Investing№ 78Nasdaq: APLD

Applied Digital

Applied Digital builds data centres and leases them for 15 years to CoreWeave and hyperscalers; $35.7B of rent is contracted, but debt and Macquarie’s preferred stock stand ahead of the shares.

Updated Fiscal year ends 31 May37 min readPedrum Shokouhi

Can be disrupted

Research, not investment advice. Figures as of .

Key numbers

  • Revenue$872M (calculated)TTM to 31 Aug 2026; $342M in the latest quarter, $184M of it fit-out billings [2][3]
  • Rent contracted$35.7B (reported)Minimum payments over the 15-year base terms, 1,410 MW [2]
  • Earning rent250 MW (reported)Live at 1 October 2026, of 1,410 MW leased [4]
  • Debt$6.7B (reported)Face value at 31 Aug 2026, plus $2.0B of Macquarie preferred [2]
  • Stock pay$271M (calculated)TTM; $66.5M in the latest quarter [2][3]
  • Share price−64% (calculated)From the $49.65 close on 28 May to $17.82 [1]

The answer

  1. Applied Digital builds data centres in North Dakota, Louisiana and Alabama and leases them for 15 years to CoreWeave and to hyperscalers, with $35.7B of rent contracted; it has spent most of the last year raising money, taking on $6.4B of debt and $2.0B of Macquarie preferred stock, and in the twelve months to August it made $872M of revenue and an operating loss of $289M (calculated).235
  2. I value the common at $1.50 a share, in a range of $0 to $8.34, because after the lenders, the Macquarie preferred and the cost of finishing the buildings the shareholders get only a thin slice of the rent, and most of what they get arrives after 2040 (estimate).26
  3. At $17.82 the price is 1,084% above my base value, and it fits a different reading: that the finished campuses are worth about 7.1% of their income after overhead, which is higher than any of my three cases allows; my bear value is zero, so I set no margin-of-safety price above $0 (estimate).1

Six questions, one line each

Why
Hyperscalers and CoreWeave need powered, built space faster than they can build it, and Applied Digital has signed 1,410 MW of 15-year, take-or-pay, non-cancellable leases in under 18 months.34 →
The moat
Thin: power, land and speed are what it sells, and its newest leases pay about 9% less rent per megawatt than the first.3 →
The advantage
A repeatable 150 MW design built in 14 to 18 months, with equipment bought early, and a spread of about 11% rent income on cost against a 7% to 9% cost of lending (calculated).362 →
Management
Wes Cummins, the founder and chief executive, was reported $189M of pay for FY2026, mostly stock awards tied to share-price hurdles of $50 to $100, owns 7.8% and has 17.6M of his shares pledged for a bank credit line.7 →
Margin of safety
None on my numbers: the bear case is a total loss of the common, so I show $0 and not a price that would feel safe.2 →
The price
$17.82 at the close in Q4 2026, down 64% from the $49.65 close on 28 May and in line with a group of AI-infrastructure shares that fell 32% to 70% over the same months.18 →

The business

Applied Digital owns buildings full of electrical and cooling equipment, and rents them to companies that fill them with computers. The tenants pay per megawatt of power the building can deliver to the computers, for 15 years, whether or not they use it. The company calls the buildings AI factories. It designs them, builds them, owns the land and operates them, from Dallas, Texas.3 Fiscal years end on 31 May, so “FY2026” means June 2025 to May 2026.

It began as a bitcoin-hosting business, Applied Blockchain, in 2021.9 It still runs two such sites in North Dakota, 106 MW at Jamestown and 180 MW at Ellendale, for one customer whose contract had about a year and a half left in May 2026.3 Its April investor deck names that customer as Marathon Digital.6 In the first quarter of FY2027 the sites earned a segment profit of $13.3M on $37.8M of revenue.2 Everything else it has done since 2023 points the other way. A second business, the cloud service, rented out graphics processors; in May 2026 it was merged into a listed shell called ChronoScale, in which Applied Digital kept about 96%.2

What it has signed

As of 31 August it had leases for about 1,410 MW across five campuses, worth about $36B of rent over the 15-year base terms, or about $86B if every renewal option were used.4 The leases are take-or-pay: the tenant owes the rent whether it uses the space, and ending early means paying the full remaining value.3 The 10-Q gives a schedule of minimum payments: $468M in FY2027, $1,580M in FY2028, then $2,361M and $2,371M a year from FY2029, and $26.6B after FY2031, in total $35.7B (reported).2

The five leased campuses

Megawatts are critical IT load, the power available to the tenant’s computers.

The five leased campuses
CampusTenantMegawattsContracted rent, 15-year base termRent per megawatt-yearDelivery
Polaris Forge 1, North Dakota (reported)CoreWeave400$11.0B$1.83MOct 2025 to mid-2027
Polaris Forge 2, North Dakota (reported)Investment-grade hyperscaler200$5.0B$1.67MLate 2026 to early 2027
Polaris Forge 3, North Dakota (reported)High investment-grade hyperscaler300$7.5B$1.67MLate 2027 to late 2028
Delta Forge 1, Louisiana (reported)High investment-grade hyperscaler300$7.5B$1.67MFirst half 2027 to early 2028
Delta Forge 2, Alabama (reported)High investment-grade hyperscaler210$5.2B$1.65MFirst half 2028
Total (calculated)1,410$36.2B$1.71M
Rent per megawatt-year is contracted revenue divided by megawatts divided by 15, my arithmetic. Contracted revenue excludes power the tenant pays for directly. The three newest campuses are leased to the same tenant, which the company calls tier-one and investment grade; I do not name it because the filings do not. Source 10-K FY2026, Item 1; 10-Q Q1 FY2027 [3][2]. Reported; rent per megawatt calculated.

Only the first campus has a named tenant. Polaris Forge 1, 400 MW, is leased to CoreWeave in three buildings. The first 100 MW opened in October 2025. A second building of 150 MW was handed over in two halves, on 1 July and 1 October 2026, so 250 MW is live.4 The third, 150 MW, is under construction. In March 2026, CoreWeave restructured two of the leases: the term on two of the four data halls in one lease was suspended and re-let to a new CoreWeave subsidiary on the same terms, and the other building’s lease was assigned to that subsidiary. CoreWeave added springing guarantees and agreed to post a $50M letter of credit.3 The company describes this as an improvement in credit quality following a rating of A3 on a CoreWeave refinancing.10 I could not tell what makes the guarantees “spring”, because the exhibits set that out and I did not read them.

What the first quarter looked like

Revenue for the quarter to 31 August was $341.9M, up 322%. Only $65.8M of it was base rent. $183.5M was tenant fit-out work that Applied Digital organises and bills to the tenant, against $176.1M of cost, and $13.3M was costs passed back to the tenant.2 The company’s own measure of the rental business, net operating income, was $58.8M, an 89% margin. Adjusted EBITDA was $64.4M. The reported operating loss was $62.4M, after $66.5M of stock pay and $41.9M of depreciation.2 So this is a business that has just started to earn rent, and for now most of its revenue is pass-through.

Revenue and operating loss

US$ millions, fiscal years ending 31 May

  • Revenue, TTM $872M
  • Operating loss, TTM −$289M
Revenue and operating lossRevenue and GAAP operating loss by fiscal year to 31 May, FY2022 to FY2026, and the twelve months to 31 August 2026. Revenue rose from $8.5M to $611M in FY2026 and $872M over the twelve months; the operating loss widened from $21M to $237M in FY2026 and $289M over the twelve months.−$400M−$200M$0$200M$400M$600M$800M’22’23’24’25’26TTMRevenue, FY22: $9MRevenue, FY23: $55MRevenue, FY24: $166MRevenue, FY25: $229MRevenue, FY26: $611MRevenue, TTM Aug 2026: $872MOperating income, FY22: −$21MOperating income, FY23: −$43MOperating income, FY24: −$98MOperating income, FY25: −$72MOperating income, FY26: −$236MOperating income, TTM Aug 2026: −$289MRevenue and operating lossRevenue and GAAP operating loss by fiscal year to 31 May, FY2022 to FY2026, and the twelve months to 31 August 2026. Revenue rose from $8.5M to $611M in FY2026 and $872M over the twelve months; the operating loss widened from $21M to $237M in FY2026 and $289M over the twelve months.−$400M−$200M$0$200M$400M$600M$800M’22’23’24’25’26TTMRevenue, FY22: $9MRevenue, FY23: $55MRevenue, FY24: $166MRevenue, FY25: $229MRevenue, FY26: $611MRevenue, TTM Aug 2026: $872MOperating income, FY22: −$21MOperating income, FY23: −$43MOperating income, FY24: −$98MOperating income, FY25: −$72MOperating income, FY26: −$236MOperating income, TTM Aug 2026: −$289MRevenue and operating lossRevenue and GAAP operating loss by fiscal year to 31 May, FY2022 to FY2026, and the twelve months to 31 August 2026. Revenue rose from $8.5M to $611M in FY2026 and $872M over the twelve months; the operating loss widened from $21M to $237M in FY2026 and $289M over the twelve months.−$400M−$200M$0$200M$400M$600M$800M’22’23’24’25’26TTMRevenue, FY22: $9MRevenue, FY23: $55MRevenue, FY24: $166MRevenue, FY25: $229MRevenue, FY26: $611MRevenue, TTM Aug 2026: $872MOperating income, FY22: −$21MOperating income, FY23: −$43MOperating income, FY24: −$98MOperating income, FY25: −$72MOperating income, FY26: −$236MOperating income, TTM Aug 2026: −$289M
TTM is FY2026 plus the first quarter of FY2027 less the first quarter of FY2026. FY2024 revenue is the recast $165.6M from the FY2026 10-K; the original FY2024 report said $136.6M. About $184M of the first quarter’s $342M was tenant fit-out work billed at close to cost. Source 10-K FY2026; 10-K FY2025; 10-Q Q1 FY2027; SEC XBRL [3][11][2][5]. Calculated from reported figures.
Show the numbers
Revenue and operating loss
FY22FY23FY24FY25FY26TTM Aug 2026
Revenue (reported)$9M$55M$166M$229M$611M$872M
Operating income (reported)−$21M−$43M−$98M−$72M−$236M−$289M

What is still to build

About 1,160 MW are not yet earning rent (calculated).4 The campuses are in two groups. Polaris Forge 1 and 2, 600 MW, sit inside a subsidiary, TopCo 2, which carries $5.9B of debt and $2.0B of Macquarie preferred stock, and held $2.9B of cash and $0.5B of restricted cash at 31 August.2 Delta Forge 1 and 2 and Polaris Forge 3, 810 MW, sit outside it, and I found no project financing yet for them in the filings. Management’s deck puts the cost at $11M to $13M a megawatt.6 Applied Digital also reports an active pipeline of over 3 GW and a further 5 GW of earlier discussions.3 In October it signed an agreement for up to about 1 GW of potential power in Finland, its first site outside the United States.4

Power, and a related company

On 4 October 2026 it signed a 15-year power purchase agreement with Base Electron for the output of a planned 1,200 MW gas plant in North Dakota, to supply Polaris Forge 3. It pays fixed monthly amounts based on contract capacity, with a credit support agreement, and Base Electron can cancel it if the plant has not reached financial close by 31 March 2027.2 Base Electron is a related party. The proxy says it is owned and managed by certain officers and directors of Applied Digital, including Wes Cummins, Jason Zhang and Richard Nottenburg, acting in their own right, and Applied Digital owns about 10%.7 Applied Digital has also lent it $59M. The board set up a committee of directors to review the transaction.27

The moat

I ask two questions. Could a rival take the tenant at the same price, and would the tenant bother? For a landlord whose tenants are among the largest companies in the world, the second matters more than the first.

