced because the numbers no longer justify it. The model then values the shares at −$45, meaning the debts and the cost of finishing exceed the cash the assets would make. Shares cannot be worth less than nothing, so I use $0. It is not a forecast of failure. It says that in a world where prices fall by about a fifth from today's contracts, a company with this much borrowed money has little left for its owners.

The weighted figure, with odds of 30%, 50% and 20% for bear, base and bull, is $39 (estimate). It is above the price only because of the bull case's tail, and I would not lean on it: it asks the reader to believe a one in five chance of the bull.

Reverse DCF: what the price needs

Working backward, $23.95 is what my model gives if each megawatt on new contracts earns about 1.2% more than my base, or equivalently if I discount at 10.8% instead of 11% (calculated). Neither is a large move. That is the point about this stock: the price is close to my base, and my base is a thin amount left after large debts, so small changes in what a megawatt earns separate a zero from a price many times higher. A 5% change in revenue per megawatt is worth $14 a share (calculated).

How the base value moves

Value per share, base case. Rows change revenue per MW on new contracts; columns change the discount rate for uncontracted cash.

Sensitivity
Revenue per MW9%10%11%12%13%
-10% (estimate)$19$3$0 (model below zero)$0 (model below zero)$0 (model below zero)
-5% (estimate)$39$20$6$0 (model below zero)$0 (model below zero)
0% (estimate)$57$37$21$8$0 (model below zero)
+5% (estimate)$74$53$35$21$10
+10% (estimate)$90$67$48$33$21
Cells below zero are shown as $0 with the label. The middle cell is the base. Source My model [5][2]. Estimates.

What it is worth, against the price

Value per share, my estimates, against the close in Q4 2026

  • Bear to bull $0 to $141
  • Base $21
  • Price $23.95
  • Margin of safety below $0
What it is worth, against the priceValue per share: bear $0, base $21, bull $141. Price in Q4 2026: $23.95, 15% above the base value. Margin-of-safety price $0.BEAR$0BASE$21BULL$141Price $23.95What it is worth, against the priceValue per share: bear $0, base $21, bull $141. Price in Q4 2026: $23.95, 15% above the base value. Margin-of-safety price $0.BEAR$0BASE$21BULL$141Price $23.95What it is worth, against the priceValue per share: bear $0, base $21, bull $141. Price in Q4 2026: $23.95, 15% above the base value. Margin-of-safety price $0.Margin-of-safety zone: below $0$0$40$80$120$160Bear to bull: $0 to $141Bear case: $0 per shareBEAR$0Base case: $21 per shareBASE$21Bull case: $141 per shareBULL$141Price in Q4 2026: $23.95Price $23.95Close, Q4 2026
Bear is shown at zero: my model gives a negative equity value, and shares cannot be worth less than nothing. Source Nasdaq historical; 10-K FY2026 [1][2]. Values are my estimates.

The price against the range

At $23.95 the price is 15% above my base value of $21, and 83% below my bull value of $141. It is not a case where the market has a clear mistake to correct. It is a case where the market and I agree that this is a bet on prices staying high enough, and disagree about by how much. I give no weight to a margin of safety: three quarters of a bear value of zero is zero, so there is no price at which the shares are safe against the bear I describe.

The next best use of the same dollar is another page on this site. Oracle, the closest listed company with the same exposure to AI building, has a base value of $122 against a price of $130.67 and a base return of 11.4% a year on my cash flows.14 Rocket Lab, another business that needs outside capital before it earns, returns −8.0% a year at its price.15 IREN's base return, 15.5% a year from $23.95 to year 10 in the next section, is higher than Oracle's, but it comes with a bear of zero and borrowed money. A higher expected return and a worse worst case are not the same bargain (estimate).

Quality and price are separate questions. As a business, IREN has real assets: power rights, buildings, and contracts with some of the best-rated buyers in the world. The quality of the earnings is not yet visible, because they do not yet exist. As a price, $23.95 is about my base value, so the price asks the reader to accept that the base is right and offers no cushion if it is not.