What is hard to copy

Power. The company says getting power and a grid connection ahead of demand is the main limit on new capacity, and that this is where it differs from most rivals.3 I can check part of this. It holds sites in North Dakota, where the deck says electricity costs about 24% less than the national average and there is surplus generation, and it has a gas plant in prospect through a company its leaders partly own.62 A tenant that needs 300 MW by 2028 cannot easily get that anywhere. That is real.

Speed and procurement are the second item. It says it can build about 150 MW in 14 to 18 months, and that it bought electrical equipment from ABB, cooling from BASX and generators from Caterpillar in bulk before shortages.3 The chief executive said on a podcast in January that locking in the supply chain 18 to 24 months earlier was a major advantage.12 The record so far supports him: the first 100 MW opened in October 2025, the 150 MW building in two steps in 2026, against the 2H 2025 and 2H 2026 windows given a year earlier.34 Three buildings is a short record.

What is not

The rent. The first campus pays $1.83M per megawatt-year. The three newest campuses pay $1.67M, and the latest, Delta Forge 2, $1.65M (calculated).3 That is about 9% less, in a year when the company says power is the gating factor.4 A seller with a scarce product usually raises the price. The tenants are few and large: three customers in the first quarter were 56%, 21% and 11% of revenue.2 The 10-K lists IREN, Cipher, TeraWulf, Hut 8, Riot, CleanSpark, Core Scientific, Galaxy and others as rivals, as well as Digital Realty and Equinix and the hyperscalers building their own.3 Several of the bitcoin hosts on that list are trying to do what Applied Digital did.

The fall since 28 May, against others

Percent change in closing price, 28 May to 30 October 2026, shown from worst to best

  • Applied Digital −64%
The fall since 28 May, against othersChange in the closing price from 28 May to 30 October 2026. Applied Digital fell 64%. Cipher Digital fell 70%, IREN 63%, TeraWulf 56%, Core Scientific 52% and CoreWeave 49%. Nebius fell 32%, Oracle 36% and Vertiv 26%. NVIDIA fell 4%, Amazon 12%, and Microsoft rose 22%.−80%−60%−40%−20%0%20%CIFRIRENCORZORCLBEAMZNMSFTChange, Cipher Digital: −70.4%Change, Applied Digital: −64.1%Change, IREN: −62.6%Change, TeraWulf: −55.6%Change, Core Scientific: −52.3%Change, CoreWeave: −48.7%Change, Oracle: −35.9%Change, Nebius: −31.9%Change, Bloom Energy: −29.9%Change, Vertiv: −26.0%Change, Amazon: −12.3%Change, NVIDIA: −4.5%Change, Microsoft: +22.2%The fall since 28 May, against othersChange in the closing price from 28 May to 30 October 2026. Applied Digital fell 64%. Cipher Digital fell 70%, IREN 63%, TeraWulf 56%, Core Scientific 52% and CoreWeave 49%. Nebius fell 32%, Oracle 36% and Vertiv 26%. NVIDIA fell 4%, Amazon 12%, and Microsoft rose 22%.−80%−60%−40%−20%0%20%CIFRAPLDIRENWULFCORZCRWVORCLNBISBEVRTAMZNNVDAMSFTChange, Cipher Digital: −70.4%Change, Applied Digital: −64.1%Change, IREN: −62.6%Change, TeraWulf: −55.6%Change, Core Scientific: −52.3%Change, CoreWeave: −48.7%Change, Oracle: −35.9%Change, Nebius: −31.9%Change, Bloom Energy: −29.9%Change, Vertiv: −26.0%Change, Amazon: −12.3%Change, NVIDIA: −4.5%Change, Microsoft: +22.2%The fall since 28 May, against othersChange in the closing price from 28 May to 30 October 2026. Applied Digital fell 64%. Cipher Digital fell 70%, IREN 63%, TeraWulf 56%, Core Scientific 52% and CoreWeave 49%. Nebius fell 32%, Oracle 36% and Vertiv 26%. NVIDIA fell 4%, Amazon 12%, and Microsoft rose 22%.−80%−60%−40%−20%0%20%CIFRAPLDIRENWULFCORZCRWVORCLNBISBEVRTAMZNNVDAMSFTChange, Cipher Digital: −70.4%Change, Applied Digital: −64.1%Change, IREN: −62.6%Change, TeraWulf: −55.6%Change, Core Scientific: −52.3%Change, CoreWeave: −48.7%Change, Oracle: −35.9%Change, Nebius: −31.9%Change, Bloom Energy: −29.9%Change, Vertiv: −26.0%Change, Amazon: −12.3%Change, NVIDIA: −4.5%Change, Microsoft: +22.2%
From the left: CIFR, APLD, IREN, WULF, CORZ, CRWV, ORCL, NBIS, BE, VRT, AMZN, NVDA, MSFT (Cipher, Applied Digital, IREN, TeraWulf, Core Scientific, CoreWeave, Oracle, Nebius, Bloom Energy, Vertiv, Amazon, NVIDIA, Microsoft). 28 May is Applied Digital’s highest close. I do not know why the group fell together; I report the pattern, not a cause. Source Nasdaq historical closes [1][8]. Calculated from reported closes.
Show the numbers
The fall since 28 May, against others, the numbers
28 May close30 Oct closeChange
Cipher Digital (reported)$24.59$7.29−70.4%
Applied Digital (reported)$49.65$17.82−64.1%
IREN (reported)$64.05$23.95−62.6%
TeraWulf (reported)$26.39$11.73−55.6%
Core Scientific (reported)$27.76$13.25−52.3%
CoreWeave (reported)$106.86$54.87−48.7%
Oracle (reported)$203.70$130.67−35.9%
Nebius (reported)$226.34$154.14−31.9%
Bloom Energy (reported)$290.01$203.17−29.9%
Vertiv (reported)$314.18$232.50−26.0%
Amazon (reported)$274.00$240.35−12.3%
NVIDIA (reported)$214.25$204.64−4.5%
Microsoft (reported)$426.99$521.91+22.2%

The shares moved with the group

Between 28 May and 30 October Applied Digital’s share price fell 64%. CoreWeave fell 49%, IREN 63%, Cipher 70%, TeraWulf 56% and Core Scientific 52%. Oracle fell 36% and Vertiv 26%. NVIDIA fell 4% and Microsoft rose 22%.18 The fall was shared with the companies that are financed with debt to build AI capacity, not with the companies that sell chips or own the software. A news search found no single cause. One press account points to the debt, rising yields, a falling bitcoin price and debt-funded builders going out of favour, after a record quarter.13 I do not claim to know the reason.

My judgement: it has a good position in a scarce thing, power and a quick build, and a short record of using it. What would make this a wall instead of a position is evidence that tenants pay more for it, and the rents so far point the other way.

The competitive advantage

The advantage is the spread. A megawatt costs about $12.5M to build and earns about $1.46M a year of net operating income, so on my base numbers it earns about 11.7% on cost for 15 years (estimate).63 Money to build it costs about 7% to 9% from lenders and 12.75% or more from Macquarie.2 The deck’s own figures give a range: net income over cost runs from 11% to about 15%, and 15% needs the lowest cost and the highest rent together.6 A press account says management expects new lease rates to rise by more than 15%; I come back to it in Section VII.13

What a megawatt earns and costs

All numbers are per megawatt of critical IT load, my arithmetic from the company’s figures.

Money per megawatt
Per megawatt
Rent, a year, the first campus (reported)$1.83M
Rent, a year, the next four campuses (reported)$1.65M to $1.67M
Net operating income, 87% of rent, on $1.68M (estimate)$1.46M a year
Building cost, management’s range (reported)$11M to $13M
Building cost, my base, including borrowing costs (estimate)$12.5M
Net income on cost, my base (calculated)11.7% a year
Net income on cost, if cost is $15.5M, as TopCo 2’s balance sheet suggests (calculated)9.4% a year
Debt at 75% of cost, base, about (estimate)$9.4M
Interest on it, at 7.0% (estimate)$0.66M a year
The 11.7% is the first year of net operating income divided by cost. It is not an internal rate of return: the rent is flat for 15 years and I treat the buildings as worth little after the term unless they are re-let. Source Investor presentation; 10-K FY2026; 10-Q Q1 FY2027 [6][3][2]. Reported figures and my estimates.

Against the alternatives

The honest comparison is with a landlord who finances the same building with long debt. Applied Digital’s project debt on the first campuses cost 9.25%, 6.75% and 7.0%, and the notes have traded below par for the newer two: the 10-Q gives fair values of about $2.0B for $2.15B of 6.75% notes and about $1.5B for $1.59B of 7.0% notes, which I read as yields of roughly 8% to 9%, with the usual caution that the filing rounds to $0.1B.2 The tenant is the credit. For the three newest leases the tenant is investment grade by the company’s account, and for the first it is CoreWeave, which had $35.6B of debt and lost $626M in the second quarter of calendar 2026.14 Lenders therefore see a rent stream from a very good credit on three campuses and a leveraged one on the first.