The case needs many things to go right at once, so I multiply it out. Horizons 2 to 4 are delivered on time, 85%. Prices on new contracts hold near $19M per MW, 55%. Lenders keep funding at 9% or better, 75%. The machines last five years, 80%. The odds I give the base are these four together: 28% (estimate). They are not independent, since a strong market helps all four, so I round up to 35%. That is lower than the 50% I use, and I use 50% because the base is also the case where small misses are survivable. The odds that the shares are worth something close to zero are of the same size as the odds that they are worth my base, and the page is best read that way.

Where this could be in 5 and 10 years

Value here is what the model says a share is worth at that date: the present value then of the cash that comes after, less the debt at that date, per today's share count. It assumes every shortfall is borrowed at 9% and none is raised from shareholders.

Value per share in 5 and 10 years

Per today’s share count, in each date’s dollars. All three are estimates of value, not forecasts of the price.

Horizon values
CaseValue in year 5, to October 2031Value in year 10, to October 2036Owner cash paid out per share to October 2036Return a year from today’s price to year 10
Bear (estimate)$0$0$0−100%
Base (estimate)$57$102$015.5%
Bull (estimate)$251$421$033.2%
IREN pays no dividend and the model assumes none, so owner cash paid out is zero. The model’s own cash goes into building. Year-10 base value ties to the page model: the value of cash after fiscal 2036 is the same $88.9B terminal value, discounted to 2036. Source My model [2][5]. Estimates.

For the base to hold at five years, IREN must have delivered most of the 0.8GW it targets by the end of 2027 and be adding about 100MW a year from fiscal 2032. At ten years it must still earn about $19M per megawatt on 2027 contracts, less 4% a year for each later vintage, which means the market for computing has to hold up through two replacements of the machines. The bear and bull differ on those numbers: price per megawatt, megawatts built, and the discount rate. The most likely way the base is wrong is that prices fall faster than my 4% a year, because each generation of chips adds capacity faster than demand grows. Read the table with one fact in mind: the numbers are leveraged. If the shortfall were raised from shareholders at fair value instead of borrowed, the base would be $35 at five years and $59 at ten, a return of 9.4% a year (estimate).

These are estimates of value, not forecasts of the share price, and the price can sit above or below value for years.

The case for the price

What most people miss

Three things cut in IREN’s favour and are easy to overlook. First, the biggest contract is the cheapest one. Microsoft’s $9.7B works out to about $9.7M per MW a year, while IREN says recent three-year contracts pay more than $20M, so the book gets better as old contracts are replaced by new ones, if the new prices hold (calculated).25 Second, customers pay in advance. Prepayments have been 45% to 55% of machine cost in recent contracts, and the Microsoft debt plus prepayments cover 96% of its machines.5 The company is putting in less of its own money per contract than the headline capital figures suggest. Third, the company sold shares and notes at much higher prices than today’s. It sold 39.7M shares at $41.12 and notes convertible at $51.40 to $85.63.2 The money is already raised; what is left to raise is about $2.7B of committed GPU financing and the $3.5B left on the share sale plan.2

The bull case

In plain words: computing is short, power is the shortage underneath it, and IREN has power. Co-CEO Daniel Roberts said on 27 August 2026 that the company’s “2026 capacity is largely sold out”.5 Management says it has about 5GW of power and sites, is in late-stage talks over a significant portion of 2027 capacity, and that discussions for 2028 are moving in parallel with financing.5 NVIDIA, which makes the machines, signed a $3.4B contract and holds a right to invest up to $2.1B.2 Situational Awareness LP held 9,474,099 IREN shares at 30 June 2026, worth $433.3M, according to its 13F filed 14 August 2026.11 That is a dated holding, not a statement of why, and not a view on the price now.

A note on named views. I looked for what the All-In hosts, Gavin Baker and Brad Gerstner have said about IREN and its Microsoft contract, and for interviews and podcasts with Daniel or William Roberts. I found no transcript I could open in which the All-In hosts, Baker or Gerstner discuss IREN. A podcast listing shows a 26 March 2026 All-In episode with four AI company chiefs that includes an IREN executive, but I found only its show notes, so I cannot say what was said, by whom, or at what time. I have left out anything I could not open. Daniel Roberts’s public remarks that I could verify are in IREN’s own releases and filings, which I cite above.