The second part of the advantage is the structure. Macquarie put $1.825B into TopCo 2 as preferred stock that accrues 12.75% a year and carries a 1.8 times minimum payout, together with 13.5% of the common equity of that subsidiary.3 That bought the company time and cash. It is also the most expensive money in the structure, and it ranks ahead of the shares.

Here is how I see it. The assets are good: powered land, a design the tenants have qualified, and long contracts with credits that are mostly strong. The question is how much of the value goes to the lenders and to Macquarie before it reaches the common shares. Valuation, below, takes this apart.

Management

Wes Cummins, 49, is the chairman and chief executive and a co-founder. He came from technology investing, at Nokomis Capital, and founded an investment firm, 272 Capital.6 Jason Zhang, the other co-founder, became president in January; Saidal Mohmand is the finance chief and Laura Laltrello the operating chief.37 The company had about 256 employees on 31 May 2026.3 I judge a management by how it is paid, what it owns, and what it did with other people’s money.

How they are paid

The proxy reports Cummins’ total pay for FY2026 at $189.2M. Of that, $185.9M is the grant-date value of stock awards. Cash pay was $2.1M, a salary of $875,000 and a $1.2M bonus, and other pay of $1.2M included $1.1M of personal use of the company aircraft. For FY2025 it was $27.7M and for FY2024 $1.2M.7 Zhang’s was $100.0M and Mohmand’s $40.5M.7

What the stock awards reward is clear. In January 2026 Cummins was granted 1.5M restricted stock units worth $45.4M and 4.5M performance units worth $122.1M. The performance units vest in thirds if the average price over any 90 days reaches $50, $75 and $100 within five years, while the price at the grant was $30.26.7 Today’s $17.82 is below all three. The board’s own arithmetic is that at the full $100, he would realise $450M against about $21B of added market value, a share of 2.15%, which it calls below the 25th percentile of the awards it compared.7 Zhang’s units vest on signing leases and getting buildings into service on time; Mohmand’s on net operating income.7

That pays them for the share price, for leases signed, and for megawatts delivered. It does not pay anyone for return on the money put in, for rent per megawatt, for dilution or for keeping debt low. A building that is leased at a thin spread and delivered on time earns the award in full. I note too that the company paid $99.4M in cash in one quarter to cover taxes on vested stock, so stock pay is not free to the other shareholders.2

What they own, and what they sold

Cummins beneficially owns 23.36M shares, 7.8%. Of those, 17.59M are held by a family company and are pledged against a line of credit with JPMorgan; at $17.82 that block is about $313M (calculated).7 I do not know the loan size or terms, so I cannot say how close it is to a margin call. Directors and officers as a group hold 9.5%. The two largest outside holders listed are Hood River Capital at 7.4% and Jane Street at 7.0%, the latter including 15.96M warrants.7

Insider trades in the year to 30 October tell two stories. Between October 2025 and October 2026, Cummins and four directors sold 534,368 shares for about $18.3M, at $21.84 to $38.57, 165,000 of them Cummins’ at $36.42 on 16 January. On 16 October 2026 Cummins bought 55,803 shares at $18.04 and Zhang bought 300,000 at $18.86, about $6.7M in all (calculated).15 A purchase at $18 after sales at $36 is a signal. It is also small beside the $313M of pledged stock.

What they did with capital

The cycle is short: five years as a listed company. Weighted shares were 57M in FY2022 and 292M in the first quarter of FY2027, and 302M at 6 October (calculated).52 The company has sold stock through the market and through a Series G preferred line that converts at 95% of the recent low price, which it can draw down in $150M amounts every seven days, and which it raised to $2.0B in June.32 It has 28.1M warrants outstanding at an average $8.61, 21.5M of them issued to CoreWeave with its leases and since assigned to banks and trading firms.23 In FY2025 it sold $450M of 2.75% convertible notes and paid $51.8M for a capped call and $52.7M for a prepaid forward.11

The record of strategy is mixed. A shareholder class action filed in August 2023 alleges the company overstated the profit of its hosting business and its ability to become a cloud provider; the court stayed the case in September 2025 while a motion to dismiss is pending, and the company cannot estimate a loss.2 The cloud business it pushed was split off in 2026. The buildings pivot has worked on delivery so far.

Related-party dealings need more care than usual. Applied Digital paid $37M in May 2026 to end a guarantee it had given on a roughly $2.4B Babcock & Wilcox contract for Base Electron, in return for Base Electron shares; it lent Base Electron $59M, and it holds B&W warrants whose fair value fell from $90.8M to $34.7M in a quarter, a $56.1M loss.72 Six family members of Cummins are employees, paid $3.3M since 1 June 2025.7 The four top executives were also granted 5.25% of ChronoScale’s shares in units.7 None of this is hidden, and each is approved by a board committee. It does mean that the people running a tenant-funded landlord also have personal stakes in the power company it depends on for its next campus.

Following the incentives, then: the leaders are paid in large amounts of stock for price and growth, they own a lot, and a good part of what they own is borrowed against. That pays them to build more and to keep the share price up. It does not stop them issuing shares at a discount to fund more. The delivery record is good. The capital record is of a company that has raised every kind of money it can find.

Financials

The company went public in 2021 and moved to the Nasdaq in 2022, so there are five fiscal years of operating results, not ten, and the first three are a different business: bitcoin hosting. Revenue rose 72 times from $8.5M to $611M in FY2026 and the company has had an operating loss in every year (calculated).3115 Figures are the latest as recast; FY2024 revenue was $136.6M when first reported and $165.6M in the FY2026 10-K, because of how the cloud business is now shown.3

Applied Digital, five fiscal years and the latest twelve months

US dollars, fiscal years ending 31 May. TTM is the four quarters to 31 August 2026.

Financial summary by fiscal year
FY22FY23FY24FY25FY26TTM Aug 2026
Revenue (reported)$9M$55M$166M$229M$611M$872M
Revenue growth (calculated)–547.9%198.9%38.0%167.4%–
Operating income (reported)−$21M−$43M−$98M−$72M−$236M−$289M
Net income (reported)−$24M−$46M−$150M−$231M−$184M−$351M
Operating cash flow (reported)−$1M$59M$14M−$115M$90M$235M
Capital spending (reported)$58M$131M$142M$682M$2,866M$4,691M
Stock pay (reported)$12M$32M$17M$23M$220M$271M
Stock pay, share of revenue (calculated)144.7%57.9%10.5%9.9%36.0%31.1%
Operating cash less capital spending less stock pay (calculated)−$72M−$105M−$145M−$820M−$2,996M−$4,727M
Weighted shares, millions (reported)57.194.0114.1201.2275.2291.6
Operating cash flow includes cash from tenant fit-out billings and financing-related timing; the last line is not a measure of profit and, since most capital spending is for assets not yet earning rent, it mainly shows how much has been put in. Net income TTM includes a $16.1M loss from the discontinued Ekso business. Source 10-K FY2026; 10-K FY2025; 10-Q Q1 FY2027; SEC XBRL [3][11][2][5]. Reported or calculated from reported data.

What an owner could really take out

Nothing. In the twelve months to August, operations produced $235M of cash, the company spent $4,691M on buildings and equipment, and it paid its people $271M in stock, so the owners’ cash after stock pay and spending was −$4,727M (calculated).23 That is not a fair measure of the business, since most of the $4.7B went into campuses that are not yet earning, but it is the plain fact: every dollar came from lenders, Macquarie and new shares. Reported net loss over the same period was $351M. The gap is the building programme.

A better question is what the finished campuses leave for owners. The whole of Valuation answers it. In short, rent at full build is about $2.4B a year, net operating income about $2.1B, and before the owner sees anything come interest of about $1.0B, debt repayment, overhead of about $0.3B including stock pay, and the Macquarie claim. The finished business is a thin slice.

Quality of earnings

The company’s adjusted measures exclude ChronoScale, stock pay ($59.4M in the first quarter), deal costs and the non-cash write-down of customer incentives. Adjusted EBITDA of $64.4M compares with a GAAP operating loss of $62.4M.2 The adjusted net loss was $4.1M against a reported $221M loss to common after continuing operations. Three items make up the gap that I cannot dismiss as one-off: stock pay of $66.5M a quarter, 42% of revenue other than fit-out billings (calculated); a net $49.5M loss on the Babcock & Wilcox warrants and Macquarie derivatives; and interest of $77.4M, with another $35.7M capitalised into buildings.2 Interest will rise as buildings open and capitalised interest stops.

Debt and preferred stock

The claims that come before the common shares. Face values are principal outstanding.

Debt and preferred stock at 31 August 2026
RateDueFaceFair value
2030 senior secured notes, Polaris Forge 1 (reported)9.25%Dec 2030$2,350Mabout $2.5B
2031 senior secured notes, Polaris Forge 2 (reported)6.75%Mar 2031$2,150Mabout $2.0B
2031 senior secured notes, Polaris Forge 1, third building (reported)7.00%Jun 2031$1,590Mabout $1.5B
Convertible notes, unsecured (reported)2.75%Jun 2030$450M$399M
Revolving credit, drawn (reported)SOFR + 2.25%May 2029$82M$82M
Other loans (reported)7.3% averageto 2031$99Mabout $99M
Total debt (calculated)$6,722M
Macquarie preferred in TopCo 2, carrying value (reported)12.75%, in kindPerpetual$2,011M–
Series E-1 preferred (reported)DividendRedeemable$56M–
Fair values are rounded to $0.1B in the 10-Q. Principal due: $109M in the rest of FY2027, $222M in FY2028, $341M in FY2029, $354M in FY2030, $4,257M in FY2031 and $1,439M after. Scheduled interest: $327M in the rest of FY2027 and $490M in FY2028. A Texas Capital loan of $58.5M requires market value of the shares to stay above $2.0B every trading day. Source 10-Q Q1 FY2027, Notes 9 and 16 and MD&A [2]. Reported; total calculated.

The balance sheet

At 31 August the company had $2.95B of unrestricted cash and $0.73B restricted, and $6.4B of debt on the balance sheet net of costs.2 Most of the cash sits in TopCo 2, which held $2.9B of unrestricted cash and $0.5B restricted; it is tied to Polaris Forge 1 and 2.2 Total assets were $11.7B, of which property and equipment $6.3B, $3.7B of it still under construction. The Macquarie preferred stock is shown outside equity at $2.0B, and shareholders’ equity was $1.6B (reported).2 The company says it has enough liquidity for the next twelve months and all its known plans.2 I read that as covering the plans it has financed, which do not include the 810 MW outside TopCo 2.

The share price since the Nasdaq listing

Last close of each calendar quarter, log scale

  • Close, Q4 2026 $17.82
The share price since the Nasdaq listingQuarter-end closes on a log scale, from $1.05 at March 2022 to $17.82. The lowest close was $0.88 on 13 July 2022 and the highest $49.65 on 28 May 2026.$1$10$50’23’24’25’26The share price since the Nasdaq listingQuarter-end closes on a log scale, from $1.05 at March 2022 to $17.82. The lowest close was $0.88 on 13 July 2022 and the highest $49.65 on 28 May 2026.$1$10$50’23’24’25’26The share price since the Nasdaq listingQuarter-end closes on a log scale, from $1.05 at March 2022 to $17.82. The lowest close was $0.88 on 13 July 2022 and the highest $49.65 on 28 May 2026.$1$10$50’23’24’25’26
Since the May high the shares have fallen 64%. From the July 2022 low to that high they rose 56 times. Source Nasdaq historical [1]. Calculated from reported closes.

Valuation

First, how this goes badly wrong

Before any numbers I ask what would most likely hurt the business or the investment, and work back from there. Here are three, and they feed each other.

The financing does not hold. About $11.5B has still to be spent to finish the 1,410 MW (estimate). The 600 MW in TopCo 2 are mostly funded, but the 810 MW outside it are not, and the company has no project loans for them in the filings I read. The cheapest source it has is a preferred-stock line that turns into shares at 95% of the recent low price, and the shares have fallen 64%.23 A $58.5M Texas Capital loan requires the market value of the shares to stay above $2.0B at every close, against about $5.4B now.2 If the lenders will not fund the unfinished campuses at 70% to 75% of cost at 7%, the shareholders face dilution that may not stop.

A tenant fails, or the contract is restructured. Polaris Forge 1 is $11.0B of the $36.2B, and its tenant is CoreWeave, which had $35.6B of debt, $103.7B of contracted revenue still to deliver and a loss of $626M in its latest quarter.14 The leases were already restructured in March.3 If that tenant struggled, Applied Digital would hold a building worth much less than the debt on it.

The price paid for money. Macquarie’s preferred accrues 12.75% a year in kind and has to be repaid at 1.8 times its $1.825B, about $3.3B, with rate step-ups after October 2030 and a right to force a sale after October 2032.3 Add $6.1B of notes at 6.75% to 9.25% and the project loans to come. The interest on all of that is a large part of the rent. Of the three, I think the third is the most likely to cost the shareholders, because it takes effect even if everything else works.

What an owner gets today, and later

Today, nothing: owner cash after stock pay and spending was −$4.7B over twelve months (calculated).2 On my base, the first cash to the shares arrives in FY2032, from the 2030 to 2031 notes’ refinancing and the Macquarie payout, and over FY2032 to FY2039 it totals about $0.57B, or $1.83 a share before discounting, then the shareholders are asked for money for three years while the buildings are refitted (estimate). Most of the cash comes in FY2045 and later, when the loans are repaid. That is the shape of a lease: the rent pays the lenders first, then the owner of the preferred, and then the shareholders.

Rent the leases pay, year by year

US$ millions a year, base case, fiscal years ending 31 May

  • Rent at full build $2.37B a year
Rent the leases pay, year by yearRent in my base case by fiscal year. It ties to the 10-Q schedule of minimum contracted payments: $468M in FY27, $1,580M in FY28, $2,361M in FY29 and $2,371M a year to FY31, then flat until the leases start to end in FY42. The last bars are my assumed re-letting after the leases end.$0$1B$2B$3B’27’37Rent, FY27: $326MRent, FY28: $1,580MRent, FY29: $2,361MRent, FY30: $2,371MRent, FY31: $2,371MRent, FY32: $2,371MRent, FY33: $2,371MRent, FY34: $2,371MRent, FY35: $2,371MRent, FY36: $2,371MRent, FY37: $2,371MRent, FY38: $2,371MRent, FY39: $2,371MRent, FY40: $2,371MRent, FY41: $2,371MRent, FY42: $2,473MRent, FY43: $2,664MRent, FY44: $2,823MRent, FY45: $2,846MRent, FY46: $2,846MRent the leases pay, year by yearRent in my base case by fiscal year. It ties to the 10-Q schedule of minimum contracted payments: $468M in FY27, $1,580M in FY28, $2,361M in FY29 and $2,371M a year to FY31, then flat until the leases start to end in FY42. The last bars are my assumed re-letting after the leases end.$0$1B$2B$3B’27’32’37’42Rent, FY27: $326MRent, FY28: $1,580MRent, FY29: $2,361MRent, FY30: $2,371MRent, FY31: $2,371MRent, FY32: $2,371MRent, FY33: $2,371MRent, FY34: $2,371MRent, FY35: $2,371MRent, FY36: $2,371MRent, FY37: $2,371MRent, FY38: $2,371MRent, FY39: $2,371MRent, FY40: $2,371MRent, FY41: $2,371MRent, FY42: $2,473MRent, FY43: $2,664MRent, FY44: $2,823MRent, FY45: $2,846MRent, FY46: $2,846MRent the leases pay, year by yearRent in my base case by fiscal year. It ties to the 10-Q schedule of minimum contracted payments: $468M in FY27, $1,580M in FY28, $2,361M in FY29 and $2,371M a year to FY31, then flat until the leases start to end in FY42. The last bars are my assumed re-letting after the leases end.$0$1B$2B$3B’27’32’37’42Rent, FY27: $326MRent, FY28: $1,580MRent, FY29: $2,361MRent, FY30: $2,371MRent, FY31: $2,371MRent, FY32: $2,371MRent, FY33: $2,371MRent, FY34: $2,371MRent, FY35: $2,371MRent, FY36: $2,371MRent, FY37: $2,371MRent, FY38: $2,371MRent, FY39: $2,371MRent, FY40: $2,371MRent, FY41: $2,371MRent, FY42: $2,473MRent, FY43: $2,664MRent, FY44: $2,823MRent, FY45: $2,846MRent, FY46: $2,846M
FY27 shows only the part after 30 October 2026. Flat rent: the minimum payments do not rise between FY29 and FY31. After FY42 the bars are my assumption, not contract. Source 10-Q Q1 FY2027, Note 17; model in this page’s method [2]. Contract figures reported; later years estimated.
Show the numbers
Rent the leases pay, year by year
FY27FY28FY29FY30FY31FY32FY33FY34FY35FY36FY37FY38FY39FY40FY41FY42FY43FY44FY45FY46
Rent (estimate)$326M$1,580M$2,361M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,371M$2,473M$2,664M$2,823M$2,846M$2,846M

What I can’t judge

Three inputs decide the answer and I cannot know any of them. The first is what each megawatt really costs. The company says $11M to $13M; the balance sheet of TopCo 2, which carries $10.3B of assets for 600 MW, $3.4B of it cash, points higher.62 I use $12.5M and show the range. The second is what happens after the leases end. The company says renewals would take total contracted revenue to $86B from $36B, which implies rent about 1.4 times higher if every option is used.4 I do not know who decides: the tenant holds the option. The third is the rate at which buyers will value finished campuses; I have no sourced private-market figure for a data centre leased to a hyperscaler, so I show a table instead of a number.

How I value it

I build the cash that reaches the shareholders year by year to fiscal 2062, in US dollars, from the contracted rent in the 10-Q, a net operating margin, overhead and stock pay, the cost still to be spent, the interest and repayments on the debt, the payout to Macquarie and the loans for the unfinished campuses, and then discount it at a rate for equity.2 Stock pay is a cost, because it is paid with shares that are not available to anyone else. Equity calls, the cash shareholders would have to add if the model runs short, are subtracted at a cost of 8% for the discount on the preferred-stock line. Per-share values use 302.4M shares at 6 October, 7.8M restricted units and 3.0M performance units, plus warrants and converts when the value is above their strikes of $8.61 and $9.75. The chief executive’s 4.5M performance units, with hurdles of $50, $75 and $100, are left out, since the price is under all three.

The rent for FY2027 to FY2031 is the 10-Q schedule; my base contract rent after FY2031 totals $26.6B against the 10-Q’s $26.6B, within 0.1% (calculated).2 The convert is $450M of debt repaid in June 2030 if the value is below $9.75 and becomes shares above it, reduced by the capped call that covers the gap to $14.72.11

The discount rate. I take it from the company’s own securities. The 2031 notes were worth about 93 to 94 cents on the dollar, a yield of roughly 8% to 9%; the most junior outside money, Macquarie’s, costs 12.75% and rises; the common stock ranks below both.23 A rate under 13% for shares behind that much senior claim would not be honest, so I use 13% in the base, 16% in the bear and 12.5% in the bull, which is a little under my own floor because the bull case also assumes cheaper money. I show 9% to 16% below.

Bear, base and bull

My estimates. Each case’s assumptions are in the rows.