Against reality

Today’s numbers support the first half. IREN delivered Horizon 1 to Microsoft in August 2026 and had $1B of run-rate revenue operating on 26 August, against a $4B target for the end of 2026.65 If it delivers Horizons 2 to 4 on time and the new contracts pay near $19M per MW, my base is possible, and the price is about where it sits (estimate). The distance is large: AI revenue was $128.8M in the year just ended, so the $4B target is 31 times it, and the company must build nearly 260MW more in about six months.25 Its contracts allow for grace periods that run to the second quarter of 2027, which shows the schedule has room built in.2

The bull needs more, and it helps to multiply it out. Delivery on schedule, 85%. New contracts keep pricing near $21M per MW, 40%. Lenders keep funding at 9% or less through 2030, 65%. Machines hold value for five years, 80%. GPU supply keeps up with the pace, 85%. Multiplied: 15% (estimate). They are not independent, so I use 20%. Each step looks likely, but all five together do not.

What a 10x would take. Ten times $23.95 is $239.50, which on about 558M shares, counting every convertible note, is about $134B of equity value (calculated). My bull case, at $141, already has 2.7GW of IT load and $47B of revenue a year by fiscal 2036. A tenfold move needs about 70% more value than that: more megawatts, or more than $21M per MW, or a lower discount rate, and a financing market willing to carry it. The stock has already risen from a $1.06 close to $76.41, and it has since fallen 69%.1 From here, tenfold is possible only if the bull case is understated, and I would not build a case on it.

What they have to hit

Six numbers from regular filings. The thresholds are what the base case needs, and they agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
AI cloud revenue$70.5M in the June 2026 quarter; $128.8M in the year5About $1B a quarter by the June 2027 quarter (estimate)Results release, revenue table; 10-Q income statementFirst-quarter FY2027 results, expected early November 2026; date not announced
Operating run-rate revenue$1B on 26 August; $4B targeted by 31 December5$3.5B or more operating by the March 2027 report (estimate)Results release, ARR line and its footnotesFirst-quarter FY2027 results, expected early November 2026
Microsoft Horizons 2 to 4Horizon 1 accepted in August 20266All four accepted by the end of the second quarter of 2027, with no delay creditsResults release and 10-Q, Microsoft Agreement paragraphNext release; contract grace periods end in the second quarter of 2027
Price on new contractsMore than $20M per MW for recent three-year contracts5Average of $17M or more per MW on 2027 contracts (estimate)Results release, pricing per MW lineEach quarterly release
Cost of new financing6.0% on Microsoft; 9.0% on $2.4B for others5No new financing above about 10% or covering less than 90% of machines (estimate)8-K for each financing; 10-K or 10-Q Note on DebtEach new 8-K
Shares outstanding404.6M on 28 September 20263Under about 450M by June 2027 unless sold above $35 (estimate)10-Q cover page, shares outstandingFirst-quarter FY2027 10-Q, expected November 2026
Source FY26 results release; proxy; Horizon 1 release [5][6][3]. Thresholds are my estimates.

Where I come down

The contracts with Microsoft and NVIDIA moved me: without them there would be no base case. The $4B target did not, because it is a target for capacity not yet built, and the company’s own filing says revenue may be materially lower. A year in which acceptance, prices and financing all land on time would raise my values; a refinancing at 11% or above, or a fall in the price on new contracts, would take the base to zero.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • Counterparties. The 10-K says Microsoft and NVIDIA together are a substantial majority of contracted revenue, and that some customers are early-stage private companies.2 In a bankruptcy the claims for future payments may be capped.2
  • Delivery and acceptance. Revenue starts only on acceptance and can be reduced by delay and service credits.2
  • Refinancing. $6.7B of convertible notes mature between December 2029 and December 2033, and the non-recourse GPU debt amortizes through 2031.2 The company issued $7.2B of debt in one year.
  • Dilution. The share count is 7.4 times the 2022 level. The company can sell up to $3.5B more under the share plan, 26.2M restricted units and options are outstanding, and the 2027 founder grants add 18.2M units.23
  • Power and policy. The Microsoft contract has fixed-price power through its financing term, but IREN is exposed to prices for any extra consumption and to the gap between the ERCOT hub and its site.2 British Columbia has capped new data center power.2
  • Control. The two founders hold 39.5% of the votes through B Class shares until 2033.3
  • Bitcoin runoff. Bitcoin gave $578.2M of FY2026 revenue and ends by December 2026, so total revenue may dip before AI revenue replaces it.2
  • Accounting. The 10-K reports a $558.5M unrealized gain and a $638.8M impairment in one year. Earnings will move with the share price and with writedowns, which is why I use cash.2