Bear, base and bull cases
BearBaseBull
Building cost per megawatt, all in (estimate)$15.5M$12.5M$11.5M
Cost still to spend on the 1,410 MW, including TopCo 2’s remaining work (estimate)$15.8B$11.5B$10.1B
Net operating income as a share of rent (estimate)85%87%88%
CoreWeave pays on Polaris Forge 1 through the term (estimate)No: stops in FY2031, re-let after two yearsYesYes
Rent after each lease ends, as a multiple of today’s, and for how long (estimate)0.55 times, 5 years1.2 times, 15 years1.4 times, 20 years
Refit before re-letting, per megawatt (estimate)$3.0M$2.0M$1.5M
Crypto hosting after its contract ends (estimate)EndsRenews at 60% of profit to FY2035Renews at today’s profit to FY2035
New leases beyond 1,410 MW (estimate)NoneNone1,500 MW, same rent and cost
Loans on unfinished campuses (estimate)70% of cost at 8.0%75% at 7.0%75% at 6.75%
Interest on loans after 2030 (estimate)9.5%7.5%6.75%
Overhead and stock pay, a year (estimate)$340M$300M$300M
Rate I discount the shareholders’ cash at (estimate)16%13%12.5%
First year the shares get cash (estimate)NoneFY32FY33
Value per share (estimate)$0$1.50$8.34
Return a year from the price, to October 2036 (estimate)−100%−13%7%
The bear value is the value to the common after the claims ahead of it. When my model says shareholders would have to keep adding money to hold the position, I show zero, since shareholders cannot owe more than they paid. Convertible notes become shares only in the cases where the value is above $9.75; the capped call covers the part up to $14.72. Source Model in this page’s method [2][3][6][4]. Contract figures reported; everything else my estimates.
Bear
Building costs about $15.5M a megawatt, the level TopCo 2’s $10.3B of assets across 600 MW would imply if all were spent, and the 810 MW outside TopCo 2 are financed at 70% of cost at 8%. CoreWeave stops paying on Polaris Forge 1 in FY2031, and the 400 MW are re-let two years later at about half the rent. Macquarie’s preferred has to be paid off at its 1.8 times minimum. The common holders would be asked for more than the buildings could return, so I put the value at zero.
Base
Everything signed is delivered on the company’s schedule at $12.5M a megawatt. The rent is as contracted, flat, to FY2042 to FY2044. After that tenants use about three quarters of their renewal options at rents about 1.4 times the original and the rest is re-let lower, which I average to 1.2 times for 15 years. Overhead and stock pay run at about $300M a year. Shareholders get their first cash in FY2032, after the preferred is paid off, then less each year as the loans are repaid, and the larger sums only after FY2045.
Bull
Cost falls to $11.5M. Tenants use all their renewals at 1.4 times the rent and the buildings are re-let for 20 years. Applied Digital also signs a further 1,500 MW on the same terms and finances it at 75% of cost at 6.75%. The shareholders’ rate of return required drops to 12.5%.

The base path

My base case, selected fiscal years, US dollars.

The base path
FY27FY28FY29FY30FY31FY32FY35FY40FY42FY45
Rent (estimate)$326M$1.6B$2.4B$2.4B$2.4B$2.4B$2.4B$2.4B$2.5B$2.8B
Net operating income (estimate)$283M$1.4B$2.1B$2.1B$2.1B$2.1B$2.1B$2.1B$2.2B$2.5B
Spent on building (estimate)$3.3B$5.9B$2.3B$0M$0M$0M$0M$0M$0M$0M
Interest paid (estimate)$285M$485M$467M$441M$929M$1.0B$935M$691M$567M$346M
Debt repaid (estimate)$60M$222M$342M$354M$293M$479M$589M$833M$957M$1.2B
Paid to Macquarie to retire the preferred (estimate)––––$3.5B–––––
Cash to the shares, net of calls on them (estimate)–––––$129M$94M−$12M−$1.3B$163M
Debt at year end (estimate)$7.9B$11.6B$13.0B$12.7B$14.4B$13.9B$12.3B$8.6B$6.8B$3.5B
FY2027 is the seven months after 30 October. Interest in FY2027 and FY2028 is paid largely from the reserves counted in cash. The Macquarie payout in FY2031 is the 1.8 times minimum, in October 2030. Source Model; 10-Q Q1 FY2027 [2]. Estimates.

What reaches an owner of the shares, base case

US$ millions, base case, fiscal years ending 31 May

  • Owner cash, FY32 to FY39 $0.7B in total
What reaches an owner of the shares, base caseCash left for the shareholders each year in my base case, after interest, debt repayment, the Macquarie preferred and stock pay. Close to nothing arrives until FY32; small payments to FY39; calls on shareholders when the leases end and the buildings are refitted; larger cash only from FY45.−$1.5B−$750M$0$750M$1.5B’27’37’47Owner cash, FY27: $0MOwner cash, FY28: $0MOwner cash, FY29: $0MOwner cash, FY30: $0MOwner cash, FY31: $0MOwner cash, FY32: $129MOwner cash, FY33: $118MOwner cash, FY34: $106MOwner cash, FY35: $94MOwner cash, FY36: $52MOwner cash, FY37: $39MOwner cash, FY38: $25MOwner cash, FY39: $11MOwner cash, FY40: −$12MOwner cash, FY41: −$39MOwner cash, FY42: −$1,289MOwner cash, FY43: −$1,177MOwner cash, FY44: −$248MOwner cash, FY45: $163MOwner cash, FY46: $887MOwner cash, FY47: $865MWhat reaches an owner of the shares, base caseCash left for the shareholders each year in my base case, after interest, debt repayment, the Macquarie preferred and stock pay. Close to nothing arrives until FY32; small payments to FY39; calls on shareholders when the leases end and the buildings are refitted; larger cash only from FY45.−$1.5B−$750M$0$750M$1.5B’27’32’37’42’47Owner cash, FY27: $0MOwner cash, FY28: $0MOwner cash, FY29: $0MOwner cash, FY30: $0MOwner cash, FY31: $0MOwner cash, FY32: $129MOwner cash, FY33: $118MOwner cash, FY34: $106MOwner cash, FY35: $94MOwner cash, FY36: $52MOwner cash, FY37: $39MOwner cash, FY38: $25MOwner cash, FY39: $11MOwner cash, FY40: −$12MOwner cash, FY41: −$39MOwner cash, FY42: −$1,289MOwner cash, FY43: −$1,177MOwner cash, FY44: −$248MOwner cash, FY45: $163MOwner cash, FY46: $887MOwner cash, FY47: $865MWhat reaches an owner of the shares, base caseCash left for the shareholders each year in my base case, after interest, debt repayment, the Macquarie preferred and stock pay. Close to nothing arrives until FY32; small payments to FY39; calls on shareholders when the leases end and the buildings are refitted; larger cash only from FY45.−$1.5B−$750M$0$750M$1.5B’27’32’37’42’47Owner cash, FY27: $0MOwner cash, FY28: $0MOwner cash, FY29: $0MOwner cash, FY30: $0MOwner cash, FY31: $0MOwner cash, FY32: $129MOwner cash, FY33: $118MOwner cash, FY34: $106MOwner cash, FY35: $94MOwner cash, FY36: $52MOwner cash, FY37: $39MOwner cash, FY38: $25MOwner cash, FY39: $11MOwner cash, FY40: −$12MOwner cash, FY41: −$39MOwner cash, FY42: −$1,289MOwner cash, FY43: −$1,177MOwner cash, FY44: −$248MOwner cash, FY45: $163MOwner cash, FY46: $887MOwner cash, FY47: $865M
Negative bars are money the shareholders would have to add, mostly the refit of the buildings at lease end, which I charge at $2M a megawatt. They are an estimate, and the single largest swing factor after the cost of building. Source Model in this page’s method [2][3][6]. Estimates.
Show the numbers
What reaches an owner of the shares, base case
FY27FY28FY29FY30FY31FY32FY33FY34FY35FY36FY37FY38FY39FY40FY41FY42FY43FY44FY45FY46FY47
Owner cash (estimate)$0M$0M$0M$0M$0M$129M$118M$106M$94M$52M$39M$25M$11M−$12M−$39M−$1,289M−$1,177M−$248M$163M$887M$865M

The price and what it needs

Turn it round. At $17.82, with the converts and warrants it brings, the market values the common at about $6.4B and the whole enterprise at about $10.9B, 31% of the $35.7B of rent contracted (calculated).2 That sounds cheap. But the buildings are not finished: another $11.5B has to be spent, and by completion the claims ahead of the shares are about $15.1B (estimate). Allowing for 3.6 years until then at 13%, the price needs the finished campuses to be worth about $25B, which is 7.1% of their net operating income after overhead. My base is worth about 11% on the same figure.

What the price needs

Reverse discounted cash flow at my rates.

Reverse discounted cash flow
Share count at the price, with the converts and warrants it brings (calculated)361M shares: 302.4M outstanding, 10.7M employee awards, 14.5M from warrants, 33.2M from converts after the capped call
Market value at the price (calculated)$6.4B
Add: debt $6.3B, Macquarie preferred $2.0B, other preferred $0.1B; less cash $3.7B and other assets $0.1B (calculated)$10.9B enterprise value now
Rent contracted over the base terms (reported)$35.7B, of which the enterprise value is 31%
Still to spend to finish, my base (estimate)$11.5B
At completion: debt, Macquarie payout and other claims, less cash (estimate)$15.1B
Net operating income after overhead, FY2030 (estimate)$1.77B
Value of the finished campuses the price needs, after allowing for 3.6 years at 13% (calculated)$25.1B, a rate of 7.1% on that income
The same figure from my base case (calculated)$15.9B, a rate of 11.2%
Discount rate on shareholders’ cash needed to reach the price on my base cash (calculated)Below 2%, which I could not reach
Building cost needed to reach the price on my base (calculated)Below $3M a megawatt
Source Nasdaq; 10-Q Q1 FY2027; model [1][2]. Calculated and estimated.

A rate of 7.1% is a rate for a building that will be rented for ever at rising rents. The rent in these leases is flat for 15 years, then depends on renewal. If you think a hyperscaler campus deserves a 7% to 8% rate because tenants will keep renewing and rents will rise, the price is about right. If you think a flat 15-year contract and a refit deserve 10% or more, the common is worth little. The table shows how quickly that choice moves the answer.

What the price needs, as a rate on finished income

Value of the finished campuses at a given rate on net operating income after overhead of $1.77B, less $15.1B of claims, then back 3.6 years at 13%.

What the price needs, as a rate on finished income
Rate the buyer takes on income after overheadValue of the campuses when finishedLeft for the common after claimsPer share today
6% (estimate)$29.6B$14.4B$25.21
7% (price needs about 7.1%) (estimate)$25.3B$10.2B$18.19
8% (estimate)$22.2B$7.0B$12.68
9% (estimate)$19.7B$4.6B$9.35
10% (estimate)$17.7B$2.6B$5.37
12% (estimate)$14.8B$0$0
This table is not my base case: it is the quick way many property investors would value finished buildings. Share counts include converts and warrants where the value is above their strikes. Source Model; 10-Q Q1 FY2027 [2]. Estimates.

How much the answers move

The base value is a thin slice and it moves a lot. The move is not even. A cost $1M a megawatt lower adds about $1.90 a share, taking the base from $1.50 to $3.43 at $11.5M; a cost $0.5M higher takes it to zero at $13M (estimate). The re-letting assumption moves it from zero, if tenants leave and the buildings sit empty, to $3.00 if rents stay at 1.4 times for 20 years.

Base value by cost

Value per share, my base, changing building cost and what happens after the leases.

Base value by cost and by what happens after the leases
Cost per megawattNo re-letting0.55 times, 5 years1.0 times, 10 years1.2 times, 15 years (my base)1.4 times, 20 years
$11.0M (estimate)$0$0$2.68$4.31$5.82
$12.0M (estimate)$0$0$0.86$2.50$4.02
$12.5M, my base (estimate)$0$0$0$1.50$3.03
$13.0M (estimate)$0$0$0$0$1.25
$14.0M (estimate)$0$0$0$0$0
$15.5M (estimate)$0$0$0$0$0
Zero means the shares are worth nothing on that combination. The shaded base is $12.5M with re-letting at 1.2 times for 15 years. Source Model [2][6]. Estimates.

Base value by discount rate

Value per share, my base, changing the discount rate and what happens after the leases.

Base value by discount rate and by what happens after the leases
Rate on shareholders’ cashNo re-letting0.55 times, 5 years1.0 times, 10 years1.2 times, 15 years (my base)1.4 times, 20 years
9% (estimate)$0$0$0$3.43$7.27
10% (estimate)$0$0$0$2.76$5.78
11% (estimate)$0$0$0$2.24$4.63
12% (estimate)$0$0$0$1.83$3.73
13%, my base (estimate)$0$0$0$1.50$3.03
14% (estimate)$0$0$0$1.25$2.48
16% (estimate)$0$0$0$0.89$1.70
Even at 9% the base is $3.43, because the cash that would reach shareholders is small whatever the rate. Source Model [2]. Estimates.

A few other changes, one at a time on the base: no stock pay, $4.86; overhead at $100M, $2.78; margin of 90%, $2.76; no maintenance spending, $3.06; interest at 9.5% when notes are refinanced, $0.10; CoreWeave stops paying, zero; and adding 1,500 MW of new leases at today’s cost and rent, zero, because new buildings at $12.5M a megawatt earn about what the money costs (estimate). New buildings only help if they cost less than $11.5M a megawatt or rent for more.

The price against the range

The price is 1,084% above my base and 2.1 times my bull. Measured to October 2036 as in the table above, my base returns −13% a year from $17.82, and even the bull returns 7% a year (estimate). I find it hard to write a value this far below a quoted price, so I say what could be wrong. I may be too harsh on the discount rate: 13% for a leveraged claim on investment-grade rent may be high. I may be too harsh on the tail, as the tenants’ renewal options carry rents about 40% higher by my arithmetic from the company’s totals. And a market that pays 7% for finished buildings would be right. What I cannot do is produce a cash flow to shareholders that gets to $17.82 unless the buildings are valued like infrastructure, and I would rather say that than move the numbers to meet the price.

What it is worth, against the price

Value per share, my estimates, against the close in Q4 2026

  • Bear to bull $0 to $8.34
  • Base $1.50
  • Price $17.82
What it is worth, against the priceValue per share: bear $0, base $1.50, bull $8.34. Price in Q4 2026: $17.82, 1084% above the base value. The bear value is zero, so no price gives a margin of safety on my numbers.BEAR$0.00BASE$1.50BULL$8.34Price $17.82What it is worth, against the priceValue per share: bear $0, base $1.50, bull $8.34. Price in Q4 2026: $17.82, 1084% above the base value. The bear value is zero, so no price gives a margin of safety on my numbers.BEAR$0.00BASE$1.50BULL$8.34Price $17.82What it is worth, against the priceValue per share: bear $0, base $1.50, bull $8.34. Price in Q4 2026: $17.82, 1084% above the base value. The bear value is zero, so no price gives a margin of safety on my numbers.$0$10$20$30$40Bear to bull: $0 to $8.34Bear case: $0.00 per shareBEAR$0.00Base case: $1.50 per shareBASE$1.50Bull case: $8.34 per shareBULL$8.34Price in Q4 2026: $17.82Price $17.82Close, Q4 2026
Bear is a total loss for the common, shown as zero because shareholders cannot owe more than they paid. With a bear of zero I do not set a margin-of-safety price above zero. Source Nasdaq historical; model in this page’s method [1]. Values are my estimates.

Against the alternative

A Treasury bond pays a fixed amount and needs none of this. Within this site, the closest case is Oracle, which also builds capacity for AI tenants with debt: its price is 7% above my base value. The supplier side is Vertiv, at 89% above. Applied Digital’s price sits much further above its base value, because its shareholders sit behind more money.1

Quality and price, separately

How good is the business? Better than the stock suggests: delivered buildings, long contracts, strong tenants, and a rent that is paid whether the tenant uses the space. How good is the price? On my numbers, poor, because the claims ahead of the shares absorb almost all of the rent. This looks like a good set of assets with a poor claim on them, at a price that already assumes the assets are worth an infrastructure rate.

How the odds multiply

The price needs several things together. My guesses are in the table. They are not independent, but each is far from certain, and the product is about 9%.

How the odds multiply

Each step is my estimate; the product assumes they are independent.

How the odds multiply
StepMy odds
All 810 MW outside TopCo 2 financed and built on schedule at or below $12.5M a megawatt (estimate)70%
CoreWeave pays through the term on Polaris Forge 1 (estimate)85%
Tenants use their renewals at 1.2 times the rent or better (estimate)65%
The 2030 and 2031 notes and the Macquarie preferred are refinanced without new equity (estimate)70%
Buyers value the finished campuses at a rate of 7.1% or lower (estimate)35%
All five together (calculated)9%
Even if every step holds, I reach the price only if buyers pay a rate of 7.1% or lower, which is the last and least certain step. Source My estimates.

Where this could be in 5 and 10 years

These are my values for the common at two later dates: the present value, at that date, of the owner cash that comes after it, per share on today’s count of 313M plus warrants and converts where the value is above their strikes, after interest, debt repayment, the Macquarie preferred and stock pay, in each year’s dollars. “Owner cash” is cash paid out less money the shareholders would have to add.

Where this could be in 5 and 10 years

Value per share at each date, my three cases.

Where this could be in 5 and 10 years
Value per share, to October 2031Value per share, to October 2036Owner cash paid per share, to October 2036Return a year from today’s price to October 2036
Bear (estimate)$0$0$0−100%
Base (estimate)$2.77$2.70$1.59−13%
Bull (estimate)$29.85$35.28−$1.057%
Bear is zero because the common is wiped out in my bear. Owner cash is net of calls on shareholders. The bull value of $29.85 in year 5 is after shareholders have put in about $15 a share before October 2031, to pay Macquarie and to build the 1,500 MW of new buildings I assume, so it is not a gain of that size on today’s price. Returns are to October 2036, not an internal rate of return. Return a year uses the price of $17.82, value in year 10 plus the cash paid to that date, undiscounted. Source Model in this page’s method [2][3]. Estimates.

For the base to hold at five years, all 1,410 MW must be running by 2028, the Macquarie preferred must be paid off around October 2030 without new equity, and the loans must amortise on schedule. Its value then grows at about the 13% rate I discount at, because only small payouts are made before FY2040. At ten years the base has paid out about $1.59 a share and holds about $2.70, because the shareholders’ cash arrives mostly after FY2045.

The bear differs on cost, $15.5M a megawatt, and on CoreWeave, which stops paying on Polaris Forge 1. The bull differs on rent and life after the leases: 1.4 times for 20 years, 1,500 MW of new leases, and money at 6.75%. The numbers that drive all three are cost per megawatt, rent after the leases end, and the discount rate. The most likely way my base is wrong is cost: $0.5M a megawatt more takes today’s value to zero, and $1M less adds about $1.90 a share.

These are estimates of value, not forecasts of the share price. The market price can sit above or below value for years.

The case for the price

What most people miss

Three facts cut in the company’s favour and are not the usual talking points. First, the enterprise value at $17.82 is about $10.9B, 31% of the $35.7B of rent contracted in the leases, and about $2.4B a year of that rent is flat and take-or-pay from FY2029 to FY2042 (calculated).2 Second, the renewal options are worth more than the first terms: the company puts contracted revenue at $86B if all are used against $36B for the base terms, which by my arithmetic means rent about 1.4 times higher on the renewal years (calculated).4 Third, the chief executive and the president bought shares on 16 October at $18.04 and $18.86, after the chief executive had sold 165,000 at $36.42 in January.15 I do not read intent into it. It is a fact.

The bull case

In plain words: AI computing is short of powered, finished buildings, hyperscalers want them fast, and few people can supply them. Applied Digital has leases for 1,410 MW with large tenants, a repeatable design, a queue of more than 3 GW and a gas plant in prospect. If it builds on time, finances at about 7% and renews its tenants, the leases are worth more than the stock.

Who says so, and what I could verify:

Management. Wes Cummins told The Data Center Frontier Show on 27 January 2026 that 2026 and 2027 are “execution years,” that many announced projects will not become operating facilities, and that Applied Digital had secured its electrical and mechanical supply 18 to 24 months earlier, which he called a big advantage, in my words.12 The show’s write-up says the company is focused on six customers, five hyperscalers and CoreWeave. The filings name only CoreWeave and describe the rest as investment-grade hyperscalers, so I cannot check the write-up’s list. On 29 June 2026 he gave a 6:32 interview on CNBC’s Squawk on the Street; the page has no transcript, so I cannot say what he said and do not characterise it.16 A press account of the October results says management expects about 250 MW of expansion leases by the end of 2026 with lease rates up by more than 15%.13 I could not find the call transcript, so I do not know who said it or what the 15% is measured against. The newest leases pay $1.65M to $1.67M per megawatt-year, so 15% more would be about $1.9M, and no such lease is in the filings yet. I have no time-coded transcripts, so I give episode dates, not timestamps.

Analysts. As reported by 24/7 Wall St. on 26 October, Rob Brown at Lake Street has a $90 target, Jones Trading $70, Wells Fargo $55, Morgan Stanley $41 and Rothschild Redburn $22, the last citing execution, power and pipeline risk, against an average target of $62.44 across 15 analysts.13 I did not open the notes. A $62 price would put the common at about $23B, which is 3.5 times today’s price (calculated).