The Culper short report on IREN

Who and what. Culper Research is a short seller. It says it holds short positions in the companies it writes about and may profit if the price falls.17 On 11 July 2024 it published “Iris Energy Ltd (IREN): A Prius at the Grand Prix”.16 The site blocks automated access, so I read the Internet Archive copy; page numbers are its.17

What it alleges. Culper calls the AI story “entirely contrived”: the sites were built for bitcoin and finished before April 2023 (pp. 2 and 4). It says Childress has “zero apparent backup power” and one 345 kV line (pp. 3 and 8), and that air cooling is insufficient for GPUs in Texas heat (pp. 3 and 10 to 12). It says IREN spent under $1M per MW, while an HPC-ready data center costs $10M to $20M, and several of its benchmarks exclude chips (pp. 2 and 7). It also argues the shares were worth 52% to 79% less (p. 15).17

The company’s response. I found no point-by-point reply from IREN, and no IREN filing I could search names Culper.25 On 12 July 2024 IREN, then Iris Energy, told Benzinga it is limited in what it can say about such reports, encourages debate, and that “not all engagement meets these standards”; it stays focused, it added, on mining growth, AI cloud customers and its power and land.1819 On 23 July it filed an investor-day deck that does not name Culper but has pages on backup power, cooling and cost; the table below sets them out.20 Bernstein, a sell-side research firm, said IREN “has not claimed it intends to retrofit its bitcoin mining site” at Childress.21

What is established and what is not

Four of Culper’s claims from July 2024, set against what IREN’s own documents say.

Culper claims and status
Culper’s claimWhat IREN has said or shownStatus nowWhere to track it
The AI story is contrivedAI cloud was $128.8M of FY2026 revenue, and Microsoft accepted Horizon 1 in August 2026.26 The 10-K calls the data centers “purpose-built for power-dense computing” and plans to retrofit the air-cooled halls at Childress.2AI cloud is now a revenue line. That does not settle whether the 2024 halls were AI-ready or the timing opportunistic. Culper’s counts reproduce: “HPC” appears 0 times in the FY2022 20-F and 97 in FY2023.41310-Q, AI cloud revenue
Childress has “zero apparent backup power” and one lineJuly 2024 deck: IREN has “battery and generator back-ups for key components at all sites” (network, storage, security, key management) and can add redundancy for the compute on request (p. 16).20 November 2025 deck: “Tier III equivalent concurrent maintainability” for Horizons 1 to 4.22 The 10-K says IREN “added alternative sources of backup power supply at certain existing data centers”, and that running GPUs on back-up generators “may not be feasible” in an outage.2Not established either way. IREN’s wording covers key components and a design standard, not a certificate; none I found says what backs up the GPUs at Childress or how many lines feed it.6Horizon 2 to 4 releases; next 10-Q
Cost is $10M to $20M per MW, not under $1MNovember 2025: $14M to $16M per MW of IT load for the 200MW Microsoft build, with the $5.8B of GPUs counted separately; $9M to $11M of it is infrastructure.22 July 2024: $0.75M per MW for its design then, and $0.75M to over $10M for AI colocation, by redundancy and cooling (p. 30).20IREN’s figures for the new builds sit inside Culper’s range. They do not show the 2024 statements wrong: Horizon is a new liquid-cooled build, and the FY2024 20-F ties Childress Phases 2 and 3 to bitcoin miners.6810-Q capital spending note
Air cooling is insufficient for GPUs in Texas heatJuly 2024: air-cooled GPUs at Prince George never exceeded their thermal qualification temperature, a Childress pilot was due in the second half of 2024, and sites could be retrofitted with liquid cooling (pp. 14 and 17).20 Horizons 1 to 4 are direct-to-chip liquid-cooled; the 10-K plans to retrofit the air-cooled halls at Childress.62Not settled. The 2024 data are from British Columbia. IREN’s later Childress halls are liquid-cooled; the documents I read do not say why, so I draw no link to the 2024 claim.Horizon 2 to 4 releases; next 10-Q
Status is my reading of the documents. I found no court or regulator ruling on any of the four claims. Source Culper report; 23 July 2024 deck; November 2025 deck; August 2026 release; 10-K FY2026; 20-F FY2024 [17][20][22][6][2][8].