Holders. Situational Awareness LP, Leopold Aschenbrenner’s fund, listed 15,384,616 Applied Digital shares in its 13F-HR for 30 June 2026, filed 14 August, with a reported value of $469.0M, 2.3% of its $20.24B of reported holdings.17 That value works out to $30.49 a share, 18% below the 30 June close of $37.30. It is not a different quarter-end price: the fund’s 31 March filing divides to $23.74, the close on that day, and for six other holdings in the 30 June table (Micron, CoreWeave, Core Scientific, IREN, Riot and CleanSpark) value divided by shares equals the 30 June close to the cent.171 I could not reconcile this one line and found no 13D or 13G for Applied Digital that explains it. At the 30 June close the shares would be worth about $574M (calculated). I use the filing as filed. The 13F does not show short positions or holdings outside the United States, and I do not know what the fund holds now. This is a dated fact, not a view. The proxy lists Hood River Capital at 7.4% and Jane Street at 7.0%, the latter including 15.96M warrants.7

Not found. I looked for what Chamath Palihapitiya, Jason Calacanis, David Sacks and David Friedberg of the All-In podcast, Gavin Baker and Brad Gerstner have said about Applied Digital and about AI data-centre hosting. A search of the web and of the shows’ listings turned up no episode, clip or transcript that discusses the company, so I cite none. If one exists, I did not find it.

Against reality

If Applied Digital builds the 810 MW outside TopCo 2 for about $12.5M a megawatt and finances them at 75% of cost at 7%, if CoreWeave keeps paying, if tenants use their renewals, and if buyers of finished campuses pay a rate near 7%, the price is possible. Today the first condition is unproven: no financing is in the filings for those campuses. On my base the shares are worth $1.50; the gap is the distance between a 13% required return on a flat, finite contract and a 7% rate for a campus that never stops earning.

What a 10x would take. Ten times $17.82 is $178, or about $64B of market value on today’s share count, which would grow. At a 7% rate on finished income, that needs campuses worth about $79B and income after overhead of about $5.6B, 3.1 times the $1.77B my base reaches in FY2030 (calculated). That is roughly 4,420 MW of leased campuses at today’s rents, against 1,410 MW signed, or about $38B more to build at $12.5M a megawatt, with no fall in rents and no rise in rates. It is also 3.6 times the May high. For a company with this much debt ahead of its shares, tenfold is close to impossible. I would not build a case on it.

What they have to hit

Six numbers on a fixed schedule. Thresholds come from my base case and agree with the signposts below.

What they have to hit
IndicatorTodayWhat the case needsWhere to track itNext check
Megawatts earning rent250 MW live at 1 October 2026; 300 MW expected across North Dakota by end of 20264About 1,410 MW by the second half of 2028, on the company’s dates (estimate)Quarterly release, HPC Hosting update; 10-Q MD&A, Business UpdateQ2 FY2027 results, expected January 2027
Base rent$65.8M in Q1 FY20272$468M for FY2027 and $1,580M for FY2028, as in the minimum-payment schedule10-Q, Note 17, minimum contracted payments; segment tableQ2 FY2027 10-Q, expected January 2027
Financing for the 810 MW outside TopCo 2None found in the filings2Project loans of 70% to 75% of cost at 7.5% or less before May 2027 (estimate)8-K Item 1.01 or 2.03; 10-Q Note 9, DebtAny 8-K; 10-K for FY2027, expected July 2027
Building cost per megawattCompany range $11M to $13M6No more than about $12.5M a megawatt all in (estimate)10-Q cash flow, purchases of property and equipment, divided by megawatts deliveredQ2 FY2027 10-Q, expected January 2027
Share count302.4M at 6 October 2026; Series G sold $275M in Q12No more than about 340M by May 2028 (estimate)10-Q cover page; Note 16, Temporary EquityQ2 FY2027 10-Q, expected January 2027
New leases beyond 1,410 MWNone since 5 June 20262A new lease at $1.65M or more per megawatt-year; the press-reported goal of rates up 15% would be about $1.9M. A tenant exercising a renewal at a higher rent (estimate)8-K and quarterly release, lease announcements; 10-Q Note 17Any 8-K; Q2 FY2027 release
Source 10-Q Q1 FY2027; Q1 FY2027 release; investor presentation [2][4][6]. Thresholds are my estimates.

Where I come down

The delivery record and the strength of the tenants on the newer campuses moved me; the leases are better than the stock’s fall implies. The price did not move me, because it needs finished buildings valued at about 7.1% of their income, and the shareholders sit behind $6.3B of debt, $2.0B of Macquarie preferred stock and a further $11.5B to be spent. What would raise my values most is a loan on the 810 MW at a rate and cost like the first campuses, a cost per megawatt under $11.5M, a tenant using a renewal early at a higher rent, or a sale of a finished campus at a rate near 8% or lower. Any of those would show me what a buyer pays.

Risks, and what would change my view

The three ways this goes badly wrong are at the start of Valuation. These are the rest.

  • Customer concentration. Three tenants were 88% of first-quarter revenue.2 One is CoreWeave, which lost $626M in its latest quarter and had $35.6B of debt.14 A change at either would show up quickly.
  • A lease is only as good as the delivery. Rent starts when buildings are ready for service. Delays in transformers, switchgear and generators were a theme of the January podcast, and the company says dates are subject to construction, permitting and interconnection risk.123
  • Regulation and local opposition. The 10-Q says several states have passed moratoriums on new AI data centres and others are considering them.2
  • Power for the next campus. Polaris Forge 3 depends on a gas plant from a company the chief executive and others own and run, and the agreement can be cancelled if it does not reach financial close by 31 March 2027.2
  • Dilution. The preferred-stock line converts at 95% of the recent low price, above a floor price the board can lower; 128,750 Series G shares became 5.2M common shares after the quarter.2 A lower price means more shares for the same money.
  • Pledged shares. 17.6M of the chief executive’s shares secure a bank credit line.7
  • Lawsuits. A securities class action and a derivative claim are pending; the company cannot estimate a loss.2
  • Key people. Cummins and Zhang hold both the company’s top jobs and stakes in Base Electron.7
  • Legacy hosting. One crypto customer provides $154M a year and its contract ends in about a year.3

Geopolitical risk, and what it means for the value

Applied Digital has little direct exposure to other countries. The buildings are in North Dakota, Louisiana and Alabama, the tenants are American, and the tenants buy the chips. The one foreign step is Finland: an agreement for up to about 1 GW of potential power, nothing built.4 I rerun my base for four routes, one at a time.

CoreWeave. It is the tenant on 400 MW, $11.0B of the $36.2B. If its subsidiary stopped paying on Polaris Forge 1 from FY2031, my base goes to zero. I put that at about one in seven, from my odds table and CoreWeave’s $35.6B of debt and $626M quarterly loss.14

North Dakota and US power policy. Tenants pay for their own power, so a higher power price is their cost.3 The exposure is permission and delay. A North Dakota legislative committee on data centres met at the end of August, and a candidate for the Public Service Commission called in May for a halt on new data centres until the 2027 session.1819 The legislature and the commission decide; I found no law or order that stops a leased campus. The nearer risk is Polaris Forge 3, whose gas plant has a 31 March 2027 financial-close deadline. I put a miss at about one in three, because the filings show no financing with five months left.2 A year’s delay takes the base to $0.60.

Tariffs on equipment. The 10-K says tariffs have affected power and cooling gear and that the company cannot predict trade policy.3 A May 2026 analysis says copper has carried a 50% duty since 1 August 2025, and that switchgear and large generators were left off the April 2026 list of derivative products.20 The company says it bought early; I cannot tell how much of the gear for the 810 MW outside TopCo 2 is covered. Rents are fixed, so extra cost falls on the shareholders.

GPU export controls. They bind the tenants, not the landlord. In January 2026 the US moved some chip sales to China to case-by-case review, while Blackwell-class chips stayed under a presumption of denial.21 Contracted rent is take-or-pay and does not move. What moves is demand for the next lease: with none, my bull falls from $8.34 to $7.11.

What is in the price? At $17.82 the price needs a 7.1% rate on finished income, and it sits above my bull, so I see no sign it has priced any of these. The rows are one at a time and do not add up.

Geopolitical scenarios

Value per share after each, one at a time. My base is $1.50.

Geopolitical scenarios
ScenarioWho decidesMy oddsValue per share after
CoreWeave stops paying on Polaris Forge 1 from FY2031 (estimate)CoreWeave and its lendersAbout 1 in 7: my odds table, and its $35.6B of debt$0
The gas plant misses financial close, Polaris Forge 3 a year late (estimate)Base Electron and its lendersAbout 1 in 3: no financing in the filings, five months left$0.60
Tariffs add $0.3M a megawatt (2.4%) to the cost still to spend (estimate)US governmentNo odds; some duties already apply$0.51
Renewals at 1.0 times today’s rent, not 1.2 times, after state rules or power costs (estimate)Tenants; the stateNo odds$0.48
No new leases beyond 1,410 MW after chip supply curbs (bull case) (estimate)US Commerce Department, CongressNo oddsBull $7.11
Odds are my judgement with the basis stated, not forecasts. I leave odds off where I have no basis for a number. Each row reruns the model with the one change. Source Model; 10-K FY2026 risk factors; 10-Q Q1 FY2027 [3][2]. Estimates.

What would change my view

Signals that move my values, in either direction.

Signposts
SignalTodayRaises my valueLowers my value
Financing for the 810 MWNone found2Loans of 75% of cost at 7% or lessEquity or preferred stock used instead, or rates above 8%
Cost per megawatt$11M to $13M claimed6Below $11.5MAbove $14M
RenewalsNone yet; options imply 1.4 times rent4A tenant exercising early at a higher rentTenants signalling they will not renew
CoreWeaveLeases restructured in March; guarantees and a $50M letter of credit3Rated debt, steady rent paymentsLate rent, a further amendment or a failed refinancing
Share count302.4M2Flat after the 810 MW are financedAbove 340M before the campuses open
Market value of the sharesAbout $5.4B1Above $2.0B with roomNear the $2.0B covenant on the Texas Capital loan
Source 10-Q Q1 FY2027; 10-K FY2026 [2][3]. Thresholds are my judgement.