Legal. A securities class action, Williams-Israel v. Iris Energy Ltd (retitled In re Iris Energy Limited Securities Litigation), 1:24-cv-07046, was filed in the Eastern District of New York on 7 October 2024. Its complaint cites the Culper report.282426 The lead plaintiff, named on 7 January 2025, filed a notice of voluntary dismissal on 14 March, and the court dismissed the case without prejudice on 19 March.2723 That is not a ruling on the claims. I found no refiled case; the FY2026 10-K lists no regulator action, only a separate 2022 New Jersey class action over the IPO.272

Where it touches my model. Only the cost claim touches an input. I charge $10.5M per MW for building and power on the 1,500MW I add after the 300MW already contracted, inside Culper’s $10M to $20M and level with IREN’s $9M to $11M for infrastructure. Each $1M more on building lowers my base by about $2.40 a share; at $20M it goes below zero, which I read as $0 (estimate). Culper’s backup estimate, $1.6M to $2.2M per MW (calculated), would take the base to $15 to $17 if it were extra (estimate).17 I charge $46.5M per MW for machines ($36M) and building; IREN’s figures for the Microsoft build imply $43M to $45M (calculated), about $29M of machines and $14M to $16M of building.2210 Machines are bought again every five years, so each $1M on them moves my base by about $6 a share, and on IREN’s split it would read about $48 to $53, not $21 (estimate). That tests my own machine cost, not Culper’s claim; I leave my values as they are. The “contrived” claim touches no input; it bears on trust.

So what. Culper wrote about Childress in 2024; Horizons 1 to 4 are new, liquid-cooled halls, so IREN’s later builds neither confirm nor refute it.6 Cost can be checked now: the machine and building split behind IREN’s $43M to $45M a megawatt, against my $46.5M, is what I would test. Backup for the GPUs cannot be known from outside. For Culper’s point to matter to value today, the Horizon halls would have to lack it and customers would hold uptime rights; for IREN to be right they must meet the Tier III equivalent it describes, which Microsoft’s acceptance of Horizon 1 fits but does not prove.2 The short seller profits if the price falls; IREN’s founders hold 39.5% of the votes and are paid mostly in stock, so they profit if it rises.3 Watch the Horizons 2 to 4 grace periods, which the 10-K says run to the start of the second quarter of 2027, and the 10-Q for the quarter to 31 December 2026, due by 9 February 2027.2

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Price per MW on new contractsMore than $20M for recent three-year contracts5Contracts at or above $20M after Horizon 4 is deliveredNew contracts under $15M per MW
DeliveryHorizon 1 accepted, Horizons 2 to 4 due6All accepted by mid-2027 without creditsAcceptance slipping past the grace periods
Financing cost6.0% and 9.0% on recent GPU financing5Next financings at or below 9% with prepayments over 45%Any financing above 11% or with a lower share covered
Share count404.6M3Growth slower than new capacityMore than 450M before the cash flows start
Customer mixMicrosoft and NVIDIA the majority2No customer above half of contracted revenueA customer default or a renegotiation disclosed in a filing
Machine lifeFive years in the accounts2Contracts that renew at 65% or more of the first priceRenewals under 45%, or a shorter accounting life
Source 10-K FY2026; FY26 results release [2][5]. Thresholds are my judgement.