Sources

  1. 1APLD daily closes, Nasdaq.com historical API, 1 April 2022 to 30 October 2026 (opens in a new tab)PriceNasdaq · 30 Oct 2026 · Close/Last on 10/30/2026 = $17.815 (Nasdaq Global Select); also $17.815 on the Yahoo Finance chart feed; high close $49.65 on 28 May 2026; low close $0.88 on 13 July 2022; 30 June 2026 close $37.30 · Accessed 31 Oct 2026↩︎
  2. 2Applied Digital Form 10-Q, quarter ended 31 August 2026 (opens in a new tab)FilingSEC EDGAR · 7 Oct 2026 · Balance sheet, cash flow, Note 9 debt and fair values, Note 12 TopCo 2, Note 16 preferred, Note 17 minimum contracted payments ($35.7B), Note 21; MD&A; Item 5 Base Electron PPA; cover share count 302,387,140 at 6 Oct 2026 · Accessed 31 Oct 2026↩︎
  3. 3Applied Digital Form 10-K, fiscal year ended 31 May 2026 (opens in a new tab)FilingSEC EDGAR · 29 Jul 2026 · Item 1 (campus table, 1,410 MW, $36.2B); Item 7 (financing, CoreWeave amendment, Macquarie terms); statements; Notes 9, 16, 17 · Accessed 31 Oct 2026↩︎
  4. 4Applied Digital press release, fiscal first quarter 2027 results (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 7 Oct 2026 · Revenue, NOI $58.8M, adjusted EBITDA, live capacity 250 MW, $36B and $86B contracted revenue (base and with renewals), Finland, Base Electron · Accessed 31 Oct 2026↩︎
  5. 5Applied Digital company facts (XBRL), SEC EDGAR (opens in a new tab)DataSEC EDGAR · 31 Oct 2026 · Annual revenue, operating loss, net loss, cash flow, stock pay, weighted shares, FY2021 to FY2026 · Accessed 31 Oct 2026↩︎
  6. 6Applied Digital investor presentation, April 2026 (Ex. 99.2 to 8-K) (opens in a new tab)FilingSEC EDGAR · 23 Apr 2026 · Capex $11M to $13M per MW; NOI margins 85% to 88%; Macquarie terms; example of 70% to 80% loan to cost · Accessed 31 Oct 2026↩︎
  7. 7Applied Digital proxy statement (DEF 14A) for the 2026 annual meeting (opens in a new tab)FilingSEC EDGAR · 25 Sep 2026 · Summary compensation table; CEO stock-price hurdles; beneficial ownership at 16 Sep 2026; related-party transactions (Base Electron, ChronoScale) · Accessed 31 Oct 2026↩︎
  8. 8Daily closes for CRWV, IREN, CIFR, WULF, CORZ, NBIS, ORCL, VRT, BE, NVDA, AMZN, MSFT, Nasdaq.com historical API (opens in a new tab)PriceNasdaq · 31 Oct 2026 · Closes on 28 May and 30 October 2026 for the bar chart; same pattern for the other symbols · Accessed 31 Oct 2026↩︎
  9. 9Applied Digital filing index and former names, SEC EDGAR submissions (opens in a new tab)DataSEC EDGAR · 31 Oct 2026 · Former names: Applied Blockchain, Inc. from 26 April 2021 to 8 February 2023; Form 4 list · Accessed 31 Oct 2026↩︎
  10. 10Applied Digital press release, fiscal fourth quarter and full year 2026 results (Ex. 99.1 to 8-K) (opens in a new tab)FilingSEC EDGAR · 27 Jul 2026 · Lease signings, CoreWeave credit enhancement statement, quarter results · Accessed 31 Oct 2026↩︎
  11. 11Applied Digital Form 10-K, fiscal year ended 31 May 2025 (opens in a new tab)FilingSEC EDGAR · 30 Jul 2025 · FY2023 to FY2025 statements; convertible notes (conversion price about $9.75; capped call cap $14.72) · Accessed 31 Oct 2026↩︎
  12. 12Applied Digital CEO Wes Cummins on the hard part of the AI boom: execution, The Data Center Frontier Show (opens in a new tab)PodcastData Center Frontier · 27 Jan 2026 · Host Matt Vincent; episode page with write-up; no time-coded transcript, so I give no timestamps · Accessed 31 Oct 2026↩︎
  13. 13Applied Digital keeps cratering: this analyst keeps insisting it’s going to jump by 390% (opens in a new tab)News24/7 Wall St. · 26 Oct 2026 · Press account of analyst targets (Lake Street, Jones Trading, Wells Fargo, Morgan Stanley, Rothschild Redburn) and a management quote on lease yields; I did not open the research notes · Accessed 31 Oct 2026↩︎
  14. 14CoreWeave Form 10-Q, quarter ended 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 12 Aug 2026 · Debt $35.6B principal; Q2 net loss $626M; interest expense $640M; remaining performance obligations $103.7B · Accessed 31 Oct 2026↩︎
  15. 15Applied Digital Forms 3 and 4 (insider transactions), 29 October 2025 to 16 October 2026 (opens in a new tab)FilingSEC EDGAR · 16 Oct 2026 · Cummins purchase 55,803 sh at $18.04 and sale 165,000 sh at $36.42; Zhang purchase 300,000 sh at $18.86 (accession 0001900445-26-000006); director sales; my tally of Form 4 transaction codes P and S · Accessed 31 Oct 2026↩︎
  16. 16Watch CNBC’s full interview with Applied Digital CEO Wes Cummins, Squawk on the Street (opens in a new tab)VideoCNBC · 29 Jun 2026 · 6:32 video; the page carries no transcript, so I cannot say what was said · Accessed 31 Oct 2026↩︎
  17. 17Situational Awareness LP Form 13F-HR, period 30 June 2026 (opens in a new tab)FilingSEC EDGAR · 14 Aug 2026 · APPLIED DIGITAL CORP, COM NEW, CUSIP 038169207: 15,384,616 shares, value $469,022,807; total reported value $20,242,292,228; the 13F-HR for 31 March 2026 (accession 0002045724-26-000008) lists 13,478,438 shares, value $319,978,118 · Accessed 31 Oct 2026↩︎
  18. 18North Dakota committee reviews data center impacts, zoning, and state policy (opens in a new tab)NewsValley News Live · 2 Sep 2026 · Artificial Intelligence and Data Center Committee meeting on grid impacts and regulation · Accessed 31 Oct 2026↩︎
  19. 19Republican candidate for Public Service Commission calls for moratorium on data center development (opens in a new tab)NewsKFGO · 19 May 2026 · Candidate Chris Olson asks for a moratorium until the 2027 legislative session · Accessed 31 Oct 2026↩︎
  20. 20The Impact of Tariffs on the AI Data Center Buildout (opens in a new tab)AnalysisCSIS · 14 May 2026 · 50% copper duty from 1 August 2025; April 2026 derivative list leaves out switchgear and large generators; I did not check the proclamation text · Accessed 31 Oct 2026↩︎
  21. 21BIS opens the door to increasing AI chip exports to China (opens in a new tab)Law-firm noteFenwick · 21 Jan 2026 · BIS rule of 15 January 2026: H200-class chips to China case by case, Blackwell-class under presumption of denial; I did not read the rule · Accessed 31 Oct 2026↩︎

How the figures are labelled

(reported)Reported: taken from a filing or a price feed, as printed.

(calculated)Calculated: arithmetic on reported figures, such as a margin or a growth rate.

(estimate)Estimate: my judgement, such as a case value or an assumption.

The price

Close in Q4 2026: $17.82, from Nasdaq [1], equal to the Yahoo Finance chart feed. Retrieved in Q4 2026. The fiscal year ends on 31 May. The balance sheet is that of 31 August 2026 and the share count that of 6 October 2026; the second-quarter report, due in January 2027, comes after the price date. Per-share values use 302.4M shares at 6 October, 7.8M restricted units and 3.0M performance units, warrants by the treasury method (28.1M at an average $8.61), and the convertible notes (46.1M shares at about $9.75, reduced by the capped call to $14.72) when the value is above their strike. The chief executive’s 4.5M performance units are left out.

The valuation

Cash to the shareholders year by year from 30 October 2026 to fiscal 2062, discounted at 13% (16% bear, 12.5% bull) from the price date, each year at its midpoint. Rent is the 10-Q schedule of minimum payments for FY2027 to FY2031 and the contracted terms after, split by campus. Net operating income is 87% of rent (85% bear, 88% bull), less overhead of $150M and stock pay of $150M a year, growing 4% and 3%, less maintenance of 0.5% of cost a year, and refit at lease end. Cost still to spend is the cost per megawatt times 1,410 MW less $6.1B I estimate is already spent, split between TopCo 2 (600 MW) and the other campuses (810 MW). Loans on the unfinished campuses cover 75% of cost at 7.0% and amortise 60% over 15 years. The existing notes follow the 10-Q principal schedule to FY2030, with the $4.26B due in FY2031 refinanced at 7.5% over 20 years, 60% amortised. Macquarie’s preferred accrues 12.75% in kind and is paid at the greater of 1.8 times $1.825B and the accreted amount in October 2030; its 13.5% share of TopCo 2’s common is bought out at 112.5% as a deduction from cash paid out. Cash and the other assets I count are $3.68B of cash and restricted cash less $0.35B kept as reserves, plus $0.12B of investments and the Base Electron loan. ChronoScale’s cloud business, 96% owned, is given no value because I could not value it and it is small; the Ekso business was sold on 30 September. Tax is 21% on taxable income from FY2033, with depreciation over 20 years. Calls on the shareholders cost 8% more. The odds in Section VI are my guesses and are not used in the values.

The model is in my scratch folder and reproduces the 10-Q schedule of rent to within 0.1% after FY2031. There is no margin-of-safety price above $0, because the bear value is zero. No rating: the page states a range and the price, and leaves the decision to the reader.

Research, not investment advice. Figures as of .

Legal information and disclosures

These are my own views as of the update shown on this page. They can change without notice, and I have no duty to update them. Past performance does not indicate future results, and any investment can lose money.

This is for education only. It is not investment, legal, tax or accounting advice, and it is not an offer to sell or a solicitation to buy any security in any jurisdiction. It does not consider your goals or circumstances.

Figures from company filings and other third parties are believed to be reliable, but I have not independently verified them and cannot guarantee them. Bear, base and bull values, and anything marked as an estimate, are my own and rest on assumptions that may prove wrong.

Please do not copy or republish this material without my written consent.