Geopolitical risk, and what it means for the value

IREN is incorporated in Australia, listed on Nasdaq and reports in dollars. It has no state owner, no capital controls and no China listing to worry about. The exposure is narrower: where the power comes from, where the machines come from, and one customer.

Power. The 200MW Microsoft contract is in Childress, Texas, and so are most of the announced US sites. On 3 August 2026 the governor of Texas told the utility regulator and ERCOT to audit every data center in the grid queue before more are approved, and the 10-K says this may delay energization at new and existing projects.2 Machines. The GPUs come from NVIDIA and Dell. US customs claims the bitcoin miners imported from Southeast Asia in 2024 and 2025 came from China, which would add up to about $100M of tariff; IREN has protested.2 The 10-K also says export controls could change which GPUs it may buy and which countries it may serve.2 Customer. Microsoft and NVIDIA are a substantial majority of contracted revenue, and the Microsoft debt is guaranteed by IREN if Microsoft validly ends a tranche and no replacement is found.2

The rest is small. Bitcoin mining stops by December 2026, so a mining ban or tax is worth about $0.30 a share, the $160M of bitcoin cash in my base (estimate). Australia and British Columbia carry no value in my base. Bundey (800MW) and the 160MW in British Columbia are extra to it, and Australia is writing rules that would make data centers pay network costs and offset their power use.2

The table reruns the base case with one change each. The Texas row delays every new megawatt by a year and leaves the 300MW contracted as planned. The machine row raises every future machine purchase 10%, with no pass-through to customers. The Microsoft row removes a year of revenue on 100MW. I do not predict any of these.

Base value per share under each event

One change at a time, base case rerun, US$ a share. The odds are my judgement, not statistics.

Geopolitical scenarios
ScenarioWho decidesMy odds, and the basisBase value per share
Base, none of theseNoneNo event is in my base$21
Texas holds up all new building for a yearPUC of Texas, ERCOTAbout 1 in 3. The 10-K warns of energization delays after the August 2026 directive2$13
Machines cost 10% more, from tariffs or supplier limitsUS trade officials, suppliersAbout 1 in 5. The 10-K calls trade policy unsettled2$0 (model: −$2)
100MW of the Microsoft contract sits idle for a yearMicrosoft, at acceptanceUnder 1 in 10. Horizon 1 was accepted in August 20266$18
Texas delay and idle Microsoft megawatts togetherAs aboveUnder 1 in 20, from the two rows above$10
Customs rules against IREN on the $100M claimUS Customs and Border ProtectionAbout 1 in 4. IREN has protested and calls the claim without merit2$20.5
Australian and Canadian sites never builtAustralian and BC governmentsNot needed. The base builds 1,800MW (IT) and US sites alone are announced at 4,350MW (gross)2$21 (no change)
Source 10-K FY2026 risk factors; my model [2]. Estimates.

None of it is in my base, and the price leaves no room for it. The price of $23.95 needs only about 1% more per megawatt than my base, so it assumes delivery on time and machines at today’s cost. A one-year Texas delay would put the value 45% below it. The machine cost is the one to watch because it repeats at every replacement cycle. My model lets no cost pass to customers, so $0 is a harsh reading (estimate).

Sources

  1. 1IREN daily closes, Nasdaq.com historical API, 17 November 2021 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Close/Last on 10/30/2026: $23.95 · Accessed 30 Oct 2026↩︎
  2. 2IREN Form 10-K, fiscal year ended 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 27 Aug 2026 · Items 1, 1A, 7; statements; Notes 4, 14, 20, 22, 23, 24, 27 · Accessed 30 Oct 2026↩︎
  3. 3IREN definitive proxy statement (DEF 14A) (opens in a new tab)FilingSEC EDGAR · 13 Oct 2026 · Pay, grants, ownership at 28 September 2026 · Accessed 30 Oct 2026↩︎
  4. 4IREN (then Iris Energy) Form 20-F, fiscal year ended 30 June 2022 (opens in a new tab)FilingSEC EDGAR · 13 Sep 2022 · FY2022 results; share count at 30 June 2022 · Accessed 30 Oct 2026↩︎
  5. 5IREN Reports FY26 Results (Exhibit 99.1 to Form 8-K) (opens in a new tab)FilingSEC EDGAR · 27 Aug 2026 · ARR, pricing per MW, financings, delivery targets · Accessed 30 Oct 2026↩︎
  6. 6IREN Delivers Horizon 1 to Microsoft (Exhibit 99.1 to Form 8-K) (opens in a new tab)FilingSEC EDGAR · 13 Aug 2026 · Horizon 1 acceptance; 480MW and 1.2GW gross targets · Accessed 30 Oct 2026↩︎
  7. 7IREN daily chart data, Yahoo Finance (opens in a new tab)PriceYahoo Finance · 30 Oct 2026 · Close of 30 October 2026, $23.95, matches Nasdaq · Accessed 30 Oct 2026↩︎
  8. 8IREN Form 20-F, fiscal year ended 30 June 2024 (opens in a new tab)FilingSEC EDGAR · 28 Aug 2024 · FY2022 to FY2024 under IFRS; share count at 30 June 2024 · Accessed 30 Oct 2026↩︎
  9. 9IREN Form 10-K, fiscal year ended 30 June 2025 (opens in a new tab)FilingSEC EDGAR · 28 Aug 2025 · FY2023 to FY2025 statements under US GAAP · Accessed 30 Oct 2026↩︎
  10. 10IREN Form 10-Q, quarter ended 31 December 2025 (opens in a new tab)FilingSEC EDGAR · 5 Feb 2026 · Microsoft agreement, Dell purchase agreement of about $5.8B, 200MW · Accessed 30 Oct 2026↩︎
  11. 11Situational Awareness LP Form 13F-HR information table, period 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · 9,474,099 IREN shares, $433,250,547 · Accessed 30 Oct 2026↩︎
  12. 12IREN Completes Acquisition of Mirantis (Exhibit 99.1 to Form 8-K) (opens in a new tab)FilingSEC EDGAR · 4 Aug 2026 · 12.6M shares plus about $40M · Accessed 30 Oct 2026↩︎
  13. 13IREN Form 20-F, fiscal year ended 30 June 2023 (opens in a new tab)FilingSEC EDGAR · 13 Sep 2023 · Share count at 30 June 2023 · Accessed 30 Oct 2026↩︎
  14. 14Oracle on this site (opens in a new tab)Sitepedrumshokouhi.com · Q4 2026 · Base value and return, for comparison · Accessed 30 Oct 2026↩︎
  15. 15Rocket Lab on this site (opens in a new tab)Sitepedrumshokouhi.com · Q4 2026 · Base value and return, for comparison · Accessed 30 Oct 2026↩︎
  16. 16Culper Research, Iris Energy Ltd (IREN): A Prius at the Grand Prix (opens in a new tab)ReportCulper Research · 11 Jul 2024 · The site returns an error to automated requests · Accessed 11 Nov 2026↩︎
  17. 17Culper report, Internet Archive copy of the same PDF (opens in a new tab)ReportInternet Archive · capture of 16 Nov 2025 · The copy I read; page numbers in the text are its · Accessed 11 Nov 2026↩︎
  18. 18Iris Energy Shares Plunge On Short Report From Culper Research: What You Need To Know (UPDATED) (opens in a new tab)NewsBenzinga, as republished by TradingView · Jul 2024 · Spokesperson’s statement, added in an update · Accessed 11 Nov 2026↩︎
  19. 19Iris Energy in response to Culper Research short report, tells Benzinga (opens in a new tab)NewsQuantisnow · 12 Jul 2024, 10:26 ET · Dates the statement; repeats Benzinga’s text · Accessed 11 Nov 2026↩︎
  20. 20IREN Form 6-K, Analyst and Investor Day presentation (Exhibit 99.1) (opens in a new tab)FilingSEC EDGAR · 23 Jul 2024 · Deck pages 14, 16, 17, 30 and 32: air-cooled GPU data, back-ups, liquid-cooling retrofit, cost per MW, notes · Accessed 11 Nov 2026↩︎
  21. 21Bernstein hits back at Culper’s short report on mining firm IREN (opens in a new tab)NewsThe Block · 12 Jul 2024 · Bernstein analysts’ note · Accessed 11 Nov 2026↩︎
  22. 22IREN $9.7bn AI Cloud Contract with Microsoft, investor presentation (Exhibit 99.2 to Form 8-K) (opens in a new tab)FilingSEC EDGAR · 3 Nov 2025 · Slide 5: $14M to $16M per MW, Tier III equivalent · Accessed 11 Nov 2026↩︎
  23. 23IREN Form 6-K, interim financial statements to 31 March 2025 (Exhibit 99.4) (opens in a new tab)FilingSEC EDGAR · 14 May 2025 · Legal proceedings: 2024 securities action, dismissal of 19 Mar 2025 · Accessed 11 Nov 2026↩︎
  24. 24Iris Energy Limited (NASDAQ: IREN) Securities Fraud Class Action (opens in a new tab)Law firmKessler Topaz Meltzer and Check · Notice from the plaintiffs’ side · E.D.N.Y. 24-cv-07046, class period 20 Jun 2023 to 11 Jul 2024 · Accessed 11 Nov 2026↩︎
  25. 25SEC EDGAR full-text search: IREN filings for “Culper” (opens in a new tab)SearchSEC EDGAR · Run 11 Nov 2026 · No hits for “Culper”, “short seller” or “short report” in IREN’s filings · Accessed 11 Nov 2026↩︎
  26. 26Bitcoin Miner Iris Energy Accused of Overstating Data Center Capacity in Lawsuit (opens in a new tab)NewsDecrypt · 10 Oct 2024 · Reports the complaint cites Culper Research · Accessed 11 Nov 2026↩︎
  27. 27In re Iris Energy Limited Securities Litigation, 1:24-cv-07046 (E.D.N.Y.), docket (opens in a new tab)CourtCourtListener, RECAP archive · Entries of 7 Oct 2024, 7 Jan 2025, 8 Jan 2025, 14 Mar 2025 and 19 Mar 2025; terminated 19 Mar 2025 · Accessed 11 Nov 2026↩︎
  28. 28Class action complaint, Williams-Israel v. Iris Energy Ltd, 1:24-cv-07046, filed 7 Oct 2024 (opens in a new tab)CourtCourtListener RECAP copy on the Internet Archive · Class period in paragraph 1; Culper report quoted from paragraph 57 · Accessed 11 Nov 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or a growth assumption.

The price

Close in Q4 2026: $23.95, from Nasdaq [1] and cross-checked with a second feed [7]. Retrieved in Q4 2026. The shares are ordinary shares of an Australian company listed on Nasdaq in US dollars; reporting is in US dollars, so no currency conversion applies. Share count 404.6M ordinary shares on 28 September 2026 plus 26.2M restricted units and options, and the in-the-money notes at the 2029 and 2030 conversion prices; Q1 FY2027 has not been reported. The Mirantis shares were issued before that date. No split falls in the period.

Fiscal years end 30 June. Fiscal 2022 to 2024 were reported under international standards in Form 20-F and fiscal 2025 and 2026 under US standards in Form 10-K.

The valuation

An unlevered discounted cash flow on owner free cash flow, ten fiscal years from FY2027, after stock pay, tax and all capital spending. Cash flows from the contracted 2026 capacity are discounted at 8.0% and everything else at 11.0%, then a steady fleet growing 2% a year after FY2036. Cash arrives at the end of each fiscal year, counted from 31 October 2026. Net claims are the 30 June 2026 balance sheet: cash and restricted cash and assets held for sale, less convertible notes at principal (unless in the money), GPU financing drawn, finance leases, customer prepayments and accounts payable. Capped calls and prepaid forwards of $415.6M are not counted. Per-share values divide by the shares above. The odds in Section VII are my guesses and are not used in the values, except that the weighted value of $39 uses 30%, 50% and 20%.

The margin-of-safety price is $0, set from a bear value of zero. No rating: the page states a range and the price, and leaves the decision to the reader. I did not model any new shares or the capital raised at prices other than value.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.